Practical delivery of COBie Contractors view 4th June 2014 The Building Centre, London

Jeff Stephens, BIM Strategy Manager jeff.stephens@vinciconstruction.co.uk

Traditional O&M information delivery

2

To successfully use BIM all parties need to agree to rely on the 3D model (as opposed to 2D drawings)

Re-usability - One input, many outputs

Checkability - One input, many checks

Interoperability - One format, many paths

3

4

Where is VINCI Construction on the BIM journey?

BIM Maturity

5

Presenter
Presentation Notes
Level Definitions 0. Unmanaged CAD with paper (or electronic paper) data exchange mechanism. 1. 2D or 3D CAD models supported with file based collaboration tool with some standard data structures and formats at the design stage to reduce requests for information (RFIs) and element clashes. 2. Design teams of various disciplines create detailed as-built 3D models to enable 4D sequencing of the construction process, 5D cost estimating and also feed operational systems. 3. Integration of substantially more stakeholders enabled by “web services” early in the design stage with the potential to employ concurrent engineering processes.

Level 2 BIM documents

The following seven documents are being delivered by the Cabinet Office BIM Task Group and are expected to be utilised on a project: PAS 1192-2:2013 Capital Delivery PAS 1192-3:2014 Operational Delivery BS 1192-4:2014 COBie CIC BIM Protocol Government Soft Landings Uniclass 2 Classification Digital Plan of Works (requirements for the level of graphical detail and level of

information in a 3D model)

The VCUK Projects teams will need to be fully conversant with the Level 2 BIM package of documents and clearly understand how they must be utilised on a project.

6

BIM Maturity – Related Documents

Level 0 Level 1 Level 2 Government Construction Strategy Requirement Data 2D Drawings (PDF) Discipline Specific 3D (native) Non Graphical Data (COBie-UK-2012) Single Common Data Environment (CDE) Documents PAS 91:2013 Construction Prequalification Questionnaires (Table 8) BIM Employer’s Information Requirements Pre-Contract BIM Execution Plan Post-Contract BIM Execution Plan BIM Protocol Collaboration BS1192:2007 Collaborative Information Production File-Based Collaboration & Library Management Model Federation Information Management Role PAS 1192-2:2013 Specification for information management for the capital/delivery phase of construction projects using Building Information Modelling

PAS 1192-3:2014 Specification for information management for the operational phase of construction projects using Building Information Modelling

Government Soft Landings In Development BS 1192-4:2014 Collaborative production of architectural, engineering and construction information – Client information requirements

Digital Plan of Works Classification System (UNICLASS2)

7

8

What will BIM mean for a project?

What will BIM means to the VINCI business?

Early contractor involvement. Avoidance of poor quality BIM data. Processes based on 3D model information, rather than 2D drawings. No/less single stage tenders. Design for manufacture and Offsite fabrication.

9

10

Asset Management Information delivery

The Common Data Environment

11

Ensuring information governance and assurance

12

13

VINCI Construction uses - COBie – Vessel Inspections

Power Station Longitudinal Section

14

Reactor Sections

15

Metrics

2 Power Stations - Hartlepool - Heysham 1

4 Pressure Vessels, each with ~: - 17 Levels - 385 Spaces - 17 Types - 5,625 components - 695 systems (wires) - 7,750 URL search query links - 24,500 attributes

Inspection Data: - 25,000 photos, 75 Gbytes - 7,500 inspection records

16

COBie model with annotation

17

4Projects- 4BIM

18

Viewing Anchor Pegs

19

IFC model geometry substitution

20

Inspection model

21

DDS CAD Viewer

22

Anchor Peg data

23

Inspection Photo

24

IFC model embedded into a PDF report

25

26

xBIM Xplorer and COBie

Xbim Xplorer IFC Model Federation

27

Exported federated COBie spreadsheet

28

29

4Projects BIM on your desktop – 4BIM

4Projects – BIM in a Browser

30

4BIM project – COBie made easy

31

32

P21+ Repeatable Rooms 4Projects – 4BIM

33

Fixtures and fittings

34

Repeatable rooms

35

4 bed room

36

Basin properties

37

COBie data for Basin

38

Room data sheet

39

Basin - occurences

40

41

P21+ Wrightington Hospital

BIM Task Group – Trial Project P21+ Wrightington Phase 1

42

P21+ Wrightington Hospital BIM Task Group, Cabinet Office Trial Projects programme

43

Delivering asset data at handover using the Construction Operations Building information exchange (COBie) standard.

VINCI Constuction UK is a partner in the £1.1m 4BIM UK Government funded R&D project with 4Projects, Northumbria University, AEC3 UK and Kingspan.

Demonstrates the use of COBie and IFC building information models to support construction and manufacturing supply chains.

Trialling in the P21+ Wrightington Hospital project, under the UK Government BIM Task Group, Cabinet Office Trial Projects programme.

P21+ Wrightington

Integrated Health Partnership (IHP) and their BIM core team have lead the implementation of BIM including P21+team engaged with BIM process Adapt Design Team Appointments to capture BIM requirements Establish teams ICT infrastructure and capabilities – CPIx Agree Project Specific Standard Method and Procedure information –

SMP Implement the Common Data Environment BS1192 & PAS1192-

2:2013 and a common numbering convention and project extranet Agree BIM Execution Plan:

- Defines the use of BIM in the project and throughout the project lifecycle - Defines the Construction Operation Building information exchange

(COBie) requirements Design Issue of models as Industry Foundation Classes (IFC) to

capture the assess data for formulation of the COBie data sheet.

44

The information delivery cycle

45

COBie information exchange stages

46

VINCI Procedures

47

Design Management Plan

48

Wrightington Phase 1 BIM Execution Plan

49

Project Goal BIM Goal Measurable objective Achieved if Projected Timeframe

Demonstrate that the design for building structure, the building fabric and components, and all building engineering services installations are fully co-ordinated

Create a virtual 3D model of the project design based on the various discipline models created by the design consultants and sub-contractors.

The project team all use 4Projects 3G Extranet to share model information. Design coordination is improved.

3D models are used for coordination rather than 2D drawings.

From January 2013, and then throughout the project.

Clash Detection To eliminate clashes between building elements and systems and ensure the design is fully co-ordinated prior to construction.

Number of requests for information. Number of clashes encountered during the construction stage.

Compared with projects not using BIM: - Reduction of RFI’s. - Reduction of clashes found during construction.

On-going throughout the project.

Create COBie Data Drop 3 information based on BIM models

Use the various discipline and sub-contractor BIM models as the starting point for creating COBie information.

RIBA Stage F1 / F2

Enhance the COBie data to Data Drop 4, with installation and commissioning information.

Use the 4Projects 3D xBIM system to manage the COBie data that is added by the supply chain team.

O&M Asset Management information is created 4 weeks before practical completion.

Compliant COBie Data Drop 4 Spreadsheet is created.

RIBA Stage K

Proposed major plant item requirements

50

Major Items of plant identified by the WWL Trust.

Items not in this project

CO

Bie

dat

a at

(S

tage

6)

Item

in M

EP

Des

igne

r

(Sta

ge 4

)

O&

M a

dded

by

MEP

C

ontr

acto

r

(Sta

ge 6

)

Comments

LV Distribution Switchgear

✓ ✓ ✓

Energy Meters ✓ X ✓ Meter data to be attributed to item that is being metered

Generators X UPS Installations ✓ ✓ ✓ IPS Installations ✓ ✓ ✓ Auto Transfer Switches

✓ ✓ ✓

Lifts X X X Who will model the lifts?

Lighting and Emergency Lighting

✓ ✓ ✓

Boilers ✓ ✓ ✓ Clorifiers ✓ ✓ ✓ Ventilation & Air Conditioning Systems

a. AHU ✓ ✓ ✓ b. Fan Coil Units ✓ ✓ ✓ c. Fan Convectors X d. Split Systems X e. Variable Refrigerant Flow Systems (VRF)

X

f. Chillers ✓ ✓ ✓ g. Heat Recovery Units

X

h. Out Door Units X Medical Gas Installations

✓ ✓ ✓ Need to check what MEP model plant items are modelled.

Employers Information Requirements for COBie Asset Data at Stage 6

51

Stage 6: Handover and Closeout

O&M Information

Major Items of plant Description C

OB

ie U

K-2

012

IFC

Mod

el

NG

L A

rch

RV

T m

odel

AJP

Stru

ct R

VT

mod

el

RP

S M

EP

RV

T m

odel

NG

B to

add

tag

info

to

RV

T m

odel

2D D

WG

Dra

win

g

2D P

DF

Dra

win

g

Doc

umen

tatio

n

Level of Detail

COBie information requirements Spaces Arch Room,

MEP spaces

✓ ✓ ✓ ✓ Revit Arch Rooms and MEP Spaces defined

HV Distribution: Sub Station X Transformer X RMU X

LV Distribution: LV Switch Boards X LV Panel Boards ✓ ✓ ✓ ✓ ✓ ✓ ✓ LV Distribution Boards ✓ ✓ ✓ ✓ ✓ ✓ ✓

Metering: Meters ✓ ✓ ✓ ✓ ✓ ✓ ✓ Meter data to be attributed to item

that is being metered Earthing & Bonding:

Main Earth Terminal (MET) ✓ ✓ ✓ ✓ ✓ ✓ ✓ Earth Reference Terminal (ERT)

✓ ✓ ✓ ✓ ✓ ✓ ✓

Defining COBie data requirements

52

53

P21+ Wrightington Hospital model checking - Solibri

Coordinated model

54

Coordinated model

55

Structural

56

MEP and Structural

57

MEP and Structural

58

Model review

59

Model checking

60

61

P21+ Wrightington Hospital 4Projects – 4BIM and COBie

4Projects 3G Extranet Common Data Environment

62

Architectural

63

Structural

64

4Projects 4BIM – Model Federation

65

Federate COBie

66

Federation of COBie data

67

COBie Spreadsheet

68

Contacts

69

Facility

70

FLoors

71

Spaces

72

Types

73

Components

74

Assembly

75

Systems

76

77

New Covent Garden Market

In site context

78

Coordination

79

Structural models

80

81

Questions

Jeff Stephens, BIM Strategy Manager jeff.stephens@vinciconstruction.co.uk