View
20
Download
0
Category
Preview:
Citation preview
1
PENCAPAIAN PIAGAM PELANGGAN PEJABAT DAERAH DAN TANAH MELAKA TENGAH
TAHUN 2020 (OKTOBER)
LAPORAN PENCAPAIAN PIAGAM PELANGGAN
PEJABAT DAERAH DAN TANAH MELAKA TENGAH
TAHUN 2020 (OKTOBER)
BIL BAHAGIAN/UNIT PENCAPAIAN
1 KHIDMAT PENGURUSAN 100%
2 PEMBANGUNAN DAERAH 71%
3
PEMBANGUNAN TANAH 82%
3.1 PELUPUSAN 63%
3.2 PEMBANGUNAN 69%
3.3 PENDAFTARAN 99%
3.4 HASIL 96%
3.5 PENGUATKUASAAN DAN TEKNIKAL 81%
JUMLAH PENCAPAIAN PIAGAM PELANGGAN KESELURUHAN PDTMT
PADA TAHUN 2020 (OKTOBER) IALAH – 84 %2
Peratusan Pencapaian Piagam Pelanggan Jabatan3
96% 98%86% 84%
60%
80%
100%
2017 2018 2019 2020
4
BIL BAHAGIAN/UNIT JAN FEB MAC APR MEI JUN JUL OGOS SEPT OKT NOV DIS
1KHIDMAT PENGURUSAN
100% 100% 100%
PK
P
100% 100% 100% 100% 100% 100% - -
2PEMBANGUNAN DAERAH
69% 95% 100% 100% 100% 100% 86% 67% 71% - -
3
PEMBANGUNAN TANAH
93% 95% 99% 97% 96% 81% 81% 77% 82% - -
3.1 PELUPUSAN 100% 100% 100% 100% 100% 58% 58% 44% 63% - -
3.2 PEMBANGUNAN 97% 97% 100% 100% 100% 66% 66% 50% 69% - -
3.3 PENDAFTARAN 99% 99% 99% 99% 99% 99% 99% 99% 99% - -
3.4 HASIL 89% 93% 100% 100% 100% 100% 100% 100% 96% - -
3.5 TEKNIKAL & PENGUATKUASAAN
80% 86% 90% 88% 82% 84% 86% 92% 81% - -
KESELURUHAN 87% 97% 99% 99% 97% 94% 89% 81% 84% - -
5
BIL BAHAGIAN/UNIT JAN FEB MAC APR MEI JUN JUL OGOS SEPT OKT NOV DIS
1KHIDMAT PENGURUSAN
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
2PEMBANGUNAN DAERAH
100% 100% 100% 100% 100% 100% 76% 76% 100% 100% 100% 100%
3
PEMBANGUNAN TANAH
98% 97% 96% 98% 91% 92% 89% 81% 89% 86% 89% 92%
3.1 PELUPUSAN 100% 100% 100% 100% 86% 91% 89% 65% 72% 75% 85% 86%
3.2 PEMBANGUNAN 100% 100% 100% 99% 96% 100% 99% 95% 99% 91% 97% 97%
3.3 PENDAFTARAN 99% 99% 99% 99% 99% 99.5% 99% 99% 99% 99% 99% 99%
3.4 HASIL 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
3.5 TEKNIKAL & PENGUATKUASAAN
91% 84% 81% 91% 73% 69% 60% 47% 76% 65% 68% 78%
KESELURUHAN 99% 99% 98% 99% 97% 97% 88% 88% 96% 95% 97% 97%
PENCAPAIAN PIAGAM PELANGGANBAHAGIAN KHIDMAT PENGURUSAN
BIL JANJI
MENEPATI TEMPOH
MASA/ STANDARD
PIAGAM PELANGGAN
TIDAK MENEPATI MASA/
STANDARD PIAGAM
PELANGGAN JUMLAH
PERKHIDMATAN /
BAUCER /ADUANJUMLAH
MENEPATI
MASA
% MENEPATI
MASA
JUMLAH
TIDAK
MENEPATI
STANDARD
***
% TIDAK
MENEPATI
STANDARD
***
1. Memastikan prestasi pengemaskinian
Profil Peribadi dan Profil Perkhidmatan
HRMIS mencapai sekurang-kurangnya
99% dalam tempoh tiga (3) bulan.
154 100% - - 154
2. Memastikan penyediaan baucer bayaran,
pesanan kerja dan bil-bil tuntutan dalam
tempoh empat belas (14) hari bekerja.637 100% - - 637
3. Memastikan segala urusan perkhidmatan
pengurusan majlis dan keraian
dilaksanakan dengan sebaik mungkin
dalam tempoh 2 minggu sebelum program
/ majlis dijalankan
9 100% - -3-Negeri
6-Daerah
4. Memastikan aduan yang diterima diambil
tindakan dalam tempoh lima belas (15)
hari bekerja.66 100% - -
50 - Aduan Awam
16 - e-Aduan
6
PENCAPAIAN PIAGAM PELANGGANBAHAGIAN KHIDMAT PENGURUSAN
BIL JANJI MENEPATI TEMPOH
MASA/ STANDARD
PIAGAM PELANGGAN
TIDAK MENEPATI MASA/
STANDARD PIAGAM
PELANGGAN
JUMLAH
PERKHIDMATAN
/ BAUCER
/ADUANJUMLAH
MENEPATI
MASA
%
MENEPATI
MASA
JUMLAH
TIDAK
MENEPATI
STANDARD
***
% TIDAK
MENEPATI
STANDARD
***
5. Memastikan aduan berkaitan ICT diberi
dalam tempoh dua puluh empat (24) jam
bekerja selepas diterima dan menyelesaikan
aduan dalam tempoh lima (5) hari bekerja
yang melibatkan perolehan alat ganti dan
perkhidmatan pembekal.
10 100% - - 10
6. Kemudahan pinjaman peralatan dan akses
ICT disediakan dalam tempoh tiga (3) hari
bekerja selepas permohonan lengkap
diterima, tertakluk kepada ketersediaan
peralatan / perisian tersebut
1 100% - - 1
JUMLAH 100%
7
BIL JANJI MENEPATI TEMPOH
MASA/ STANDARD
PIAGAM PELANGGAN
TIDAK MENEPATI MASA/
STANDARD PIAGAM
PELANGGAN
JUMLAH
PERUNTUKAN /
BANTUAN/PROJEK
JUMLAH
MENEPATI
MASA
%
MENEPATI
MASA
JUMLAH
TIDAK
MENEPATI
STANDARD
% TIDAK
MENEPATI
STANDARD
1.
Permohonan perbelanjaan
peruntukan YB ADUN yang
lengkap diterima diproses
dalam tempoh 14 hari bekerja
424 100% - - 424
2.
Pembayaran bantuan bencana
alam dalam tempoh 7 hari dari
tarikh bencana berlaku
i. Kurang daripada 10
permohonan (7 hari)
ii. Lebih daripada 10
permohonan (14 hari)
14
31
74%
12%
5
233
26%
88%
283
3
Projek Pembangunan
dilaksanakan mengikut tempoh
masa dan spesifikasi yang
ditetapkan
138(25 projek
PRE, 42
projek P19
dan 61 projek
Marris, 10
KPLB)
100% - - 138
JUMLAH 71% 29%
PENCAPAIAN PIAGAM PELANGGANBAHAGIAN PEMBANGUNAN DAERAH
8
PENCAPAIAN PIAGAM PELANGGANUNIT PELUPUSAN TANAH
BIL JANJI
MENEPATI TEMPOH MASA/
STANDARD PIAGAM
PELANGGAN
TIDAK MENEPATI MASA/
STANDARD PIAGAM
PELANGGAN JUMLAH
PERKHIDMATANJUMLAH
MENEPATI
MASA
%
MENEPATI
MASA
JUMLAH
TIDAK
MENEPATI
STANDARD ***
% TIDAK
MENEPATI
STANDARD ***
1Permohonan Tanah Kerajaan
(PTK)- 4 bulan 88 57% 67 43% 155
2Lesen Pendudukan Sementara
(Selesai ke PTG) -4 bulan 39 41% 57 59% 96
3Permohonan Rizab (Selesai ke PTG)
- 4 bulan 14 34% 27 66% 41
4Pengambilan Tanah 3(1)(a)
- 4 bulan 2 100% 0 0% 2
5Pengambilan Tanah 3(1)(b)/(c)
- 4 bulan 8 62% 5 38% 13
6Tanah Adat Melaka (MCL)
- 5 bulan 62 86% 10 14% 72
JUMLAH 63% 37%
9
PENCAPAIAN PIAGAM PELANGGANUNIT PEMBANGUNAN TANAH
BIL JANJI
MENEPATI TEMPOH MASA/
STANDARD PIAGAM PELANGGAN
TIDAK MENEPATI MASA/ STANDARD
PIAGAM PELANGGAN JUMLAH
PERKHIDMATANJUMLAH
MENEPATI MASA
% MENEPATI
MASA
JUMLAH TIDAK
MENEPATI
STANDARD ***
% TIDAK
MENEPATI
STANDARD ***
1Serah Beri milik Semula (SBMS) -
4 bulan 30 83% 6 17%
2Serah Sebahagian / Semua
Tanah - 4 bulan 18 95% 1 5%
3Kebenaran Pindahmilik /
Mencagar / Memajak -1 bulan 1242 69% 561 31%
4Tukar Syarat Lain Kategori
- 4 bulan 26 74% 9 26%
5Tukar Syarat Sama Kategori
- 3 bulan 10 45% 12 55%
6Pecah Sempadan Tukar Syarat
Serentak - 4 bulan 11 69% 5 31%
7Pecah Bahagian
- 4 bulan 28 69% 5 31%
8Penyatuan Tanah
- 4 bulan 5 50% 5 50%
JUMLAH 69% 31%
10
PENCAPAIAN PIAGAM PELANGGAN
UNIT PENDAFTARAN
11
BIL JANJI
MENEPATI TEMPOH MASA/ STANDARD PIAGAM PELANGGAN
TIDAK MENEPATI MASA/ STANDARD PIAGAM PELANGGAN
JUMLAH PERSERAHANJUMLAH
MENEPATI MASA% MENEPATI
MASAJUMLAH TIDAK
MENEPATI STANDARD
% TIDAKMENEPATI STANDARD
1.Pendaftaran Dokumen Urusniaga yang lengkap dan sempurna dalam
tempoh 1 hari bekerja dari tarikh terima 791 96% 33 4% 824
2.Pendaftaran Dokumen Bukan Urusniaga yang lengkap dan sempurna
dalam tempoh 1 hari bekerja dari tarikh terima 285 97% 9 3% 294
3.
3.1 Pendaftaran Catatan (Noting) berkaitan permohonan urusan Tanah
dalam tempoh 3 hari bekerja 34 100% - - 34
3.2 Pendaftaran Catatan (Noting) berkaitan kelulusan urusan Tanah
dalam tempoh 3 hari bekerja 87 100% - - 87
4.Permohonan Perintah Jual sehingga Siasatan Pertama dalam tempoh
2 bulan 15 100% - - 15
5.Permohonan Carian Kegunaan Rasmi oleh Agensi/Jabatan:
i. 3 hari - < 10 hakmilik 102 100% - - 102
JUMLAH 99% 1%
PENCAPAIAN PIAGAM PELANGGAN
UNIT HASIL
BILJANJI PINDAAN
MENEPATI TEMPOH MASA/
STANDARD PIAGAM
PELANGGAN
TIDAK MENEPATI MASA/
STANDARD PIAGAM
PELANGGAN
JUMLAH
PERKHIDMATANJUMLAH
MENEPATI MASA
%
MENEPATI
MASA
JUMLAH
TIDAK
MENEPATI
STANDARD
***
% TIDAK
MENEPATI
STANDARD
***
1.Memastikan juruwang di kaunter menerima bayaran dan cetakanurusan cukai tanah dalam masa 10 minit bagi setiap transaksi tanpasebarang pindaan pada bil
1075 88% 148 12% 1223
2.Memastikan juruwang di kaunter menerima bayaran dan cetakanurusan perserahan beserta dokumen yang lengkap dalam masa 20 minitbagi setiap transaksi
843 90% 101 10% 944
3.Memastikan kemaskini maklumat cukai dibuat dalam tempoh 20 minit(bergantung kepada permasalahan) bagi setiap transaksi 521 100% 0 0% 521
4.
Memproses permohonan ansuran dalam tempoh 5 hari bekerja daritarikh permohonan sebelum diangkat untuk Kelulusan Pengarah PejabatTanah dan Galian
0 100% 0 0% 0
5.
Memproses permohonan rayuan setelah dokumen yang diterimalengkap seterusnya penyediaan risalat untuk diangkat ke MajlisMesyuarat Kerajaan Negeri (MMKN) dalam tempoh 21 hari bekerjasebelum diserahkan kepada Unit MMKN, PTG
0 100% 0 0% 0
JUMLAH 96% 4%
12
BIL JANJI
MENEPATI TEMPOH
MASA/ STANDARD
PIAGAM PELANGGAN
TIDAK MENEPATI MASA/
STANDARD PIAGAM
PELANGGAN JUMLAH
PERKHIDMATANJUMLAH
MENEPATI
MASA
%
MENEPATI
MASA
JUMLAH
TIDAK
MENEPATI
STANDARD
% TIDAK
MENEPATI
STANDARD
1
Menyelesaikan setiap urusan mengenai
siasatan, laporan dan lain-lain urusan
tanah dalam tempoh 10 hari bekerja
daripada tarikh penerimaan fail
( tertakluk pada jumlah lot)
63 67.3% 33 32.7% 101
2
Menyelesaikan tindakan untuk catatan
(charting) dan penyelesaian pelan hak
milik sementara dalam tempoh masa 3
hari bekerja daripada tarikh penerimaan
fail.
130 76.5% 40 23.5% 170
3
Menyediakan pelan untuk jualan kepada
orang ramai dalam tempoh masa tidak
melebihi 3 hari bekerja daripada tarikh
pembelian.
310 100% 0 0 310
JUMLAH 81% 19%
PENCAPAIAN PIAGAM PELANGGAN
UNIT PENGUATKUASAAN & TEKNIKAL
13
Recommended