NORTH KIAMA BYPASS. Geometric Constraints lead to an Innovative Precast Concrete Segmental Arch Tunnel. Presented by: Paul Quach. 1985. 1995. 2005. History. 1986 - Princes Highway not to be widened. 1990 - Extensive route study. 1991 - EIS. - PowerPoint PPT Presentation

Citation preview

1October 05

NORTH KIAMA BYPASS

Geometric Constraints lead to an Innovative Precast Concrete

Segmental Arch Tunnel

Presented by: Paul Quach

2October 05

1986 - Princes Highway not to be widened

1990 - Extensive route study

1991 - EIS

1996 - Updated EIS and Commission of Inquiry

1997 - Project approval by NSW Min. Urban Affairs and Planning

19851985 19951995 20052005

2001 - Funding Granted

History

3October 05

• $178M, 7.6km, 4 lane link from Dunmore to Kiama• Three Interchanges

– Bombo– Swamp Road– Shellharbour & Tabbitta Roads

• Off Ramp at Bombo rail Station• On-road Cycle ways• Bridges at Bombo Access

– Panama Street– Bombo Beach Access Road– Bombo Quarry Rail Siding (Tunnel)

North Kiama Bypass

4October 05

NORTH KIAMA BYPASS: BOMBO ACCESSNORTH KIAMA BYPASS: BOMBO ACCESS

Design ConstructionStaging

5October 05

Reference: www.expedia.com

KIAMA

Site Location

6October 05

Site Location

7October 05

North Kiama Bypass

8October 05

North Kiama Bypass

9October 05

NORTH KIAMA BYPASS: BOMBO ACCESSNORTH KIAMA BYPASS: BOMBO ACCESS

Staging

10October 05

Staging

11October 05

Staging

Stage 1 Construction

12October 05

Staging

Stage 1 Construction

13October 05

Staging

Stage 2 Construction

14October 05

NORTH KIAMA BYPASS: BOMBO ACCESSNORTH KIAMA BYPASS: BOMBO ACCESS

DesignStaging

15October 05

Design

16October 05

Design

17October 05

Design

18October 05

Design

B

A

19October 05

Design

A B

20October 05

Design

B

A

21October 05

Design

A B

22October 05

• 3D Analysis of End Structures• Development of mesh • Pre-cast arch panels• In-situ collar• Complete model• M1600 wheel load positions• Analysis results

– deflection, 100 x magnification– Plate bending moments

Design

23October 05

Design

24October 05

Design

25October 05

Design

26October 05

Design

27October 05

Design

28October 05

Design

29October 05

Design

30October 05

Design

31October 05

Design

32October 05

NORTH KIAMA BYPASS: BOMBO ACCESSNORTH KIAMA BYPASS: BOMBO ACCESS

Design ConstructionStaging

33October 05

Construction

34October 05

Construction

35October 05

Construction

36October 05

Construction

37October 05

Construction

38October 05

Construction

39October 05

Construction

40October 05

Construction

41October 05

Construction

42October 05

Construction

43October 05

Construction

44October 05

Completed Project

45October 05

Completed Project

46October 05

Thank you

PAUL QUACHBusiness Development Manager

The Reinforced Earth Company2/20 George StreetHornsby, NSW2077

Tel. +61 2 9910 9910Fax.+61 2 9910 9999

pquach@reco.com.auwww.reco.com.auwww.rta.nsw.gov.au

• Statistics– Permanent Walls

• 2400m²• 7m max height

– Temporary Walls• 1200m²• 8m max height

– Tunnel• 70m long• 13m Span• 6m High

47October 05

NORTH KIAMA BYPASSAcknowledgements

• Owner– Roads & Traffic

Authority NSW

• Head Contractor– John Holland Pty Ltd

• Primary Designer– Hughes Trueman– Brian Bourne

• Geotechnical– D. J. Douglas &

Partners

• Design and supply of walls and tunnel– The Reinforced

Earth Company– Sub-consultants and

suppliers• 3D Analysis of Tunnel

by Interactive Design Services

• Geotechnical by M.A.Adler & Associates

• Design Verification by Cardno MBK

Recommended