NEW CAMPUS PROPOSALS

Preview:

DESCRIPTION

INTRODUCTION. NEW CAMPUS PROPOSALS. ARCHITECTURAL TECHNOLOGY COURSES INVOLVED. ACH 150 Construction Documents II 2 nd Semester Drafting/Design Studio Normal project – advanced residential 11 students ACH 250 Construction Documents IV 4 th Semester Drafting/Design Studio - PowerPoint PPT Presentation

Citation preview

INTRODUCTION

ARCHITECTURAL TECHNOLOGY COURSES INVOLVED ACH 150

Construction Documents II○ 2nd Semester Drafting/Design Studio○ Normal project – advanced residential○ 11 students

ACH 250Construction Documents IV

○ 4th Semester Drafting/Design Studio○ Normal project – advanced commercial○ 3 students

TIME LINE FOR SEMESTER WEEKS 1-2

TOWN PLANNING

WEEKS 3-4CAMPUS PLANNING

WEEKS 5-16BUILDING PROJECT

PROCESS

Town PlanStudents divided up into three teams

○ Student from ACH 250 acting as team coordinator

Analysis of surrounding area○ Tour of area○ In-class and outside of class work○ End product – sketches

PROCESS

Analysis of ESH siteClass workField tripBrown bagEnd Product

○ Digital layout of campus

PROCESS

Building ProjectTeam conceptEach team has member from ACH 250ACH 150

○ 3-4 students○ Each student had specific tasks

ACH 250○ Designed addition alone

Total classroom hours – approx. 75 hours

CONTEXT

LEXMARK

TRANSY

BCTC

UK

IMPORTANTINTERSECTION

PROPOSED & EXISTINGSTREETS FOR LINKAGESTO PROPOSED &EXISTING RESIDENTIALAREAS

CEMETERY

EASTERN STATE HOSPITAL

LEXMARK

YMCA

HOPE CENTER

HEALTH CENTER

COOLAVINAPTS.

COOLAVINPARK

RAILROAD

FLORENCE CRITTENTON

HOME

EASTERN STATE HOSPITAL

ADMINISTRATION

EASTERN STATE HOSPITAL

A BUILDING ONLY AN ARCHITECT COULD LOVE

OLDLAUNDRYFACILITY

CAMPUS PLAN Program

AdministrationStudent ApartmentsStudent CenterBookstoreFood Service & CaféAuditoriumCont. Ed. & TrainingDaycareFaculty OfficesAmphitheaterWalking TrailsParking

EXISTING ESH ADMIN. BLDG. Program

Spaces common to both additions○ General Offices○ Conference Rooms

ACH 150○ Break Room & Kitchen○ Presidential Office Suite

ACH 250○ Elevator○ Lounge/lobby○ Gallery/Museum

EXISTING ESH ADMIN. BLDG. CHARACTERISTICS

Common○ Two-story – first floor aligns with second floor of existing building○ Additions cannot obscure building front○ No major renovations proposed for existing building○ Design of additions not intended to relate to earlier campus plans

ACH 150○ Project characteristics

Residential scale Intended to be more reflective of existing architecture

ACH 250○ Project characteristics

Commercial scale Intended to be modern with some characteristics of existing

End Product○ Construction documents○ Produced using Revit Architecture 2008

Recommended