Office of Management, Budget and EvaluationOffice of Engineering and Construction Management
Real Property Asset Management
Eduard A. Dailide, P.E.Deputy Director, Facilities and Infrastructure
Office of Engineering and Construction Management
February 19, 2004
Office of Management, Budget and EvaluationOffice of Engineering and Construction Management
2
DOE Real Property Portfolio
•Land 2.6 Million Acres (Yucca may add 0.75-0.5M)•Buildings
– Owned 127.0 million Gross Sq Feet
– Leased 24.0 million Gross Sq Feet
– Laboratories 30.5 million Gross Sq Feet
– Production 44.6 million Gross Sq Feet
– Office 17.47million Gross Sq Feet
•Total Replacement Value of Improvements $73.1 Billion(Not including land)
•Annual Facilities and Infrastructure budget over $3 billion
Office of Management, Budget and EvaluationOffice of Engineering and Construction Management
3
Perspectives
• Weakness in the acquisition and management of the Department’s real property assets have been highlighted by:
– Congress
– General Accounting Office
– National Academies of Sciences and Engineering
– DOE Inspector General
Office of Management, Budget and EvaluationOffice of Engineering and Construction Management
4
GAO Reports
• GAO-03-122, Jan 2003, places Federal Real Property as a High Risk Area due to:– Deteriorated and outdated property portfolio– Excess and underutilized inventory– Lack of quality facility data– No comprehensive and integrated planning
• GAO-03-100, January 2003, Major Management Challenges and Program Risks, Department of Energy– DOE faces major challenge in revitalizing
infrastructure
Office of Management, Budget and EvaluationOffice of Engineering and Construction Management
5
Facility Data
Deferred Maintenance
$0
$1,000
$2,000
$3,000
$4,000
1998 1999 2000 2001 2002 2003
$M Total Area
0
20
40
60
80
100
120
140
1986 1987 1988 1991 1993 2001 2002 2003Year
M GSF
Actual Maintenance
$0
$200
$400
$600
$800
$1,000
1999 2000 2001 2002 2003
$ M
FY 2003 was funded at 1.2% of RPV
Office of Management, Budget and EvaluationOffice of Engineering and Construction Management
6
Departmental Responses
Issued:• DOE Order 413.3, Program and Project Management for the
Acquisition of Capital Assets, October 13, 2000• DOE Manual 413.3-1, Project Management for the
Acquisition of Capital Assets, March 28, 2003• DOE Order 430.1B, Real Property Asset Management
(RPAM), September 24, 2003
Combined they:• Put the Department on the path to improve the acquisition
and management of its real property assets over the life-cycle.
Office of Management, Budget and EvaluationOffice of Engineering and Construction Management
7
Real Property Asset Management
Integrated plan within a geographic area that supports Departmental and Program guidance
Office of Management, Budget and EvaluationOffice of Engineering and Construction Management
8
DOE Project Management Process
Range of
Alternative
s Cost Range
CD-0Approve Mission Need
CD-1Approve Alternative Selection and Cost Range
CD-2Approve Performance Baseline
CD-3Approve Start of Construction
CD-4ApproveStart of Operations or Project Closeout
CriticalDecisions
Operating funds/Program funds
PED funds PED funds Project fundsOperating funds/Program funds
Initiation Phase Definition Phase
Transition/Closeout Phase
Execution Phase
Performance MeasurementEarned Value (for projects over $20M)
Office of Management, Budget and EvaluationOffice of Engineering and Construction Management
9
Ten Year Site Plans
• Ten Year Site Plan Features:– Integrates functional components of land use, facilities and
infrastructure acquisition, maintenance, recapitalization, safety & security, and disposal plans into comprehensive site-wide management plan.
– Links Facilities and Infrastructure resource requirements to Ten Year Site Plans to Mission.
– Requires assessment of past performance and projected future outcomes.
– Strengthens communication and accountability between programs / sites / and tenants.
– Requirements Driven.
Office of Management, Budget and EvaluationOffice of Engineering and Construction Management
10
Communication of Requirements
DOE Strategic Plan&
Planning Guidance
Program Guidance
Site Office
Tenant Requirements
TYSPTYSP
Office of Management, Budget and EvaluationOffice of Engineering and Construction Management
11
Integrated Facilities & Infrastructure Cross-cut
FY- 04 Ten Year Site Plan (May ’03 submission)
Direct and Indirect Maintenance
General Plant Projects
Excess Elimination
General Plant Equipment
F&I (replacement, re-cap, major renovationand major repair) Line Item Projects
New Mission Line Item Capital Projects [as governed by DOE 413.3]
Operational / Expense Projects
PY CY BY
PY = Prior YearCY = Current YearBY = Budget Year
The IFI Cross-cut budget reflects the resources associated with the items identified
Disposition Baseline
03 04 05 06 07 08 09 10 11 12 13
Resource Requirements
Office of Management, Budget and EvaluationOffice of Engineering and Construction Management
12
Performance Measurement
• RPAM establishes three corporate outcome measures for real property asset management:– Asset Condition Index (ACI)– Asset Utilization Index (AUI)– Quarterly Maintenance Budget Execution versus Plan
• Norm for annual maintenance is 2-4% of Replacement Plant Value per the National Academies of Sciences and Engineering and industry standards.
• Project Management Order and Manual establish the Earned Value Management System as the performance measure for acquisitions.
• Programs and site managers should develop additional metrics to measure attainment of program goals.
• Ten Year Site Plans should establish requirements and expected outcomes for performance measurement.
Office of Management, Budget and EvaluationOffice of Engineering and Construction Management
13
Organization
Project Assessment SummaryNumber
of Projects
Past CD-2
Green Yellow Red
% of Projects
with Green Status
% of $$ Value with
Green Status
NNSA 34 30 0 4 88% 98%
EM 35 29 3 3 83% 83%
SC 22 22 0 0 100% 100%
NE 2 2 0 0 100% 100%
EE 1 1 0 0 100% 100%
Total DOE 94 84 3 7 89% 87%
Summary Statistics
The DOE target for FY04 is that 90% of projects have “Green” status both by number and dollar value.
Office of Management, Budget and EvaluationOffice of Engineering and Construction Management
14
Asset Utilization
Index
Asset Condition
Index
IFI Crosscut Maintenance Budget Execution
($M)
1st Qtr 2nd QTR 3rd QTR 4th QTR
Plan Act Plan Act Plan Act Plan Act
Program A 0.89 0.92 70.5 71.3
Program B 0.77 0.74 43.5 44.6
Program C 0.90 0.89 16.3 16.3
Program D 0.91 0.92 9.5 9.6
Program E 0.95 0.93 9.2 7.5
Total DOE 149.0 149.3
F&I Summary Statistics
SAMPLESAMPLE
Office of Management, Budget and EvaluationOffice of Engineering and Construction Management
15
Facility Information Systems
Facility Information Management System (FIMS)• Department’s official real property asset database.
• Repository for real property inventory / condition assessment / maintenance data / LTS requirements.
• Feeder into Department’s financial reporting systems.
• Data source for TYSPs, management analysis, assessments, and outcome measures.
Office of Management, Budget and EvaluationOffice of Engineering and Construction Management
16
Executive Order 13327Federal Real Property Asset Management
• Directs executive branch departments and agencies to:– Recognize importance of real property resources through
increases management attention.
– Establish clear goals and objectives.
– Improve levels of accountability.
• Establishes Federal Real Property Council at OMB.
• Requires agencies to develop and submit asset management plans.
• New Program intiative “ Federal Real Property Asset Management” added to President’s Management Agenda
Office of Management, Budget and EvaluationOffice of Engineering and Construction Management
17
Executive Order 13327Federal Real Property Asset Management
Executive Order Policy – to promote the efficient and economic use of America’s real property assets to assure management accountability for implementing Federal real property management reforms.
DOE Order 430.1B Objective – to establish a corporate, holistic and performance-based approach to real property asset management that links real property asset planning, programming, budgeting, and evaluation to program mission projections and performance outcomes. Order identifies requirements and establishes reporting mechanisms and responsibilities for real property asset management
Office of Management, Budget and EvaluationOffice of Engineering and Construction Management
18
Executive Order 13327Federal Real Property Asset Management
• Develop & implement agency asset management plan.
• Identify all agency real property
• Prioritize actions to manage real property inventory
• RPAM establishes corporate asset management plan linking assets to mission to outcomes. (1.)
• Facilities Information Management System (FIMS) is the corporate database for real property asset info. (4.b.(8).(a))
• Ten Year Site Plans (TYSP) must address how real property assets support DOE’s strategic plan and missions. (4.a.(3))
Executive Order RPAM
Office of Management, Budget and EvaluationOffice of Engineering and Construction Management
19
Executive Order 13327Federal Real Property Asset
Management
• Life-cycle cost estimations
• Identify asset management performance measures
• Manage assets consistent with agency’s strategic and asset management plan
• Provide real property asset inventory
• Managers shall assess application of Value Engineering to achieve essential functions at lowest life-cycle costs. (4.f)
• Asset Utilization Index and Asset Condition Index are the corporate measures for real property asset management. (4.g)
• Ten Year Site Plans (TYSP) must address how real property assets support DOE’s strategic plan and missions. (4.a.(3))
• FIMS is the corporate database for real property asset info. (4.b.(8).(a))
Executive Order RPAM
Office of Management, Budget and EvaluationOffice of Engineering and Construction Management
20
Challenges
• Successful implementation dependent upon:– Clear definition and communication of requirements
and expectations.
– Effective communication at all levels.
– Integration of multi-program requirements.
– Valid data.
– Qualified facility management staff. • Federal government employees.
• Contractor facilities managers.
Office of Management, Budget and EvaluationOffice of Engineering and Construction Management
21
Backup Slides
Office of Management, Budget and EvaluationOffice of Engineering and Construction Management
22
Site Manager• Geographic Area Coordination• Host for tenant Programs / Activities• Infrastructure Support Provider•TYSP Coordinator
LPSO CSO/PSO
Field ProgramOffice
Site
Mission / P
rogram /
Requirem
ents / Resources
TYS
P ( P
rogram / Infrastructure)
Req
uire
men
ts /
Res
ourc
es
TYSP (
Progr
am /
Suppo
rt)
Mis
sion
/ Pro
gram
HQ Coordination
OMBEOECM
Departmental• Policy / Oversight• PPB &E• Metrics
Infrastructure
Roles & Responsibilities
Recommended