New alternatives for financing a river dredging

project (Argentina)

Raul S. Escalante – Sebastián García – Martín D. Civeira

HIDROVIA SA

1

The world

2

Argentina

General location

3

Argentine Waterways

3.000 km

4

Hidrovía S.A. is a bi-national Company formed by:

• Jan de Nul NV (from Belgium)

• Emepa S.A. (from Argentina)

With the object of doing: • Capital and maintenance dredging Jan De Nul• Aids to Navigation system Emepa

5

Waterway in charge of Hidrovía

Santa Fe – Confluencia640 Km

Santa Fe – Ocean1000 Km

• Owner: Argentine Government

• Concession Expiring: 2021

• Risk Contract

• Incomes:

Santa Fe- Ocean: Toll Santa Fe- Confluencia: Argentine Government Financing

Dredging and AtoN services in Argentina

25 ft navigable depth

34 ft navigable depth

Year 2011

Santa Fe – Ocean Waterway

8

10 ft navigable depth

Year 2011/ 2012

Santa Fe - Confluencia

9

Santa Fe – Confluencia640 Km

Santa Fe – Ocean1000 Km

Vessels

• Capital and maintenance dredging

• Bathymetric surveys for depth control

• Aids to Navigation: deployment and maintenance

• Tide, waves and wind measurements

• Environmental Management Plan

• Projects and Studies Department

• Traffic Control

Tasks performed

Total goods movement (international and domestic) in the waterway (SFO) – Year 2010

Total: 111 million tons

Total goods movement (international and domestic) in the waterway (SFN) – Year 2010

(metric tons)

Total: 16 million tons

Toll and Subsidy 1995 – 2010Santa Fe – Ocean

14

1,2 $ / Ton

15

Toll 2010Santa Fe – Ocean

Toll Formula

16

T = TD + TAtoN

TD: Dredging toll

TAtoN: Aids to Navigation toll

Toll Formula - AtoN

17

TAtoN = tb x NRT

NRT: net register tonnagetb: AtoN coefficient ($/ton)

Toll Formula - Dredging

18

TD = td x CF x NRT

td: Dredging coefficient ($/ ton)

CF: Correction FactorNRT: net register tonnage

Toll Formula - Dredging

19

Commodities (soybean) price evolution

20

Port and River Costs• River Pilotage• Variable Port costs: berth, different vessel and passenger taxes, tug… • Fixed Port costs: customs, maritime agency…

21

Costs Compared

22

• Pilotage (round trip Recalada-Rosario) 2,35 • HV Toll 1,20 • Tugboat 0,79 • Port taxes 0,30 • Maritime Agent 0,29 • Berth and port facilities (per day) 0,10 • Commodities (soybeam Chicago) + 515,00

Other PracticesShort Dredging Contract

• Bidding process• Time consuming• Administrative aspects• Siltation after end of contract• Possible delays in payment

23

Other PracticesPublic Dredging

• Governments can sometimes be quite efficient, but...

• Delays• Objectives not accomplished• More “relaxed” controls

24

Dredging is an Aid to Navigation

25

Conclusions• Public financing is difficult to maintain through

the years• Dredging and AtoN works in charge of the

Government sometimes are not as efficient as they should

• Our financing depends only on vessels using the waterway, which reasonable toll fees

26