NILKAMAL FORMWORK

Preview:

Citation preview

Plastic Formwork

www.nilkamal.com

Nilkamal

WHY PLASTIC?

Geoplastthe GEOPLAST formwork system

Columns:

round, square or

rectangular

Walls:modular wall

panels

Slabs:full and

ribbed slabs

Nilkamal www.nilkamal.com

GEOTUBdia 25 – 100 cmSq. 20 to 60 cm

GEOPANEL GEOSKY & SKYRAIL

plastic formworkwhy plastic formwork?

why plastic formwork?

Nilkamal www.nilkamal.com

formwork?

why plastic?the history: wood formwork

Wood was the material traditionally used to form concrete. It has some disadvantages:

it is slow to erect and dismantle;

not more than 20 or 30 usages;

Nilkamal www.nilkamal.com

not more than 20 or 30 usages;

skilled labour required;

suffers moisture;

job-site waste is high;

environmental issues (deforestation).

why plastic?the history: steel-frame formwork

- Speed of erection and dismantling;

- Lifetime longer than wood;

- The concrete finish superior to wood.

Nilkamal www.nilkamal.com

The biggest issues with steel?

Very heavy and expensive

High maintenance cost

High logistic cost

GeoplastGeoplast chose a special plastic for its formwork system:ABS (Acrylonitrile butadiene styrene):

- resistant and tough, very good shock absorbance

- mechanically stable under loads

Plastic formwork

Nilkamal www.nilkamal.com

- mechanically stable under loads

- very smooth and impervious surface

- temperature tolerant

- recyclable

Geoplastthe GEOPLAST formwork system

Principles common to the Geoplast formwork system:

- Very low weight

- Reusability – 100 pours at least

- Simplicity – “what ain’t there can’t break”

Nilkamal www.nilkamal.com

- Simplicity – “what ain’t there can’t break”

- Few, common accessories –one single pin/handle works for all systems

Geoplastplastic does the job

Horizontal displacement at the centreline of the panel - Eastern Side

instruments no. 6-7-8-9-10

1,30 1,33 1,87300

instrument no. 9

Horizontal displacement at the centerline of the panel - Northern Side

instruments n° 1-2-3-4-5

2,22

0,89

-0,16

0,65

2,88

0,92

1,80

-0,22

1,15

3,54

0,05

0,89

0,95

3,02

1,94

0

50

100

150

200

250

300

-1,00 -0,50 0,00 0,50 1,00 1,50 2,00 2,50 3,00 3,50 4,00

horizontal displacement [mm]

vert

ical p

osit

ion

of

the in

str

um

en

t [c

m]

t=10'

t=15'

t=30'

instrument no.

instrument

instrument no.3

instrument no.4

instrument

Independent testingmeasured that

Geoplast formwork resists

to a concrete pressure of 72 kN/m2.

Nilkamal www.nilkamal.com

1,67

2,12

1,03

2,86 3,65

1,42

2,74

2,03

3,16

1,21

2,45

2,00

0

50

100

150

200

250

-1,00 -0,50 0,00 0,50 1,00 1,50 2,00 2,50 3,00 3,50 4,00

horizontal displacement [mm]

ve

rtic

al

po

sit

ion

of

the

in

str

um

en

ts [

cm

] t=10'

t=15'

t=30'

instrument

instrument

no.10

instrument

instrument

no.7

Spostamenti orizzontali alla distanza L=135cm dall'angolo

strumenti n° 5-6-7

5,62

-1,71

-3,33

-4,11

-2,49

5,21

-3,56

-2,74

2,96

0

50

100

150

200

250

300

-6,00 -4,00 -2,00 0,00 2,00 4,00 6,00

spostamento orizzontale [mm]

qu

ota

vert

icale

str

um

en

to [

cm

]

t=10'

t=25'

t=180'

strumento

strumento

strumento

why plastic?Independent testingTensile strenght

Laboratory testing of the handles measured an

average tensile strenght (rupture) of 1,178.2 kg

Nilkamal www.nilkamal.com

why plastic?Weight: plastic formwork (Geopanel) weighs 18 kg/m2

wood = ca. 18 kg/m2 (±0%)

aluminium = ca. 30 kg/m2 (+67%)

steel frame + plywood = ca. 40 kg/m2 (+220%)

Speed: plastic formwork does not need heavy equipment, so

it is not necessary to wait for cranes, trucks or other

the ADVANTAGES of plastic

Nilkamal www.nilkamal.com

it is not necessary to wait for cranes, trucks or other

machinery.

Cost: - Long lifetime (lower amortisation per pour)

- lower operating cost (no crane time, less labour)

- lower maintenance cost (less cleaning, no or little oiling,

simple storage).

GEOTUB WOOD STEEL

Forming time: 15 to 20 min. 4 h 25 min

Stripping time: 5 min. 30 min. 20 min.

Total time: 25 min. max 4h 30 min. 45 min.

why plastic?Port Laoise, Ireland M7 Motorway extension

120 km of new highway, 45 new bridges, middle of the countryside

GEOTUB job sites

Nilkamal www.nilkamal.com

dia 900 mm

why plastic?GEOTUB PANEL Square and rectangular

Nilkamal www.nilkamal.com

45° integrated chamfer

why plastic?

One man20 minutes total time

GEOTUB PANEL job sites

San Fior, Italyresidential project

Light and handy, the ease of useis extreme.

Nilkamal www.nilkamal.com

Excellent temperature tolerance: -30°C / +70°C

why plastic?GEOTUB job sites - India

Adani port - Mundra

Nilkamal www.nilkamal.com

IVRCL- Bangalore

AHURA - Pune B . G Shirke- Mumbai

why plastic?Technical characteristics:

Panel dimensions:

120 x 60 cm 11 kg weight

smaller compensation panels:

40 x 60 cm 3.68 kg

The characteristics of GEOPANEL

Nilkamal www.nilkamal.com

40 x 60 cm 3.68 kg

30 x 60 cm 2.90 kg

25 x 60 cm 2.30 kg

20 x 60 cm 2.25 kg

walls thickness of 10 to 45 cm - thicker walls are

possible under certain conditions (foundations).

GeoplastGEOPANEL job sites

Gangform with GEOPANEL

3 m high x 12 m long 50 pcs. total36 m2 surface

Total weight 650 kg

Nilkamal www.nilkamal.com

GeoplastGEOPANEL job sites

San José, CostaricaIndustrial building

Nilkamal www.nilkamal.com

GeoplastGEOPANEL job sites - India

MumbaiPratibha - Mumbai

Ahura - Pune

Nilkamal www.nilkamal.com

Mumbai

IVRCL - Mumbai

Pratibha - Mumbai

Ahura - Pune

GeoplastGEOSKY® is a system of plastic formworks for the realization of concrete slabs.

Thanks to the sliding wedge on main beam, this new and innovative system makes

The GEOSKY slab system

Nilkamal www.nilkamal.com

innovative system makes installation and stripping quick, reduces casting time and increases equipment turnaround.

No special panels are needed with GEOSKY® because it uses the same panels (Geopanel) needed to pour walls.

GeoplastThe AVANTAGES of Geosky

Wood and steel slab formwork are the traditional systems.

The are time-proven, but they have some shortcomings:

- main and secondary beams are necessary

- the forming and stripping time is high:

Nilkamal www.nilkamal.com

GEOSKY Wood Steel

0,35-0,40 � 0,9 0,8

h/man/m2 h/man/m2 h/man/m2

(traditional systems)

why plastic?Belgorod, RussiaApartement block.

Quick, easy and safe.No crane, no sweat.

GEOSKY job sites

Nilkamal www.nilkamal.com

Laing – O’RourkeLondon, UK Anemon

Moskow, Russia

DakspolSt. Petersburg,

Russia

Da Vinci MallRome, Italy

M50 HighwayDublin, Ireland

BuygesParis, France

FibrexAbu Dhabi

Cap Cana projectDominican Rep.

Waiwera highwayNew Zealand

Italy

SantiagoChile

NilkamalIndia

Geoplast

Nilkamal www.nilkamal.com

thank you for your attention!