Operational Tools M1 Update. James Casey SA1 Management Meeting CERN. Summary of milestone timeline. We are here…. M1 Features - April 2009. DONE. DONE. DONE. IN PROGRESS. DONE. DONE. Regional Dashboard ‘Regionalized’ dashboards at IN2P3 using current SAM tests for alarms GOCDB - PowerPoint PPT Presentation
Citation preview
EGEE-III INFSO-RI-222667
Enabling Grids for E-sciencE
www.eu-egee.org
EGEE and gLite are registered trademarks
Operational Tools M1 Update
James CaseySA1 Management MeetingCERN
Enabling Grids for E-sciencE
EGEE-III INFSO-RI-222667
Summary of milestone timeline
2
We are here…
Enabling Grids for E-sciencE
EGEE-III INFSO-RI-222667
M1 Features - April 2009• Regional Dashboard
– ‘Regionalized’ dashboards at IN2P3 using current SAM tests for alarms
• GOCDB– Programmatic Interface (XML over HTTP) available – GOCDB 4 schema deployed with current data inserted for
validation• Configuration repositories
– Aggregate Topology Provider (ATP) What resources should I test ?
– Metric Description Database What tests should I use ?
• Gstat– First prototype of new monitoring (based on Nagios) done
3
DONE
DONE
DONE
DONE
DONE
IN PROGRESS
Enabling Grids for E-sciencE
EGEE-III INFSO-RI-222667
M1 Features – April 09• ROC level nagios based monitoring available
– Configured from Metric Description Database and ATP– ‘SAM Portal’ level of visualization complete
• Full Nagios testing of all resources in grid running– At CERN – Central system, simulating 11 ROCs– Used to validate equivalence to SAM– Availability calculation using current algorithm but with new
metrics• QR Reporting Portal (MSA1.3)
– Initial version with metrics for job usage implemented• Accounting
– Central infrastructure for ActiveMQ based accounting deployed– Consumer and Producer developed
4
DONEPENDING
IN PROGRESS
DONE
DONE
DONEDONE
DONE
IN PROGRESS
Enabling Grids for E-sciencE
EGEE-III INFSO-RI-222667
M1 Objectives summary• Mostly completed
– Issues understood and where appropriate new timelines in place• Nagios probe equivalence took longer than expected
and delayed some other components– ‘SAM Portal’, SLA Calculation
• Reduced effort at CERN due to re-hiring interviews and hardware provisioning delays slowed delivery of some components– ATP, Metric Store
• All details in ‘Operations Automation Team Milestone 1 Summary’
– https://espace.cern.ch/sa1-share/oat/Shared%20Documents/Milestones%20and%20Deliverables/EGEE-III-SA1-TEC-OAT-M1-Summary-v1_1.pdf
5
Enabling Grids for E-sciencE
EGEE-III INFSO-RI-222667
ROC Results in Site Nagios
6
Enabling Grids for E-sciencE
EGEE-III INFSO-RI-222667
Gridview summarisation of Nagios results
7
Enabling Grids for E-sciencE
EGEE-III INFSO-RI-222667
MyEGEE Portal
8
Enabling Grids for E-sciencE
EGEE-III INFSO-RI-222667
MyEGEE Portal
9
Enabling Grids for E-sciencE
EGEE-III INFSO-RI-222667
GStat
10
Enabling Grids for E-sciencE
EGEE-III INFSO-RI-222667
Support for Messaging• FUSE Message Broker is the same as Apache ActiveMQ. All
ActiveMQ developers are employed by Progress, Inc. – FUSE is an open-source rebundling of ActiveMQ. It’s the same code inside. There
is no cost to ‘just use FUSE’. – Currently bus are being fixed sooner on the FUSE release than the Apache release.
• Issue we are trying to solve: Little expertise in SA1 and no resources for support
• FUSE (http://fusesource.com/) offers support to the activeMQ distribution we are using
• CERN is interested in getting a support contract for a set of core brokers(4-5?), paying for all of them till the end of EGEE III. This will solve the present problem of support and will increase expertise in the team– If somebody else wants to set up a broker later on with the Apache version
software, there’s no problem – ActiveMq and FUSE versions interoperate• The involved teams consulted through the OAT are happy with
this
11
Enabling Grids for E-sciencE
EGEE-III INFSO-RI-222667
Resources
https://twiki.cern.ch/twiki/bin/view/EGEE/OAT_EGEE_III
• Architecture and componentshttps://twiki.cern.ch/twiki/bin/view/EGEE/MultiLevelMonitoringOverview
• Milestone trackinghttps://twiki.cern.ch/twiki/bin/view/EGEE/MultiLevelMonitoringMilestones
12
Recommended