MSX Infrastructure - Heating Hot Water East Campus Drive Work Phase Plan

Construction of Heating Hot Water piping project along the East Campus Drive will start on 3/22/18, and is expected to be completed by 6/8/18. The work involves trenching and underground pipe placement operations for several weeks causing intermittent traffic delays between 7:00 AM and 4:00 PM as the construction progresses in short segments. One lane would be open at all times at East Campus Drive with traffic control using flaggers and signage. Please use caution when walking near construction areas. Pending investigation and coordination, further updates for remainder of work segments throughout South campus will be provided in near future.

S O U T H C A M P U S D R I V E

E8

EA

ST

C

AM

PU

S

DR

IV

E

WE

ST

C

AM

PU

S

DR

IV

E

B E A C H D R .

S E V E N T H S T R E E T

M

M

M

E11

E10

E7

G15

E9

AS ANNEX

BKS

CAFE

EED

FO2

FO3

FO4

FO5

FCS

FA1

FA2

FA3

FA4

CLA

LAB

LH

LA1

LA2

LA3 LA4

LA5

LIBMHB

MIC

MLSC

MMC

PH1

PH2 PSY

SOR

TA

USU

UTC UT

HSCI

CP

HHW work & staging at Hard Fact Hill (3/7/18 - 5/21/18)

*One lane will beopen at all times at East Campus Drive

LEGEND

Future routing and phasing TBD

HHW work (3/22/18 - 6/8/18)

Fence

For questions, please contact PPFM Customer Services at (562) 985-8246