View
0
Download
0
Category
Preview:
Citation preview
schoolinfrastructure.nsw.gov.au
NSW Department of Education – School Infrastructure
enhanced open spaces
new modern teaching spacesand facilities for up to 900 primary school students
26 new classrooms
covered outdoor learning areas (COLA)innovative learning
WelcomeDay 1 Term 1
Homebush West Public School students enjoying the rooftop play space
schoolinfrastructure.nsw.gov.au
NSW Department of Education – School Infrastructure
RBA COPYRIGHT
RBA COPYRIGHT
RBA COPY
RIGHT
RBA COPY
RIGHT
RBA COPYRIGHT
RBA COPY
RIGHT
RBA COPYRIGHT
RBA COPY
RIGHT
RBA COPYRIGHT
RBA COPY
RIGHT
RBA COPYRIGHT
RBA COPY
RIGHT
R B A C O P Y RI
G H T
R B A C O P Y
RI
G H T
R B A C O P Y RI
G H T
R B A C O P Y
RI
G H T
R B A C O P Y RI
G H T
R B A C O P Y
RI
G H T
R B A C O P Y RI
G H T
R B A C O P Y
RI
G H T
R B A C O P Y RI
G H T
R B A C O P Y
RI
G H T
RL
26.
515
(E) HALL, COLA,
CANTEEN(E) BLOCK ALIBRARY &
HOME BASES
(E) BLOCK MADMINISTRATION
(E) BLOCK NHOME BASES
4 STOREY DWELLING(MAX 11M HEIGHT)
4 STOREY DWELLING(MAX 11M HEIGHT)
E A S T B O U R N E R O A D
E X
E T
E R
R O
A D
T A
V I S
T O
C K
R O
A D
(N) COVERED WALKWAY
AMPHITHEATRE
GATE 4
LINE OF BUILDING BELOW
LINE OF BUILDING BELOW
LINE OF BUILDING BELOWLINE OF BUILDING BELOW
ROOF SHELTER 02
ROOF SHELTER 01
ROOF STRUCTURE A
N
NSW Nominated Architects: Robert Denton Reg. No. 5782, Alex Kibble Reg. No. 6015
Do not scale drawings. Verify all dimensions on site. Notify architect of all discrepancies
Project
Drawing Title
Proj. Dir Proj. Arch Drawn
Job No. Date Scale
Drawing No. Revision
PO Box 660 Darlinghurst NSW 1300 Australia 19 Foster Street, Surry Hills NSW 2010 Australia T +61 2 9281 4399F +61 2 9281 4337
Rev Date Description Checked Auth.
AK AH
FOR CONSTRUCTION
Tanner Kibble Denton Architects Pty Ltd
www.tkda.com.au
2 4 6 8 1010 20 30 40 50
CLIENT
T + 61 2 9561 1927F + 61 2 9561 8077
ContextLANDSCAPE CONSULTANT
T + 61 2 8244 8900
WoolacottsT + 61 2 9270 1000
Shelmerdines Consulting EngineersT + 61 2 9436 3021
AJ Whipps Consulting GroupHYDRAULIC CONSULTANT
T + 61 2 8923 8444
UrbisTOWN/FACILITIY PLANNER
T + 61 2 8233 9900
Wilkinson MurrayACOUSTIC CONSULTANT
T + 61 2 9437 4611
Design ConfidenceNCC/BCA & ACCESS CONSULTANT
T + 61 2 8399 3707
TraffixTRAFFIC CONSULTANT
T + 61 2 8324 8700
MBMplQUANTITY SURVEYOR
T + 61 2 9270 1000
MACEPROJECT MANAGER
T + 61 2 9126 8001
STRUCTURAL/ CIVIL CONSULTANT
MECHANICAL/ ELECTRICAL/ TRANSPORT ENGINEER
cA/C AIR CONDITIONER ACT ACOUSTIC CEILING TILESACP1 TIMBER ACOUSTIC CEILING AHD AUSTRALIAN HEIGHT DATUM AL ALUMINIUM AP ACCESS PANEL AW ALUMINIUM WINDOW BAL BALUSTRADE BCH BENCH BHD BULKHEAD BIT BITUMEN BK/C BRICKWORK- COMMON BL BLOCKWORK CONCRETE BO BOTTLE TRAP BOL BOLLARD BSN BASIN BSN/V BASIN- VANITY BWU BOILING WATER UNIT /C CURVED CA CARPET CA/D CARPET- DIRECT STICK CAR CARBORUNDUM CBD CUPBOARD CD CLOTHES DRYER /CF CLEAR FINISHED CFC COMPRESSED FIBRE CEMENT CHS CIRCULAR HOLLOW SECTION CJ CONSTRUCTION JOINT CO CLEAN OUT COL COLUMN COS CONFIRM ON SITE CP CONCRETE PAVER /CR CEMENT RENDER CRN CORNICE CS CISTERN CSC CISTERN- CONCEALED CT COOKTOP /CV COVED D DOOR DAR DRESSED ALL ROUND DH DOUBLE HUNG DP DOWNPIPE DPC DAMP PROOF COURSE DW DISHWASHER (E) EXISTING EA EQUAL ANGLEEDB ELECTRICAL DISTRIBUTION
BOARD EF EXHAUST FAN EJ EXPANSION JOINT EQ EQUAL F FIXED FC FIBRE CEMENT FCL FINISHED CEILING LEVEL FD FIRE DOOR FDR FLOOR DRAINFFL FINISHED FLOOR LEVEL FG FIXED GLASS FH FIRE HYDRANT FHR FIRE HOSE REEL FIP FIRE INDICATOR PANEL FR FIRE RATED FRL FIRE RESISTANCE LEVEL FS FINISHED SIZE FW FLOOR WASTE FWL FLOOR WASTE - LINEAR FZ FREEZER G GLASS G/OB GLASS/OBSCURE GAL GALVANISED GBR GRAB RAIL GD GLAZED DOOR GL GLAZED LOUVRES GPO GENERAL POWER OUTLET GRT GRATED DRAINHD HAND DRYER HF HEATER FLOWHTR HEATER HWU HOT WATER UNIT JH JOINERY HANDLE J JOINERY (ITEM) KP KICK PLATE L LAMINATE FINISH LDY LAUNDRY LN LINOLEUM M MIRROR MDF MEDIUM DENSITY
FIBREBOARD ML MELAMINE MLF METAL LOUVRE - FIXED MO MOTORISED MR MOISTURE RESISTANT MRP METAL ROOF PANEL MS MILD STEEL MSF METAL SCREEN- FIXED MW MICROWAVE MWS METAL WALL SHEETING (N) NEW
NIC NOT IN CONTRACT O/S OUTSIDE OA OVERALL OD OUTSIDE DIAMETER OF OVERFLOW OG SPANDRELOV OVEN P PAINT/ PAINTED PABX TELEPHONE EXCHANGE PAV/BK PAVERS /BRICK PAV/C PAVERS / CONCRETE PBD PLASTERBOARD PBD/FR PBD- FIRE RATED PBD/WR PBD- WATER RESISTANT PER PERFORATED PF PRE-FINISHED PFC PARALLEL FLANGE CHANNEL PLY PLYWOOD PMC PREFINISHED METAL
CLADDING PTB PARTICLEBOARD PTH PAPER TOWEL HOLDER PTY PROPRIETARY PU POLYURETHANE RB ROBE RC REINFORCED CONCRETE RC/ NS RC- NON-SLIP RC/ WF RC- WOOD FLOAT FINISH RC/BR RC- BROOM FINISH RC/OF RC- OFF FORM RC/SC RC- SCREED RC/STR RC- STEEL TROWEL FINISH RD ROOF DRAINREF REFRIDGERATOR RH ROBE HOOK RHD RANGEHOOD RHS RECTANGULAR HOLLOW
SECTION RL REDUCED LEVEL RS ROLLER SHUTTER RWH RAIN WATER HEAD RWO RAIN WATER OUTLET RWS RAIN WATER SUMP SB SPLASHBACK SC STEEL COLUMNSCR SHOWER SCREEN SH SHELF SHR SHOWER SHS SQUARE HOLLOW SECTION SIM SIMILAR SJ SILICONE JOINT SK SKIRTING SKL SKYLIGHT SNK SINK SP SPITTER SPL SET PLASTER SS STAINLESS STEEL SSL STRUCTURAL SLAB LEVEL SWP STORMWATER PIT T TIMBER T&G TIMBER TONGUE & GROOVE T/V TIMBER- VENEER TB TIMBER BATTENS TBC TO BE CONFIRMED TD TIMBER DOOR TDK TIMBER DECKING TL TILE FINISH TL/F TILE- FLOOR TL/W TILE- WALL TME TO MATCH EXISTING TOP TOPPING TOW TOP OF WALL TP TAP TPH TOILET ROLL HOLDER TR TOWEL RAIL TUB LAUNDRY TUB TUN TUNDISH TW TIMBER WINDOW TYP TYPICAL TZ TERRAZZO U/S UNDERSIDE UB UNIVERSAL BEAM UC UNIVERSAL COLUMN UNO UNLESS NOTIFIED OTHERWISE UR URINAL V VINYL V/S VINYL- SHEETING V/T VINYL- TILES VOS VERIFY ON SITE VP VENT PIPE W WINDOW WC WATER CLOSET (TOILET
SUITE ) WD WASTE DISPOSAL WP WEATHERPROOF WPM WATERPROOF MEMBRANE WR WATER RESISTANT WV WALL VENT XMS EXPANDED METAL MESH
1 : 200 @ B1
C
Homebush West Public School
PROPOSED SITE PLAN
150871
1101
SJN
05/26/16
AR-CD-
Department of Education
C 27/09/18 KERB CROSSING PD AKB 04.10.17 PROGRESS ISSUE AC AKA 12.09.17 ISSUE FOR CONSTRUCTION AC AK
Day 1 Term 1, 2019
Welcome to Homebush West Public School. Today is an exciting day for our school and we hope you enjoy your first day and the year ahead.
What to expectOur new learning spaces and facilities will be ready and open for students for Day 1, Term 1, 2019.
Teachers will be ready to meet their students to guide them to their classrooms.
Students will have access to additional open spaces including two sports courts and an innovative rooftop play and educational space.
TransportThe 408 bus which travels from Burwood to Rookwood Cemetery via Flemington stops at Henley Rd (395m away, 6 minute walk).
The nearest train station is Flemington Station (T2 line: 643m away, 10 minute walk).
Use the NSW Transport trip planner can help plan your trip: https://transportnsw.info
Contact us
For more information about this project contact School Infrastructure NSW:
Website: schoolinfrastructure.nsw.gov.au
Email: schoolinfrastructure@det.nsw.edu.au
Phone: 1300 482 651
For information about school activities and operations, contact the school directly:
Principal: Estelle Southall
Website: homebushw-p.schools.nsw.gov.au
Email: homebushw-p.school@det.nsw.edu.au
Phone: 02 9746 9304
Map of Homebush West Public School
Recommended