View
1
Download
0
Category
Preview:
Citation preview
866.463.2611 • www.ecosystemsdisplays.com
Set
ups
Order #XXXXX - ECO-2067 Sustainable Exhibit - 10’x20’ Configuration
Plan View
10’
20’
866.463.2611 • www.ecosystemsdisplays.com
Gen
eral
Info
7A
General Setup Instructions •The setup instructions are created specifically for your configuration.
•Setup instructions are laid out sequentially in levels, including exploded
views and a logical series of steps for assembly. We encourage you to study
the instructions before attempting to assemble your exhibit.
Hex Tool for Assembling Exhibit Extrusion Lock Connectors
Numbering Instructions for Setups/Packing Inline Connection between Extrusions Baseplate Connection for Vertical Extrusions
Cleaning and Packing •Use non-abrasive cleaners when cleaning extrusions or ECO Glass inserts.
•Use mild cleaners and soft materials such as cotton to clean all laminates.
•Keep exhibit components away form extreme heat and long exposure to
sun light. This will prevent warping and fading.
•Retain all packing material for ease of re-packing. This protects the exhibit
components and keeps each part organized.
Disassembling •When disassembling exhibit, tighten all setscrews to prevent loss of hardware
in the shipping process.
866.463.2611 • www.ecosystemsdisplays.com
Gen
eral
Info
1 2 4 5
SEG Graphic Install1
2
3
4
Graphic is installed corners first. This allows a proportional fit around the
perimeter of the extrusion.
Locate channels along the edge of the extrusions.
Fold over graphic (hiding threads) and tuck silicon edge and fabric
into corners.
After corners are complete, slide in the rest of the graphic into channel.
(From edges to center)
3
5 Graphic is installed. Stand back and be amazed!
Place ECO panel together with a vertical offset, slide down to lock
connector in place.
Panel Corner Connectors are installed just like ECO panels. Remove by
off-setting top lock clips horizontally followed by separating vertically.2
1
ECO Panel Install 1 2
866.463.2611 • www.ecosystemsdisplays.com
Ste
p 1
Velc
ro: B
ack
Edg
e
Velc
ro: B
ack
Edg
e
Velc
ro: B
ack
Edg
e
Velc
ro: B
ack
Edg
e
Velc
ro: B
ack
Edg
e
Velc
ro: B
ack
Edg
e
Steps:1) Install Baseplates [1] to bottom of verticals [2,7] using bolts.2) Connect horizontals between verticals, as shown.3) Apply fabric graphics to back of assembly, using Velcro.
Item1234567
9/9A10/10A11/11A12/12A19/19A
Qty.2111111
1/11/11/11/11/1
DescriptionBaseplate85.75”h S44 Vertical Extrusion86”h S44 Vertical Extrusion w/ MOD-300 Aero connector86”h S44 Vertical Extrusion86”h S44 Vertical Extrusion86”h S44 Vertical Extrusion w/ MOD-300 Aero connector85.75”h S44 Vertical Extrusion22”w S44 Horizontal Extrusion22”w S44 Horizontal Extrusion22”w S44 Horizontal Extrusion69.622”w S44 Horizontal Extrusion69.622”w S44 Horizontal Extrusion
1
2 3
199 10 11
12
19A9A 10A 11A
12A
6 754
1
When assembled
Attach graphicsto velcro on back ofassembled frame
Velcro: Back Top Edge
Velcro: Back Bottom Edge
Velcro: Back Bottom Edge
Velcro: BackBottom Edge Velcro: Back
Bottom Edge Velcro: BackBottom Edge
Velcro: Back Top Edge
Velcro: BackTop Edge Velcro: Back
Top EdgeVelcro: Back
Top Edge
866.463.2611 • www.ecosystemsdisplays.com
Ste
p 2
Item131415
16/16A17/17A18/18A
Qty.1111
1/11/1
Description24”h S44 Vertical Extrusion w/ Door Stop24”h S44 Vertical Extrusion w/ Door Hinge22”w Z45 Horizontal Extrusion12”w Z45 Horizontal Extrusion12”w Z45 Horizontal Extrusion22”w Z45 Horizontal Extrusion
131415
16/16A17/17A18/18A
1111
1/11/1
24”h S44 Vertical Extrusion w/ Door Hinge24”h S44 Vertical Extrusion w/ Door Stop22”w Z45 Horizontal Extrusion12”w Z45 Horizontal Extrusion12”w Z45 Horizontal Extrusion22”w Z45 Horizontal Extrusion
Steps:1) Connect horizontal [15] between backwall verticals [3,4].2) Attach horizontals [16,16A] between vertical [13] & backwall vertical [3], sliding infill between verticals.3) Connect horizontals [17,17A] between vertical [14] & backwall vertical [4], sliding infill between verticals.4) Attach horizontals [18,18A] between verticals [13,14].5) Connect horizontal [15] between backwall verticals [5,6].6) Attach horizontals [16,16A] between vertical [13] & backwall vertical [5], sliding infill between verticals.7) Connect horizontals [17,17A] between vertical [14] & backwall vertical [6], sliding infill between verticals.8) Attach horizontals [18,18A] between verticals [13,14].9) Install Door to verticals [14] & [13]. See Door Attachment detail. 10) Attach Shelf Supports to inside of assemblies, using Velcro; place Internal Shelf in each cabinet.11) Place Counter Tops on top of assemblies.12) Attach A5 Shelf Pins to verticals, place Bridge Shelf.
DoorHinge
Hinge
Slide pin intohinge attachedto vertical. Slide doorhinge over pin.
Door Attachment*
Pin
15
13
14
16A
17A18A
18
16
17
Door
**
infill
infill
15
34
5
6
13
14
16A
17A18A
18
16
17
Door
**
infill
infill
When assembled
Shelf Pin
Slide shelf pininto groove ofextrusion &tighten setscrew tosecure.
setscrew
*
** *
*
Counter Top
ShelfCounter Top
Shelf
BridgeShelf
866.463.2611 • www.ecosystemsdisplays.com
Ste
p 3
Connections are made by holding the button down and sliding the red tube into opposingtube until the connection is made. To disassemblepush button and pull or twist extrusions apart.
Push-Button
Push-Button
6 6
66
Numbered Label
Using Your Setup InstructionsThe Aero Overhead Sign Setup Instructions are created specifically for your configuration. They include an exploded view of the frame which is sequentially numbered. We encourage you to study the instructions before attempting to assemble your exhibit.
Connections are kept very simple: no tools. Everything assembles with push-buttonconnectors and pre-connected horizontal sections.
Cleaning and Packing Your Display1) Use care when cleaning aluminum extrusion or acrylic inserts. Use only non-abrasive cleaners.2) Retain all packing material. It will make re-packing much easier and will reduce the likelihood of shipping damage.
A CDB
Steps:1) Assemble Aero frame in alphabetical order as shown.2) Install Canopy Mounts to top of backwall verticals.3) Connect assembled Aero frame to top of Canopy Mounts. See Canopy Installation detail.
CanopyInstallation*
Slide assembledaero canopy supportsover installedmount barrels.
CanopyMount
Aer
o Fr
ame
Sup
port
Arm
When assembled
* *
866.463.2611 • www.ecosystemsdisplays.com
Ste
p 4
When assembled
Steps:1) Install Monitor Mount to front of verticals [4,5]. See Monitor Mount Attachment detail.2) Attach Graphic Panels to verticals [2,7] using screw caps. See Graphic Attachment detail.3) Connect Shelves to verticals [2,7]. See Shelf Attachment detail.4) Attach Wings to left & right sides of backwall using A10 clips. See Wing Attachment detail.5) Connect Header Graphic above monitor mount, using H8 clips & Velcro.6) Attach Lights to top horizontal. See Light Attachment detail.
Monitor Mount Attachment
Insert connectorinto groove ofextrusion. Tighten setscrewto secure in place.
Attach wall plate to connectorsusing bolts provided.
Setscrew
Setscrew
*
Graphic
ScrewCap
V20
Graphic Attachment
Slide V20 connector into grooveof extrusion, then secure graphic
to connector using screw cap.
*
Shelf Attachment
Insert lock into groove of verticalextrusion and tighten setscrew.
LockSetscrew
Back of ShelfSetscrew will face outward for ease of assembly
*
2) Tighten set screw to secure A10 to extrusion.
1) Slide A10 connector into groove of extrusion.
Wing Attachment*
Wing
4) Tighten knob to secure wing in place.
3) Insert Infill into Clamp
1
2
3
4
*
Lock Clip into Groove of Horizontal Extrusion,then slide Light onto Clip.
Clip
Light Extrusion
Light Attachment
Clip
Light
*
**
*
**
*
**
**
**
***
**
*
Shelf
MonitorMount
Light
Shelf
Shelf
* *
* **wing
wing
wing
Header Graphic
wing
Graphic
Graphic
Graphic
LightLight
Light
*Shelf
Shelf
Shelf
Graphic
Graphic
Graphic
*
*
*
**
*
*
*H8 Clip
Velc
ro
* * *
Recommended