Phase II - LoopNet › d2 › fKNRL7lULOl3cwJ1fB8_jg7ZqvfOk… · Phase II . Location • Situated...

Preview:

Citation preview

New Small-BayIndustrial Facilities

GOLDEN EARSBUSINESS PARK

Phase II

WWW.GEBP.CA

Location• Situated at the intersection of Harris Road and Airport Way in Pitt Meadows, Golden Ears Business Park is a strategically located, large-scale business park offering unrivalled on-site and natural amenities.

• Golden Ears Business Park is mere minutes to Lougheed Highway, TransCanada Highway and South Fraser Perimeter Road, and is situated between the fastest growing municipalities in Metro Vancouver.

• Nestled along the north banks of the Fraser River in Pitt Meadows, just 3 minutes west of Golden Ears bridge and 5 minutes north of Port Kells, the Park boasts convenient access to highway, rail, air, port and border distribution points.

Features • Quality construction, attractive landscaping and prominent signage opportunities

• Efficient layouts with ample parking

• Custom office design and sustainable options

• New generation energy efficient ONNI design & versatility

• Situated immediately north of the Fraser River and next to the 10km Pitt River Regional Trail system

• Superior transportation access in an unmatched park setting

• Exceptional Tenant roster includes:

Rates & Specifications

Address 19055 Airport Way, Pitt Meadows

Rental Rates Contact Listing Agents

Additional Rent$2.37 per square foot (2018) *Does not include management fees

OccupancyBuilding 700: July 2018Building 900: July 2018

Ceiling Height 32’ clear

Construction• Extensive glazing & landscaping• Energy efficient insulated concrete tilt-up panels

Office Space Custom-designed office space

Loading • Dock and grade loading per unit• Concrete apron

Floor Load Capacity • 500 lbs psf• Reinforced concrete slab

Sprinkler System ESFR Sprinkler System

Lighting T-5 HO motion sensor lighting

Electrical 100 Amp, 3 Phase Power

Zoning I-3 Light Industrial Business Park

Small Bay Opportunities

BUILDING 300UNDER CONSTRUCTION

Site Plan

LEASED

LEASED

LEASED

LEASED

BUILDING 100

BUILDING 200

BUILDING 500

Building 900: 48,375 sf Bays starting at 2,250 sf – 48,375 sf Available July 2018

Building 700: 25,014 sf Bays starting at 4,040 sf – 25,014 sf Available July 2018

BUILDING 600

Available

BUILDING 900 UNDER CONSTRUCTION

LEASED

LEASED

BUILDING 800

UNDER

CONTRACT

BUILDING 400BUILDING 700

UNDER CONSTRUCTION

LEASED

Ben Lutes, Vice President 604.646.8382 ben.lutes@avisonyoung.com

Ryan Kerr*, Principal 604.647.5094 ryan.kerr@avisonyoung.com * Personal Real Estate Corporation

_21

1

10 10

10

13

7

77

17

91

7A

7B

91

1

99

Surrey

New Westminster

Coquitlam

Port CoquitlamBurnaby

DowntownPort Moody

Maple Ridge

Delta

Richmond

Vancouver

North VancouverWest Vancouver

White Rock

US Border

Langley

17

15