Pra The Lake District-Kondhwa Pune Progress Photographs Aug-2012

Preview:

DESCRIPTION

PRA Realty is builders from Pune. The Lake District is project by PRA. Here is working progress report of Lake district on August 2012

Citation preview

Progress PhotographsProgress PhotographsAugustAugust 20122012August August -- 20122012

Ph 1 Th L k Di t i tPhase 1- The Lake District

A1 B ildiA1 Building

OHT and column above terrace floor slab for parapet wall in progress

Block work at 10th floor level completed and 11th

floor level in progress

2

Progress Photographs – The Lake District Phase 1

A2 B ildiA2 Building

Block work completed Block and plastering work completed

3

Progress Photographs – The Lake District Phase 1

A2 B ildiA2 Building

Sample flat Living room Sample flat Bed room 1

4

Progress Photographs – The Lake District Phase 1

A2 B ildiA2 Building

Sample flat kitchen Sample Flat Deck Area

5

Progress Photographs – The Lake District Phase 1

B1 B ildiB1 Building

Terrace slab completed Block work at 5th floor level in progress

6

Progress Photographs – The Lake District Phase 1

A1 A d B1 B ildiA1 And B1 Building

A1 Bldg. OHT work in progress and B1 Bldg. Terrace Slab Completed

7

Progress Photographs – The Lake District Phase 1

C1 & C2 B ildiC1 & C2 Building

C1 Building Terrace slab Completed C2 Building OHT work in progress

8

Progress Photographs – The Lake District Phase 1

C3 B ildiC3 Building

C3 Block work completed

9

Progress Photographs – The Lake District Phase 1

D1 B ildiD1 Building

11th floor slab completed

10

Progress Photographs – The Lake District Phase 1

A3 B ildiA3 Building

7th floor slab completed and column above 7th floor slab in progress

Block work up to 5th floor level completed and 6th

floor level in progress

11

Progress Photographs – The Lake District Phase 1

C4 B ildiC4 Building

Upper stilt floor completed and 1st floor reinforcement and shuttering work in progress

12

Progress Photographs – The Lake District Phase 1

D2 B ildiD2 Building

Plinth Completed UGT work and column for upper stilt slab in progress

13

Progress Photographs – The Lake District Phase 1

R t i i llRetaining wall

Retaining wall beside A1 Bldg. for podium level in progress

Podium slab shuttering work behind A1 Bldg. in progress

14

Progress Photographs – The Lake District Phase 1

progress progress

R d W kRoad Work

300 to 400 Chain age 400 to 700 Chain age

15

Progress Photographs – The Lake District Phase 1