MRPC Beam Test @ GSI Yongjie Sun University of Science and Technology of China

Preview:

Citation preview

MRPC Beam Test @ GSI

Yongjie Sun

University of Science and Technology of China

14th CBM collaboration meeting 206 Oct. 2009

Index

Test setup Preliminary results of 3 prototypes Summary

14th CBM collaboration meeting 306 Oct. 2009

Accelerator

14th CBM collaboration meeting 406 Oct. 2009

Setup

Our Beam Test Experiment

FOPI at Cave B

14th CBM collaboration meeting 506 Oct. 2009

6m

Setup

ProtonBeam

Pb

2m

42 cmPMT 1,2PMT 3,4

PMT 5,6TSU MRPC

USTC MRPC

Platform PlatformPlatform

xy

14th CBM collaboration meeting 606 Oct. 2009

Photo of the setup

14th CBM collaboration meeting 706 Oct. 2009

Beam

Proton beam,Kinetic energy: 3.5 GeV/c

14th CBM collaboration meeting 806 Oct. 2009

DAQ Logic

T

D

C

Q

D

C

PMT 1-4(5)

DiscriminatorNIMECL VULOM, Logic

Delay NIMECL

LMRPC1-6 (left)7-12(right)

FEE

Delay Discriminator NIMECL

Delay

Delay

Gate

Trigger area: 2 cm x 4 cm (without back_scint.)

STOP

14th CBM collaboration meeting 906 Oct. 2009

Index

Test setup Preliminary results of 3 prototypes Summary

14th CBM collaboration meeting 1006 Oct. 2009

MRPC structure (endview)

5 x 250μm gaps

5 x 250μm gaps

Readout strips

HV

2.5cm

Readout strips: 2.5 cm x 50 cmHV electrode: Licron spray ~40 MΩ/□

Made of window glass of 0.7 mm thick

14th CBM collaboration meeting 1106 Oct. 2009

MRPC #1 (topview)

55 cm

24.1cm

2.5cm

0.6cm

Gaps between strips: 0.6 cm

14th CBM collaboration meeting 1206 Oct. 2009

MRPC #1

+iso-butane 5%+Freon

14th CBM collaboration meeting 1306 Oct. 2009

ADC1 ADC2

ADC3 ADC4

<t 1

-(t 3

+t 4

)/2>

ADC1

<t 2

-(t 3

+t 4

)/2>

ADC2

<t 3

-(t 1

+t 2

)/2>

ADC3ADC4

PMT calibration

<t 4

-(t 1

+t 2

)/2>

((t3+t4)-(t1+t2))/4

Resolution~67 ps

14th CBM collaboration meeting 1406 Oct. 2009

T-(t1+t2+t3+t4)/4

T-(t1+t2+t3+t4)/4

T-(

t1+

t2+

t3+

t4)/

4ADC

<T-(

t1+

t2+

t3+

t4)/

4>

ADC

MRPC CalibrationIntrinsic timing resolution = 67 ps (including momentum spread)

14th CBM collaboration meeting 1506 Oct. 2009

Efficiency and resolution plateau

65 ps

97%

14th CBM collaboration meeting 1606 Oct. 2009

Position scan (±7 kV)

No significant efficiency drop in the gap

Trigger Area: 2 cm wide

From both “charge sharing” and cross talk.

14th CBM collaboration meeting 1706 Oct. 2009

Cross Talk

Trigger on the strip center:

“Cross talk” at neighbor strips: 3%

Trigger Area: 2 cm wide

“Cross talk” at next-to-neighbor strips: ~2%

Require valid TDC on two ends

14th CBM collaboration meeting 1806 Oct. 2009

TDC vs. QDCValid TDCs and valid QDCs (3 sigma above pedestal)

Valid TDCs

14th CBM collaboration meeting 1906 Oct. 2009

MRPC #2 (topview)

Top/bottom pcb

The readout strips are “hollowed-out” alternately.

Removed: 5 mm x 4

Left: 1 mm x 5

Removed: 2.5 mm x 9

Left: 0.25 mm x 10

14th CBM collaboration meeting 2006 Oct. 2009

MRPC #2

Valid TDCs and QDCs

14th CBM collaboration meeting 2106 Oct. 2009

Efficiency vs. Position

Valid TDCs

14th CBM collaboration meeting 2206 Oct. 2009

Valid TDCs and valid QDCs (3 sigma above pedestal)

14th CBM collaboration meeting 2306 Oct. 2009

MRPC #3 (topview)

55 cm

24.1cm

2.5cm0.7cm

Gaps between strips: 0.7 cm (upper part)

0.8 cm (lower part)

0.8cm

14th CBM collaboration meeting 2406 Oct. 2009

MRPC #3

14th CBM collaboration meeting 2506 Oct. 2009

Efficiency vs. Position

Valid TDCs

14th CBM collaboration meeting 2606 Oct. 2009

Summary

Three prototypes were successfully tested. Efficiency: > 97% Time resolution: 60-70 ps Cross talk: < 3%

With position from silicon detectors, the data will be further analyzed.

Thank