View
0
Download
0
Category
Preview:
Citation preview
District 10 2018 Outreach
Joseph P. Dubovi, III., P. E.District Executive
2018 Outreach Agenda
Resources
District Profile
Leslie S. Richards, Secretary of Transportation
Construction Projects
Projects in Design
County Maintenance
Innovation & Improvements
Upcoming Programs
District 10 Profile
INTERESTING TO KNOW:
PA has roughly as many state-maintained miles of highway as New
England, New York, & New Jersey combined (40,000).
PA has the 5th largest roadway system & the 3rd largest number of
bridges in the country.
Back to Agenda
Feature Armstrong Butler Clarion Indiana Jefferson Total
Population 66,486 186,847 38,513 86,364 44,073 422,283
-Townships 28 33 22 24 23 130
-Boroughs 16 23 12 14 11 76
-Cities 1 1 0 0 0 2
State Highway
(Linear Miles) 664 670 476 813 559 3,182
State Highway
(Lane Miles)1,382 1,496 1,006 1,728 1,173 6,785
Interstate Miles 0 29 28 0 24 81
National Highway
System Miles68 107 45 113 39 372
State Routes
ADT >2000103 230 84 112 83 612
State Routes
ADT
PennDOT Vision
PennDOT Mission
County Accreditation
PennDOT Connects
Road MaP
Diversity
Leslie S. Richards, Secretary of Transportation
Back to Agenda
TOPICS
PennDOT Vision
A better quality of life built on
transportation excellence.
Back to Agenda Back to Secretary’s Topics
PennDOT Mission
To provide a sustainable transportation system and quality services that are
embraced by our communities and add value to our customers.
Back to Agenda Back to Secretary’s Topics
• Truck Skills Rodeo
• Safety Stand Down Days
• Training Videos
• School Awareness
County Accreditation – Best Practices
Touch-A-Truck Event
Truck Skills Rodeo
Safety First
Back to Agenda Back to Secretary’s Topics
• Safety Innovation Presentations
• Rolling Roadblock Sign Setting
• Cone Setting Platform
• Seal Coat Signing Pilot
• Flashing Yellow Arrow
County Accreditation – Best Practices
I-80 Rolling Roadblock
Cone Setting Insert
Flashing Yellow Arrow
Safety First
Back to Agenda Back to Secretary’s Topics
County Accreditation – Best Practices
• Asset: People
– Forming effective partnerships
– Recruitment, training, retention
• Asset: Roads
– Sectional Cycle Maintenance
– 5-year Paving Plans
• Asset: Bridges
– Maintenance & preservation
– Rehabilitation or replacement of structurally-deficient (SD) bridges
• Asset: Equipment & Materials
– Equipment sharing between Counties and other Districts
– Efficient procurement & use of winter supplies
Asset Management
Back to Secretary’s TopicsBack to Agenda
Structurally Deficient Bridges
2008 2018
Statewide 6,034 3,114
District 10 580 283
PennDOT Connects
Back to Agenda Back to Secretary’s Topics
Road MaP
Road Maintenance and Preservation
ROAD MaP - Overview
• Funding & Allocation
– Act 89
– Decade of Investment
– Capital Projects
– Preservation & Reconstruction
• Innovation
– RAP
– Equipment Sharing
Back to Agenda Back to Secretary’s Topics
Road MaP
Maintenance
• RAP (Recycled Asphalt Paving)
– Environmentally Conscious
– Ideal for less-traveled roads
• Department Force vs. Outsourcing
• 18-year Sign Life Management
• Sectional Cycle Maintenance
– Increased from 4 to 5 years
• Equipment Sharing
Back to Agenda Back to Secretary’s Topics
Diversity
• Diversity
– All-inclusive Workforce
– Stimulates Innovation
– Sparks Creativity
– Strengthens the Organization
• Recruitment
– Identifying Target Audiences
– Incorporating Results-Driven Strategies
– Participating in Community Outreach
• Retention
– Inclusion Committees
– Training & Organizational Support
Back to Agenda Back to Secretary’s Topics
CONSTRUCTION
Paul F. Koza, Jr., P.E.
Assistant District Engineer for Construction
724-357-2812
Back to Agenda
Outreach 2018 – Clarion County
Back to Agenda
Callensburg Bridge #1
• ECMS #24914
• SR 58
• Clarion County
– Licking Twp.
• Bridge Replacement
• Francis J. Palo, Inc.
• Cost: $5,511,019
• Let: 6/30/16
• Completion: Spring 2018
Back to Agenda
Kissinger Mills Bridge #1
• ECMS #83246
• SR 3004
• Clarion County
– Madison Twp.
• Bridge Replacement
• Clearwater Const., Inc.
• Cost: $906,000
• Let: 5/18/17
• Detour
Back to Agenda
Kahle Bridge
• ECMS #92664
• SR 3020
• Clarion County
– Richland Twp.
• Bridge Replacement
• Francis J. Palo, Inc.
• Cost: $3,383,667
• Let:6/22/17
• Detour
– Open by 10/23/18
Back to Agenda
Stone House Bridge #1
• ECMS #83236
• SR 1007
• Clarion County
– Clarion Twp.
• Box Culvert
• Francis J. Palo, Inc.
• Cost: $1,383,670
• Let: 7/13/17
• Temporary Signal
• SR 1009 Detour
Back to Agenda
I-80 Emlenton PM
• ECMS #106025
• I-80
• Clarion County
– Beaver Twp.
• Resurfacing/Overlay
• IA Construction Corp.
• Cost: $19,385,393
• Let: 7/27/17
• Lane Rental
– Phased Long Term Lane Closures
Back to Agenda
New Bethlehem North PM
• ECMS #106381
• SR 66
• Clarion County
– New Bethlehem
• Resurfacing/Overlay
• Cost: $1.0 to $2.5M
• Let: 3/15/18
Back to Agenda
SR 1015 Forest Road
• ECMS #91859
• SR 1015
• Clarion County
– Farmington Twp.
• Resurfacing/Overlay
• Cost: $1.0 to $2.5M
• Let: 4/12/18
Back to Agenda
Cooksburg North Resurfacing
• ECMS #100144
• SR 36
• Clarion County
– Farmington Twp.
• Resurfacing/Overlay
• Cost: $2.5 to $5.0M
• Let: 4/12/18
Back to Agenda
Reidsburg Bridge Curve
• ECMS #75962
• SR 68
• Clarion County
– Monroe Twp.
• Bridge Replacement
• Cost: $2.5 to $5.0M
• Let: 6/21/18
• Temporary Signal
Back to Agenda
Fenstermaker RR Bridge Removal
• ECMS #92622
• SR 2005
• Clarion County
– Ashland Twp.
• Bridge Removal
• Cost: $1.0 to $2.5M
• Let: 6/21/18
• Detour
Back to Agenda
PA 68/Dolby Street Intersection
• ECMS #24890
• SR 68
• Clarion County
– Monroe Twp
• Widening (Additional lanes)
• Cost: $10.0 to $12.5M
• Let: 8/23/18
Back to Agenda
2018 District Wide Contracts
• 2018 RPM: ECMS #110105
– Cost: $300,000
– Let: 4/12/18
• 2018 Small Paint: ECMS #110106
– Cost: $300,000
– Let: 6/7/18
• Guiderail Contracts:
– Armstrong: ECMS #110870, Cost $200,000
– Butler: ECMS #110871, Cost $250,000
– Clarion: ECMS #110872, Cost $225,000
– Indiana: ECMS #110873, Cost $250,000
– Jefferson: ECMS #110874, Cost $225,000
– Let: 6/7/18
Back to Agenda
Plenary Walsh Keystone Partners – P3 Bridges
– Lawsonham Bridge SR 2009 Madison Twp
• JV 383
• Detour
– http://parapidbridges.com
Back to Agenda
http://parapidbridges.com/
DESIGN
James. R. Andrews, P.E.
Assistant District Engineer for Design
724-357-2805
Back to Agenda
2018 Clarion County Outreach
Back to Agenda
Turnip Hole Bridge No. 3
• Route 58
• Bridge Replacement
• Licking Twp.
• Over McMichael Run
• Detour
• Construction in 2019
• Estimate: $500,000 - $1M
Back to Agenda
Leeper North PM
• Route 36
• Resurfacing
• Washington & Farmington Twps.
• Construction in 2019
• Estimate: $1M - $2.5M
Back to Agenda
Hodil Run Bridge
• Route 58
• Bridge Replacement
• Sligo Twp.
• Over Hodil Run
• Phased Construction
• Construction in 2020
• Estimate: $500,000 - $1M
Back to Agenda
Jack Run Bridge
• Route 2003
• Bridge Replacement
• Porter Twp.
• Over Jack Run
• Detour
• Construction in 2020
• Estimate: $500,000 - $1M
Back to Agenda
Catfish Run
• Route 3006
• Superstructure Replacement
• Madison Township
• Over Catfish Run
• Detour
• Construction in 2020
• Estimate: $500K - $1.5M
Back to Agenda
Craggs Run No. 3
• Route 68
• Bridge Replacement
• Monroe Twp.
• Over Craggs Run
• Phased Construction
• Construction in 2020
• Estimate: $1M - $2.5M
Back to Agenda
South Leatherwood Bridge
• Route 861
• Bridge Replacement
• Porter Twp.
• Over Leatherwood Creek
• Phased Construction
• Construction in 2020
• Estimate: $1M - $2.5M
Back to Agenda
Arthurs 3R
• Route 66
• Rehabilitation
• Paint & Knox Twps.
• Construction in 2020
• Estimate: $5M - $7.5M
Back to Agenda
East Brady North PM
• Route 68 - Resurfacing
• Bradys Bend & Madison Twps.
• Construction in 2020
• Estimate: $2.5M - $5M
Back to Agenda
Elmo Bridge
• Route 322
• Bridge Replacement
• Ashland Twp.
• Over Tributary to Canoe Creek
• Phased Construction
• Construction in 2021
• Estimate: $1M - $2.5M
Back to Agenda
Leatherwood East PM
• Route 861
• Preventive Maintenance
• Porter Twp.
• Construction in 2022
• Estimate: $3M - $5M
Back to Agenda
Limestone North PM
• Route 0066, Seg 0200-0310
• Resurfacing & Minor Improvements
• Limestone & Clarion Twps.
• Construction in 2022
• Estimate: $1M- $5M
Back to Agenda
I-80 Canoe Creek Bridges
• Interstate 80 Eastbound & Westbound
• Bridge Replacements
• Beaver Twp.
• Over Canoe Creek & Tippecanoe Road
• Construction not funded
• Estimate: $100M - $125M
Back to Agenda
Birch Road Bridge
• Route 2001
• Bridge Replacement
• Redbank Twp.
• Over Tributary to Piney Creek
• Detour
• Construction not funded.
• Estimate: $500k - $1M
Back to Agenda
Curllsville Bridge No. 2
• Route 2007
• Bridge Replacement
• Monroe Township
• Over Licking Creek
• Preliminary Engineering beginning in 2019
• Construction not funded
• Estimate: $1M - $2.5M
Back to Agenda
Lickingville Bridge #2
• Route 4004
• Bridge Replacement
• Farmington Twp.
• Over Licking Creek
• Preliminary Engineering beginning in 2021
• Construction not funded
• Estimate: $1.0 - $2.5M
Back to Agenda
Rimersburg Bridge
• Route 2009
• Bridge Replacement
• Toby Twp.
• Over Cherry Run
• Preliminary Engineering beginning in 2022
• Construction not funded
• Estimate: $500K - $1.5M
Back to Agenda
Paint Creek Bridge
• Route 322
• Bridge Replacement
• Elk Twp.
• Preliminary Engineering beginning in 2022
• Construction not funded
• Estimate: $2.0 - $3.5M
Back to Agenda
Little Licking Creek Bridge No. 1
• Route 68
• Bridge Replacement
• Sligo Borough
• Over Little Licking Creek
• Preliminary Engineering beginning in 2022
• Construction not funded
• Estimate: $1M - $2.5M
Back to Agenda
Tylersburg Bridge #2
• Route 4004
• Bridge Replacement
• Farmington Twp.
• Over Trib. to Licking Creek
• Preliminary Engineering beginning in 2022
• Construction not funded
• Estimate: $1.0 - $2.5M
Back to Agenda
Wolfs Corners Bridge
• SR 4017
• Bridge Replacement
• Washington Twp.
• Over Little Tionesta Creek
• Construction not funded
• Estimate: $500,000 - $1M
Back to Agenda
MAINTENANCE
Brian N. Allen, P.E.
Assistant District Engineer for Maintenance
724-357-2809
Back to Agenda
2018 Clarion County Maintenance
• County ManagerJoshua Clinger
• Assistant County ManagerVern Slaugenhoup
• Assistant County Manager Adam Hennessy
• County Equipment Manager Brant Cirrincione
• Roadway Programs Coordinator Ashley Downs
• Adopt a Highway Coordinator Corri Shumaker
21057 Paint Blvd.Shippenville, PA 16254
814-226-8200
Back to Agenda
Clarion County Winter
2017-2018 Clarion County Winter Budget (personnel & operations) $2,776,000
Salt (5-year average in tons) 10,846
Anti-Skid (5-year average in tons) 16,154
Brine (5-year average in gallons) 189,441
Back to Agenda
2018 Clarion County Sectional Cycle
Summer Maintenance Cycle Activities for 2018
– Drainage
– Shoulder Cutting
– General Maintenance
– Seal Coat Surface Treatment
Back to Agenda
2018 Clarion County PennDOT Maintenance
Pipe Replacement / Drainage Program
2018 Planned: 590 feetof Pipe Replacement
2018 Planned: 400 feetof Parallel Pipe Installation
Completed in 2017:890 feet of cross pipe &440 feet of parallel pipe
Back to Agenda
2018 Clarion County PennDOT Maintenance
Underdrain Program
2018 Planned: 6,000 feet
70 feet completed in 2017
Back to Agenda
2018 Clarion County PennDOT Maintenance
Ditch Cleaning Program
2018 Planned: 100,000 feet
8,700 feet completed in 2017
Back to Agenda
2018 Clarion County PennDOT Maintenance
Shoulder Cutting Program
2018 Planned: 191 miles
212 miles completed in 2017
Back to Agenda
2018 Clarion County PennDOT Maintenance
Mowing Program
28 milesInterstate 80
mowed 3 times/year;193 milesMainlines
mowed 2/year
Back to Agenda
2018 Clarion County PennDOT Maintenance
Seal Coat Program
2018 Planned:369,000 gallons
367,500 gallons completed in 2017
Back to Agenda
2018 Clarion County PennDOT Maintenance
Crack Sealing Program
2018 Planned:113 miles
79 miles completed in 2017
Back to Agenda
2017 Department Force Bridge Replacement
SR 4005 over a tributary of Canoe Creek
Beaver Township
2018 Clarion County PennDOT Maintenance
Back to Agenda
2018 Department Force Bridge Replacement
SR 2005 over Jack Run
Porter Township
2018 Clarion County PennDOT Maintenance
Back to Agenda
2018 Clarion County PennDOT Maintenance
Completed 2017 Department Force Bridge
Back to Agenda
2018 Clarion County PennDOT Maintenance
Department Force Bridge Detour
Project Location
Back to Agenda
2018 Clarion County PennDOT Maintenance
2017-2018 Low Cost Safety Initiative Project
• Remove trees from inside of curve and slope bank for site distance on SR 2012
• Slope bank, stabilize and add vegetative growth on SR 536 at the intersection with SR 28
Before the projectBefore the project
Back to Agenda
SR 2005 will be
closed in June of 2018
and reopened in August 2018
Back to Agenda
2018 Clarion County PennDOT Maintenance
2018 Clarion County PennDOT Maintenance
Agility ProgramAgility is a tool to build relationships with
local communities by sharing and exchanging services and resources.
Current active work plans
• Clarion County Career Center
− PennDOT –use of message boards
− Career Center – provides use of conference room with
refreshments and also provides lunches for various meetings
Back to Agenda
Innovation & Improvements
BUTLER VO-TECH, JUDGE’S PICK
Keystone Area (Clarion) Facebook Fan Favorite
Back to Agenda
Innovation & Improvement
ALL ABOUT
SAFETY• Slower Speeds• 90% Reduction in Fatal
Crashes• 75% Reduction in Injury
Crashes• 30-40% Reduction in
Pedestrian Crashes• 10% Reduction in
Bicycle Crashes
CAPACITY• Reduces Delays• 30% Increase in Vehicle
Accommodation
• Increased Traffic Flow
• Click HERE for Roundabout Video
Back to Agenda
http://www.dot.state.pa.us/public/Bureaus/design/Roundabouts/Shockwave Files/4501m001_july12th2004.swf
Upcoming Programs
• Rural Commercial Routes Program
– Low volume route improvements
– Pavement treatments
• Recycled asphalt
• Flexible base
• Warm mix asphalt with higher recycled asphalt percentage
• Municipal Bridge Improvement Program
– Component of Road MaP
– Bundling for cost savings
– Partnering with local government agencies
Back to Agenda
Resources – Customer Care Center
www.penndot.gov
Back to Agenda
Resources - Alerts
• Incidents
• Construction
• Winter road conditions
• Weather forecasts
• Weather alerts
• Plow truck locations
• Zoom to your region
Back to Agenda
Resources – Customer Surveys
www.penndot.govRegional Offices, D10
Customer Service Surveys
Winter Survey – live during the winter
storm season.
Construction Survey – live between mid-
November and the end of December.
Back to Agenda
http://www.penndot.gov/Recommended