Charles Schwab Expansion

Phoenix, AZ

Charles Schwab

Installation of underground/building plumbing, chilled water piping system and HVAC duct fabrication/equipment installation for the two story expansion of the existing building. The scope also included installation of 38 Liebert (CRAC), steam humidifiers, fuel polishing system and existing cooling tower modifications.