PROJECT TITLE: Additional Works for the storage facility of MICP Bonds Division

LOCATION: 2nd floor, Old NPO Building

BID PROPOSAL

BREAKDOWN OF EXPENDITURE--I-te-m--"--U-m-·t--I Description I Unit Cost Amount

L MASONRY WORKS

230 pes

90 bags25 bags12 cu.m16 cu.m

140 pes150 bags

II. ELECTRICAL WORKS

6 rolls6 rolls8 pes8 pes4 rolls5 pes6 pes

ill. PAINTING WORKS

20 galsl2 tins8 tins6 gals

20 gals12 gals12 tins12 tins

Granite Tile .60 x .60Tile AdhesiveABC groutWash SandGravel 3/4Tiles Trim 5/8 x 10Portland Cement

Material Cost

Labor CostIndirect cost

Total Cost

TW Wire #12

TW Wire #14Duflex Convenience Outlet

3 - Gang SwitchFlexible pipe 112Electric Tape

Louver 2 x ~oWattsMaterial Cost

Labor CostIndirect cost

Total Cost

Sanding SellerFlat wall enamelPaint ThinnerLacquer ThinnerMahogany BoysenLacquer FlowFlat LatexGloss Latex

Material Cost

Labor CostIndirect cost

Total Cost

IV. CARPENTRY WORKS

1801709085

12080287

210 sets6 gal

230 pes130 pes130 pes

6

V.HARDWARE

220 pes1 pe

350 pes50 tubes

2 x 3 x 12 Kiln Dry Wood2 x 2 x 12 Kiln Dry Wood

2 x 3 x 8 Kiln Dry Wood1/2 x 2 x 8 Kiln Dry WoodPlywood 1/4 x 4 x 8

Plywood 3/4 x 4 x 8Common Nail # 3Common Nail # 2Finishing Nail # 1Finishing Nail # 2Swing HingesStiekwellCabinet HandleWood Cornice 4 x 12Baseboard 4 x 12Concrete Nail #3

Concealed HingesSteel DoorTeckscrewSealant

GRAND TOTAL

Material CostLabor Cost

Indirect costTotal Cost

Material CostLabor Cost

Indirect costTotal Cost

Amount in words: ----------------------------------------------------------

Prepared and Submitted by:Signature over Printed Name

Recommended