123-04-20
• These materials are prepared only for the students enrolled in
the course Distributed Software Development (DSD) at the
Department of Computer Science and Engineering,
University of Mälardalen, Västerås, Sweden and at the Faculty
of Electrical Engineering and Computing, University of Zagreb,
Croatia (year 2010/2011).
• For all other purposes, authors’ written permission is needed!
• The purpose of these materials is to help students in better
understanding of lectures in DSD and not their replacement!
NOTICE!
223-04-20
Distributed Software Development
323-04-20
Project Plan
Zhixiang Gao and Pavel Chen
423-04-20
Project Overview
• Software to assist in schematic map generation
• Standalone application
• Possible extension in future
Methodology
• Feature Driven Development (FDD)– Agile methodology– Introduced in 90’s– Consists of 5 activities– Driven from a “features” perspective
523-04-20
Methodology
623-04-20
- Add label- Add station- Allow import
Add label – Nov 7, 2010 - JUnit- SVN update- SVN commit
Why FDD?
• Requirements are uncertain
• Timeframe is short
• Need in continuous integration
• Need in robust software
• OOP with Java
723-04-20
FDD - Roles
823-04-20
Task\Role (Person)
Project and Development Manager (ZG)
Chief Architect
(AM)
Chief Programmers
(MV, PC)
Class Owners (DP, RN)
Domain Experts (MY, AP)
Overall model X X X
Feature list X X X
Plan by feature X X X
Design by feature X X X X
Build by feature X X X X
Communication
• Synchronous communication – Weekly all hands meeting (video/voice
meeting via Skype)– Face to face meeting on each side– IM chat
• Asynchronous communication– Google Group discussions– Email communication
923-04-20
Schedule
1023-04-20
Team Organization
Requirements Definition
Delivery on 10.1
Feature ListPlan Revision
ImplementationIntegrationAcceptance
Test PlanDelivery on
12.10
Test ReportDelivery on
1.8
Final Project Report
Delivery on 1.14
Documentation
Project Vision
Project PlanDelivery on 10.1
Design DescriptionDelivery on 10.5 Overall Model
Design
User Manual Installation GuideDelivery on 1.14
Alpha10.27 Beta
11.17 RC12.15
Final1.12
Schedule
Project Risks
Beyond the deadline
Miscommunication
Lack of human resources Version control problem
Lack of technical competence
Loss of team member
Members should help each other. Study and study!
Members follow up the schedule strictly.
Communicate when a problem happens. Document important
information.
Members follow the SVN policy.
Backup data periodically.
Plan well and everyone completes/submits
work on time. Assign the tasks
according to team member’s skills.
Every team member should be aware
of other members’ responsibility.
Project RisksPossibility Risk Preventive action
High Beyond the deadline Members follow up the schedule strictly.
High Miscommunication Communicate when a problem happens. Document important information.
Medium Lack of technical competence Members should help each other. Play one’s strength and improve weaknesses.
Medium Version control problem Members follow the SVN policy. Backup data periodically.
Low Lack of human resources Plan well and everyone completes/submits work on time. Assign the tasks according to team member’s skills.
Low Loss of team member Every team member should be aware of other members’ responsibility.
1323-04-20
Financial PlanActivity Volume (days) Cost
Project preparation 3€ 600
Requirement analysis 15€ 3000
Design specification 8€ 1600
Architecture and interface design 8€ 1600
Implementation 25€ 5000
System integration 5€ 1000
Test 20€ 4000
Information gathering 10€ 2000
Documentation 30€ 6000
Presentation preparation 5€ 1000
Meeting 10€ 2000
Study 10€ 2000
Team management 5€ 1000
Total man-day: 154 (€ 200/day) Total cost: € 30800
WE ARE
COSTLESS AND
PRICELESS
Thanks for the attention