Desa Putri Betung, Kec Putri Betung, Kab Gayo Lues

PLTMH AIH NUSO

BUMDes “ATU PECATUREN”

(commissioned second week October 2008)

IBEKA

“PUTRI BETUNG”

ELECTRIFICATION

DEVELOPMENT PLAN

> 3500 KW hydro power potentials

> +/- 35 km MV power line infrastructure

JAMUR GELE

40 kW

AIH NUSO

2 X 250 kW

AIH KAIS

3 X 500 kW

MARPUNGE

2 X 200 kW

GURAH

3 X 500 kW

+ 10 km underground to local grid

> Touch screen operated> Real time monitor> Remote control

SISTIM KONTROL “PARIKESIT”Pengontrol Aliran Dijital Kemampuan Sistim Terbangkit

MHP HMI (Micro-mini hydro Human Machine Interface)