NUMI Horn-1 Module Modification

Vladimir Sidorov21 August 2020

8/20/2020V. Sidorov /NUMI Horn-1 module modification2

NUMI Horn-1 Module drive mechanisms

Upper drivemechanism

Main shaft

Transverseshaft

Lower drivemechanismModule

8/20/2020V. Sidorov /NUMI Horn-1 module modification3

Upper drive mechanism condition

Transverseshaft

Main shaft

Link

Lifter drive shaft

8/20/2020V. Sidorov /NUMI Horn-1 module modification4

Upper drive mechanism

Motor

Slidingblock

Mainshaft

Gear box

Verticalshaft

Transverseshaft

Link

Baseplate

8/20/2020V. Sidorov /NUMI Horn-1 module modification5

Lower drive mechanismBase plate

Slidingblock

Guiderod

Linearbearing

Link GraphalloybushingAlignment

pin

8/20/2020V. Sidorov /NUMI Horn-1 module modification6

Lower and Upper drives exchange scenario

Horn-1 exchange procedure is followed

Target Chase

Target

Horn-1Chase

T-block

Horn with module

WorkCell

Move T-blocks from chase to T-blocks storage and Horn-1 module to Work Cell

Horn-1

8/20/2020V. Sidorov /NUMI Horn-1 module modification7

8/20/2020V. Sidorov /NUMI Horn-1 module modification8

Horn-1 is disconnected from module

8/20/2020V. Sidorov /NUMI Horn-1 module modification9

Horn-1 is moved to the morgue

Horn-1

Detail steps of the drive mechanisms exchange procedure will be presented by Keith Anderson after my presentation

8/20/2020V. Sidorov /NUMI Horn-1 module modification10

Horn - module assembly in MI-8Horn1 module drive mechanisms pre-assembly and Remote Handling Training

Module mock-up

8/20/2020V. Sidorov /NUMI Horn-1 module modification11

Frame

Support block

Top plate

Bottom plate

8/20/2020V. Sidorov /NUMI Horn-1 module modification12

Lower drive mechanism

Upper drivemechanism

Transverseshaft

MainshaftModule

mock-upframe

Module mock-up frame –drive mechanisms assembly

8/20/2020V. Sidorov /NUMI Horn-1 module modification13

Horn-1 shafts installation

8/20/2020V. Sidorov /NUMI Horn-1 module modification14

The Horn-module assembly stand is installed in MI-8 for the lower drive mechanism removing and installation practice. The practice was done on Monday August 17.

Lower drive mechanismHorn-1 module Assembly stand

Module mock-up frame

8/20/2020V. Sidorov /NUMI Horn-1 module modification15

Module

Lower transfer drive Cask

Cask support aluminum frame

Upper drive mechanisms storage box

8/20/2020V. Sidorov /NUMI Horn-1 module modification16

Transverse drives shafts storage

Cask

Supportframe

Shafts

Cover

8/20/2020V. Sidorov /NUMI Horn-1 module modification17

8/20/2020V. Sidorov /NUMI Horn-1 module modification18

Lower drive mechanism cask

Lower Cask

Top cover

Lower Drive Mechanisms Casks

Main cask

Small cask

Lower drivemechanism

8/20/2020V. Sidorov /NUMI Horn-1 module modification19

• Summary:• 1. All replacement parts are made from the stainless steel or anodized aluminum.• 2. More powerful motors and gear boxes is installed.• 3. Linear ball bearings are replaced with aluminum anodized bushings.• 4. The module mock-up was fabricated and used for transverse drives pre-

assembly and testing.• 6. Lower drive mechanism cask support frame was fabricated s used for practice.• 7. Drive mechanisms parts storage casks are under fabrication.• 6. The module assembly stand is installed in MI-8 and used for transverse drives

removing and installation practice.• 7. Special tools are fabricated for remote handling operations.

8/20/2020V. Sidorov /NUMI Horn-1 module modification20

Recommended