Proposed Group Housing Project
At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))
M/s ATS Homes Pvt. Ltd. 1 JM EnviroNet Pvt. Ltd.
APPENDAPPENDAPPENDAPPENDIIIIXXXX
(See pa(See pa(See pa(See parrrragragragragraaaaphphphph----6666))))
FORM 1FORM 1FORM 1FORM 1
I.I.I.I. Basic InfoBasic InfoBasic InfoBasic Informrmrmrmationationationation
S. S. S. S.
No.No.No.No.
ItemItemItemItem Details Details Details Details
1. Name of the project Proposed Group Housing Project at Plot No. – SC-01/01,
Sector – 152, Noida, Uttar Pradesh
2. S. No. in the Schedule Building and Construction Project, Category ‘B’ [(As per
14.09.2006 Notification, Project or Activity-8 (a)]
3. Proposed capacity /area/ length/
tonnage to be handled/ command
area /lease area/ number of wells
to be drilled:
Total Plot area: 10.685 ha. (1,06,852.08 sq. m.)
F.A.R. Permissible: 378820.14 sq. m.
Proposed: 297130.644 sq. m. (Proposed
F.A.R. for Commercial: 15050.678 sq. m.
+ Proposed F.A.R. for Residential:
282079.966 sq. m.)
Ground
coverage
Permissible: 32055.62 sq. m (30.00 % of
plot area)
Proposed: 18654.593 sq. m (17.46 % of
plot area)
Built up area: 501124.805 sq. m (F.A.R- 297130.644 sq.
m + Area Under Services – 41162.662 sq.
m. + Basement Area- 73727.387 sq. m. +
Stilt Area – 39114 sq. m. + non-F.A.R.
area – 49990.112 sq. m.)
4. New/Expansion/Modernization The proposed project is a New Building Construction
Project.
5. Existing Capacity/Area etc. Not Applicable, as the proposed project is a fresh Building
Construction Project.
6. Category of Project i.e.' A' or 'B' Category ‘B’
7. Does it attract the general
condition? If yes, Please specify.
No, it does not attract the general condition, as General
Conditions are not applicable on S. No.– 8 projects of EIA
Notification dated 14.09.2006.
8. Does it attract the specific
condition? If 'yes, please specify.
No, it does not attract the specific condition, as Specific
Conditions are not applicable on S. No. –8 projects of EIA
Notification dated 14.09.2006.
Proposed Group Housing Project
At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))
M/s ATS Homes Pvt. Ltd. 2 JM EnviroNet Pvt. Ltd.
9. Location: Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh
Plot/Survey/Khasra. No. SC-01/01,
Sector 152
District Noida
State Uttar Pradesh
Land documents are attached as Annexure IIAnnexure IIAnnexure IIAnnexure II....
10. Nearest Railway Station/ Airport
along with distance in kms.
Nearest Railway Station: Nearest Railway Station: Nearest Railway Station: Nearest Railway Station: Okhla Railway Station 24.0 km in
NW direction from the Project Site (approx).
Nearest Airport:Nearest Airport:Nearest Airport:Nearest Airport: Indira Gandhi International Airport, Delhi
approx. 39.0 km in WNW direction from the Project Site.
11. Nearest Town, city, District
Headquarters along with distance
in kms.
The Project site fall within Noida Development Authority
limits. District Headquarter, Noida.
12. Village Panchayats, Zilla Parishad,
Municipal Corporation, Local
body (complete postal addresses
with telephone nos. to be given)
Noida Development AuthorityNoida Development AuthorityNoida Development AuthorityNoida Development Authority
Sector 6, Noida – 201301, District. Gautam Budh Nagar,
Uttar Pradesh, India
Fax: 91- 120- 2422210-317
Help Line No. 2425025
E-Mail: noida@noidaauthorityonline.com
13. Name of the applicant M/s. ATS Homes Pvt. Ltd.
14. Registered address 711/92, Deepali, Nehru Place, New Delhi-110019
15. Address for correspondence (1)
Name Mr. S.J. Raza
Designation
(Owner/Partner/CEO)
Authorized signatory
(Authorization Letter is enclosed as Annexure I)
Address Flat No. G-25 , Ground floor, Block –C, Gaur global
village, Crossing Republic , Ghaziabad, U.P
Pin Code 201016
E-mail sjraza@atsgreens.com
Telephone No. 09711098902
Fax No. -
Address for correspondence (2): Environnemental Consultant
Mr. Sunil Dixit
(Associates Director)
Proposed Group Housing Project
At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))
M/s ATS Homes Pvt. Ltd. 3 JM EnviroNet Pvt. Ltd.
J. M. EnviroNet (P) Ltd.
1st & 2nd Floor, S.C.O. 16,
Sector 10 – A, Gurgaon (Haryana)
Tel. 0124 – 3206559
Mobile No. 09971699906
Email: jmgurgaon@hotmail.com
Disclosure of the consultant has been enclosed as AnnexureAnnexureAnnexureAnnexure
IIIIIIIIIIII. . . .
16. Details of Alternative Sites
examined, if any. Location of
these sites should be shown on a
topo sheet.
There is not any alternative site related to this project as
this is a Group Housing project M/s ATS Homes Pvt. Ltd.
Keeping in view the above narrated facts, no alternative
site can be given here. Hence Not Applicable in this case
The land document is attached as The land document is attached as The land document is attached as The land document is attached as Annexure II.Annexure II.Annexure II.Annexure II.
17. Interlinked Projects There is not any interlinked project, related to this project
as this is a Group Housing Project of M/s ATS Homes Pvt.
Ltd.
18. Whether separate application of
interlinked project has been
submitted
Not Applicable, as this is a Group Housing Project of M/s
ATS Homes Pvt. Ltd.
19. If yes, date of submission Not Applicable, as this is a Group Housing Project of M/s
ATS Homes Pvt. Ltd.
20. If no, reason Not Applicable, as this is a Group Housing Project of M/s
ATS Homes Pvt. Ltd.
21. Whether the proposal involves
approval/ clearance under: if yes,
details of the same and their
status to be given.
(a) The Forest (Conservation)
Act, 1980?
(b) The Wildlife (Protection)
Act, 1972?
(c) The C.R.Z. Notification,
1991?
Not Applicable, as no approval / Clearance involves under
any Notification and under any Act, a Group Housing
Project of M/s ATS Homes Pvt. Ltd.
22. Whether there is any Government
Order/ Policy relevant/ relating to
the site?
Not any, Proposed Project is a Group Housing Project of
M/s ATS Homes Pvt. Ltd.
23. Forest land involved (hectares) Not any Forest land involved is a Group Housing Project
Proposed Group Housing Project
At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))
M/s ATS Homes Pvt. Ltd. 4 JM EnviroNet Pvt. Ltd.
of M/s ATS Homes Pvt. Ltd.
24. Whether there is any litigation
pending against the project
and/or land in which the project
is proposed to be set up?
(a)Name of the Court
(b)Case No.
(c) Orders/directions of the Court,
if any and its relevance with the
proposed project
No litigation is pending against the project and/or land in
which the project is proposed to be set up.
(II)(II)(II)(II) ActivityActivityActivityActivity
1.1.1.1. Construction, operation or decommissioning of the Project involving actions, which will cause Construction, operation or decommissioning of the Project involving actions, which will cause Construction, operation or decommissioning of the Project involving actions, which will cause Construction, operation or decommissioning of the Project involving actions, which will cause
physical changes in physical changes in physical changes in physical changes in the locality (topography, land use, changes in water bodies, etc.the locality (topography, land use, changes in water bodies, etc.the locality (topography, land use, changes in water bodies, etc.the locality (topography, land use, changes in water bodies, etc.
S. S. S. S.
No.No.No.No.
Information/Checklist confirmationInformation/Checklist confirmationInformation/Checklist confirmationInformation/Checklist confirmation Yes/ Yes/ Yes/ Yes/
NoNoNoNo
Details thereof (with approximate quantities Details thereof (with approximate quantities Details thereof (with approximate quantities Details thereof (with approximate quantities
/rates, wherever possible) with source of /rates, wherever possible) with source of /rates, wherever possible) with source of /rates, wherever possible) with source of
information datainformation datainformation datainformation data
1.1 Permanent or temporary change in
land use, land cover or topography
including increase in intensity of land
use (with respect to local land use
plan)
Yes The Proposed Project being developed by M/s.
ATS Homes Pvt. Ltd. is a construction of a new
Group Housing Project on plot 10.685 ha.
(1,06,852.08 sq. m.) of a vacant land. (Land
documents are enclosed as Annexure Annexure Annexure Annexure –––– IIIIIIII).
There Will bé green-area development on
43379.800 m2 (40.60 % of total plot area) of
the plot to provide beautiful and natural
environment to the site.
1.2 Clearance of existing land, vegetation
and buildings?
No The proposed site is an open land, with scanty
vegetations mainly herbs and low lying shrubs &
possesses existing no structure. Hence no
clearance of structure and vegetation will be
required.
Site photographs showing the present condition
of the site have been enclosed as AnnexureAnnexureAnnexureAnnexure IIIIVVVV....
Proposed Group Housing Project
At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))
M/s ATS Homes Pvt. Ltd. 5 JM EnviroNet Pvt. Ltd.
1.3 Creation of new land uses? No Project has been earmarked for commercial
development as per Master Plan of Noida The
project site will be developed as per the local
building by-laws. So, no new land use will be
created. Location map of the project site along
with the Noida Master Plan is being enclosed as
AnnexureAnnexureAnnexureAnnexure----V.V.V.V.
1.4 Pre-construction investigations e.g.
bore holes, soil testing?
Yes Soil investigation was carried out and the results
were found satisfactory.
1.5 Construction works? Yes This is a building construction project. The
construction activities will be confined within
the project site; there will be no physical
changes due to project development
activities outside the project boundary.
1.6 Demolition works?
No No demolition is required, as no building
structure exits at the proposed project site.
1.7 Temporary sites used for construction
works or housing of construction
workers?
No No temporary residential facilities will be
required for the workers, as all the workers will
be coming from nearby area. The construction
work will be done only in the daytime.
There will be provision of facilities such as rest
shelter, drinking water, toilet etc. for workers at
the project site & will be arranged by contractor.
1.8 Above ground buildings, structures or
earthworks including linear
structures, cut and fill or excavations
Yes Excavation materiel carried out for foundation
and construction of basement. The estimated
quantity of excavated earth material will be
used for back filling, and other site
developmental activities like leveling and
horticulture at the project site. The fertile top
soil will be stack at separate place and it will be
reused for plantation / horticulture purpose on
site of the project.
Land/soil environment may be temporarily
affected due to activities like Site preparation,
excavation, material handling & storage etc.
during construction phase, which will be
mitigate by dust suppression and water
sprinkling.
Proposed Group Housing Project
At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))
M/s ATS Homes Pvt. Ltd. 6 JM EnviroNet Pvt. Ltd.
1.9 Underground works including mining
or tunnelling?
No No underground works including mining /
tunnelling is required, except excavation of
earth only for the construction of basement.
1.10 Reclamation works? No No reclamation work required, as the basement
shall be used for parking and other services.
1.11 Dredging? No No dredging required, as case of Group Housing
development project.
1.12 Offshore structures? No No dredging required, as case of Group Housing
development project.
1.13 Production and manufacturing
processes?
No Since, it is a construction of Group Housing
Project, hence, no production / manufacturing
process is involved in this project.
1.14 Facilities for storage of goods or
materials?
Yes Separate raw material storage yard will be made
during construction phase:
• Cement will be separately stored under
cover in bales.
• Sand will be stacked neatly under
tarpaulin cover.
• Bricks and steel will be laid in open
• The raw material handling yard will be
located within the project site and
separated by enclosures.
1.15 Facilities for treatment or disposal of
solid waste or liquid effluents?
Yes Solid WasteSolid WasteSolid WasteSolid Waste
Solid wastes which are likely to be generated in
project will be domestic and commercial in
nature.
DomesDomesDomesDomestic wastes: tic wastes: tic wastes: tic wastes:
Approximately, 4308 kg/day of solid waste will
be generated from the existing and project
activity; these will be collected from designated
locations and segregated into inorganic and
organic wastes. The inorganic non-
biodegradable wastes will be sold to vendors for
recycling and the organic biodegradable wastes
will be disposed as per MSW rules.
Commercial waste (ECommercial waste (ECommercial waste (ECommercial waste (E----wasteswasteswasteswastes):::: E-waste will start
being generated after a latency period of 4-5
Proposed Group Housing Project
At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))
M/s ATS Homes Pvt. Ltd. 7 JM EnviroNet Pvt. Ltd.
years. Since most of these components are
recyclable in nature, efforts will be made to
recycle it to the maximum extent, hence actual
waste generated as E-waste should be minimal.
It is estimated that from the project about 0.5-1
MT/yr E-waste will be generated.
Management of EManagement of EManagement of EManagement of E----wastewastewastewaste
The principle idea of E-waste management is to
recycle the E-waste generated. Authorized
vendors of electronic goods will take back their
old equipment/cartridge/toner rolls etc. and pay
some concessions on the new equipment. On
the other hand, reusable material like
cartridges/toners will be refilled and reused.
Outdated computers/ fax/ phones etc. will be
value added and sold to downstream uses
through resellers. These arrangements will be
made with existing CPCB authorized vendors to
simultaneously & effectively reduce the quantity
of E-waste generated and also to generate
substantial revenue for running the management
system. Whatever E-waste left, will be collected
separately in HDPE drums and will be stored in
special containments, onto puckka platforms
and under lock and key. The collected e –waste
will be handed over to the CPCB authorized
vendors.
Liquid Effluent:Liquid Effluent:Liquid Effluent:Liquid Effluent:
During construction phase, sewage will be
treated and disposed through soak pits via septic
tanks. During operation phase 733 KLD waste
water will be generated which will be treated in
the Sewage Treatment Plant (STP) up to tertiary
level.
Dewatered/ dried sludge from STP will be used
as manure in horticulture.
Hazardous Wastes:Hazardous Wastes:Hazardous Wastes:Hazardous Wastes:
No hazardous wastes will be produced from
project activities except some Spent Oil
Proposed Group Housing Project
At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))
M/s ATS Homes Pvt. Ltd. 8 JM EnviroNet Pvt. Ltd.
(Category 5.1) generated from D.G. sets; it will
be stored in HDPE tank properly and will be
handed over to authorized processor for the
facility.
1.16 Facilities for long term housing of
operational workers?
No No facilities for long term housing of
operational workers are proposed, as they are
coming from nearby area.
1.17 New road, rail or sea traffic during
construction or operation?
No The project site is well connected by wide
service road, So no new road will be laid during
construction or operation of the project
activities except for internal roads.
1.18 New road, rail, air or waterborne or
other transport infrastructure
including new or altered routes and
stations, ports, airports etc?
No The project site is located in a developed area. It
is well connected by roads to whole of the city,
so there will be no alteration of routes or lying
down of new routes done due to project
activity. Internal roads within the project site
will be constructed for smooth movement of
traffic.
1.19 Closure or diversion of existing
transport routes or infrastructure
leading to changes in traffic
movements?
No There shall not be any closure or diversion of
existing transport routes. So there shall not be
any change in traffic movement.
1.20 New or diverted transmission lines or
pipelines?
No There will be no shifting of electrical
transmission line.
1.21 Impoundment, damming, culverting,
realignment or other changes to the
hydrology of watercourses or
aquifers?
No No impoundment, damming, culverting,
realignment or other changes to the hydrology
of surface watercourses is proposed.
1.22 Stream crossings? No As such no river or drain is passing by the
project site.
1.23 Abstraction or transfers of water
form ground or surface waters?
Yes The total water requirement of the project will
be 1105 KLD. The fresh water required will be
646 KLD; the recycled water demand will be
459 KLD. The water will be sourced from
private water tanker supply and Noida
Development Authority.
1.24 Changes in water bodies or the land No There shall be no effect on Surface Drainage /
Proposed Group Housing Project
At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))
M/s ATS Homes Pvt. Ltd. 9 JM EnviroNet Pvt. Ltd.
surface affecting drainage or run-off? Runoff as the required land for the project with
any water body near the project site.
For collecting storm water, storm water
drainage network has been provided during the
design as per the guidelines. Adequate measures
will be taken to collect run off and suitable
garlanding drain as per the existing contours of
the plot will be developed.
1.25 Transport of personnel or materials
for construction, operation or
decommissioning?
Yes Transport of personnel/material during the
construction and operation of the commercial
project shall be envisaged. During the
operational phase sufficient parking space will
be provided for the vehicles like scooters, cars
and bus.
1.26 Long-term dismantling or
decommissioning or restoration
works?
No This is a new construction of Group Housing
project, hence no Long-term dismantling or
decommissioning or restoration works.
1.27 Ongoing activity during
decommissioning which could have
an impact on the environment?
No Not Applicable, as this is a new construction of
Group Housing project.
1.28 Influx of people to an area in either
temporarily or permanently?
Yes All the workers employed / hired will be from
nearby areas. Hence, there will be minor influx
of people in the area. Temporarily local labours
will visit the site during the construction phase
and during operation phase approx 1000
persons will be involved in the project
1.29 Introduction of alien species? No All the trees and plants that are proposed to be
planted are native to the area.
1.30 Loss of native species or genetic
diversity?
No No such case is reported from the area so far. As
environmental disturbance is not much and it is
not likely in future also.
1.31 Any other actions? None None, no other actions will be required except
mentioned above.
2222.... Use of Natural resources for construction or operation of the Project (such as land, water, Use of Natural resources for construction or operation of the Project (such as land, water, Use of Natural resources for construction or operation of the Project (such as land, water, Use of Natural resources for construction or operation of the Project (such as land, water,
materials or energy, especially any resources which are nonmaterials or energy, especially any resources which are nonmaterials or energy, especially any resources which are nonmaterials or energy, especially any resources which are non----renewable or in short srenewable or in short srenewable or in short srenewable or in short supply):upply):upply):upply):
S. S. S. S. Information/Information/Information/Information/ checklist confirmationchecklist confirmationchecklist confirmationchecklist confirmation Yes/ Yes/ Yes/ Yes/ Details thereof (with approximate quantities Details thereof (with approximate quantities Details thereof (with approximate quantities Details thereof (with approximate quantities
Proposed Group Housing Project
At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))
M/s ATS Homes Pvt. Ltd. 10 JM EnviroNet Pvt. Ltd.
No.No.No.No. NoNoNoNo /rates, wherever possible) with source of /rates, wherever possible) with source of /rates, wherever possible) with source of /rates, wherever possible) with source of
information datainformation datainformation datainformation data
2.1 Land especially undeveloped or
agricultural land (ha)
No The Proposed Group Housing project is a
construction on plot area 10.685 ha.
(1,06,852.08 sq. m.) of vacant land. The area
around the project site is under rapid
development.
2.2 Water (expected source &
competing users) unit: KLD
Yes The total water requirement of the project will
be 1105 KLD. The fresh water required will be
646 KLD; the recycled water demand will be 459
KLD. The water will be sourced from Hired
Private Water Tankers supplying water from safe
zone. Waste water will be treated in STP. Dual
Plumbing system will be proposed for recycling
the treated water for flushing, horticulture
purpose.
2.3 Minerals (MT) Yes Sand and stone aggregates will be use as
Construction material.
2.4 Construction material–stone,
aggregates, sand / soil (expected
source – MT)
Yes Usual construction materials will be utilized like
Cements, Bricks, Sand, Iron rods, Fly ash based
products, etc.
Source:Source:Source:Source: Steel and cement will be procured from
authorized vendors. Sand & aggregate will be
procured from local material suppliers.
2.5 Forests and timber (source – MT) No Timber required will be taken from nearby
markets.
2.6 Energy including electricity and fuels
(source, competing users) Unit: fuel
(MT), energy (MW)
Yes The power Requirement for the proposed
project total connected load is 11863.737 KW.
Source of electricity: Local grid supply of Noida,
U.P.
8 no. of D.G. sets with capacity of 9375 KVA
(7x1250 KVA + 1 x 625 KVA) will be installed for
power back up in case of power failure.
2.7 Any other natural resources (use
appropriate standard units)
No Not applicable, not any natural resources will be
required except mentioned above.
3. 3. 3. 3. Use, storage, transport, handling or production of substances or materials, which could be Use, storage, transport, handling or production of substances or materials, which could be Use, storage, transport, handling or production of substances or materials, which could be Use, storage, transport, handling or production of substances or materials, which could be
harmful to human health or the environment or raise concerharmful to human health or the environment or raise concerharmful to human health or the environment or raise concerharmful to human health or the environment or raise concerns about actual or perceived risks to ns about actual or perceived risks to ns about actual or perceived risks to ns about actual or perceived risks to
human health.human health.human health.human health.
S. S. S. S. Information/Checklist confirmationInformation/Checklist confirmationInformation/Checklist confirmationInformation/Checklist confirmation Yes/Yes/Yes/Yes/ Details thereof (with approximate quantities/Details thereof (with approximate quantities/Details thereof (with approximate quantities/Details thereof (with approximate quantities/
Proposed Group Housing Project
At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))
M/s ATS Homes Pvt. Ltd. 11 JM EnviroNet Pvt. Ltd.
No.No.No.No. NoNoNoNo rates, wherever possible) with source of rates, wherever possible) with source of rates, wherever possible) with source of rates, wherever possible) with source of
information datainformation datainformation datainformation data
3.1 Use of substances or materials,
which are hazardous (as per MSIHC
rules) to human health or the
environment (flora, fauna, and
water supplies)
No The project is a Group Housing Project and
hence, no storage of hazardous chemicals (as
per MSIHC rules) will be done, except HSD
required to run D.G. sets, for which the
quantity stored will be below the threshold
limit specified in the MSIHC rules. Necessary
permission will be obtained from the Explosives
Dept.
3.2 Changes in occurrence of disease or
affect disease vectors (e.g. insect or
water borne diseases)
No Suitable drainage and waste management
measures will be adopted in both the
Construction and Operational Phase, which will
restrict stagnation of water or accumulation of
waste. This will effectively restrict the
reproduction and growth of disease vectors.
3.3 Affect the welfare of people e.g. by
changing living conditions?
Yes No use, storage, transport, handling or
production of any harmful product will be
envisaged from the project. Thus no major
adverse impacts on the human health/
environment are envisaged.
Moreover this project will help in increasing
socio-economic standards of the local people. It
will generate employment. Thus, the project is
supposed to have major beneficial impacts.
3.4 Vulnerable groups of people who
could be affected by the project e.g.
hospital patients, children, the
elderly etc.,
No No effect is envisaged due to this project.
3.5 Any other causes None Not applicable, as there not any other risk will be
developed except mentioned above.
4.4.4.4. Production ofProduction ofProduction ofProduction of solid wastes during construction or operation or decommissioning (MT/month)solid wastes during construction or operation or decommissioning (MT/month)solid wastes during construction or operation or decommissioning (MT/month)solid wastes during construction or operation or decommissioning (MT/month)
S. No.S. No.S. No.S. No. Information/Checklist confirmationInformation/Checklist confirmationInformation/Checklist confirmationInformation/Checklist confirmation Yes/ Yes/ Yes/ Yes/
NoNoNoNo
Details thereof (with approximate Details thereof (with approximate Details thereof (with approximate Details thereof (with approximate
quantities/rates, wherever possible) with source quantities/rates, wherever possible) with source quantities/rates, wherever possible) with source quantities/rates, wherever possible) with source
of information dataof information dataof information dataof information data
Proposed Group Housing Project
At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))
M/s ATS Homes Pvt. Ltd. 12 JM EnviroNet Pvt. Ltd.
4.1 Spoil, overburden or mine wastes No No spoil, overburden or mine waste will be
generated in this case.
4.2 Municipal waste (domestic and or
commercial wastes)
Yes Solid wastes likely to be generated in project are
of domestic and commercial in nature.
During operation phase total Solid Waste
generated from Project (Permanent & visiting
population) will be 4308 kg/day. Base of
calculation @ 250 gm/person/day for floating
population and @ 450 gm/person/day for
permanent population, which will be collected
from designated location and segregated into
inorganic and organic wastes. Solid waste will be
disposed off as per MSW (M & H) Rules, 2000.
The sludge generated from STP will be used as
manures in horticulture.
4.3 Hazardous wastes (as per
Hazardous Waste Management
Rules)
No Spent Oil from D.G. sets will be carefully stored
in High Density Polythene (HDPE) drums in
isolated covered facility. This spent oil will be
handed over to some authorized processor.
Suitable care will be taken so that spills / leaks of
spent oil from storage could be avoided.
The used oil generated from DG set will be
disposed off as per H.W. (M & H) Rules, 1989.
4.4 Other industrial process wastes No Not applicable, as this is a Group Housing Project
thus there will not be any production of
industrial waste during construction or operation.
4.5 Surplus product No Not applicable, as this is a New Group Housing
Project.
4.6 Sewage sludge or other sludge from
effluent treatment
Yes The mechanism of sludge drying will be
centrifugation and the dewatered/ dried sludge
from STP will be converted to cakes and will be
used as manures in horticulture and also disposed
to designated municipal area. The total waste
water generation will be 733 KLD, which will be
treated in STP and reuse for Flushing of toilets &
irrigation of green area development.
Proposed Group Housing Project
At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))
M/s ATS Homes Pvt. Ltd. 13 JM EnviroNet Pvt. Ltd.
4.7 Construction or demolition wastes Yes Construction waste generation will be limited
to the construction phase only and will be
limited to project site only. These will be
reused for levelling, backfilling and site
preparation after manual segregation. Unusable
and excess construction debris will be disposed at
designated places in tune with the local norms.
Some quantity of construction debris will be used
for road development activities.
The estimated quantity of excavated earth
material shall be utilized at site for the purpose of
back filling, green area development, and other
site development activities.
4.8 Redundant machinery or equipment No No Redundant machinery or equipment is
involved.
4.9 Contaminated soils or other
materials
No No Contaminated soils or other materials are
involved.
4.10 Agricultural wastes No Not applicable, as this is a New construction
project of Group Housing thus there will not be
any Agriculture Wastes produced during
construction or operation phase.
4.11 Other solid wastes No Not applicable, as there not any other solid
waste produces except mentioned above.
5.5.5.5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)
S. S. S. S.
No.No.No.No.
Information/ChecklisInformation/ChecklisInformation/ChecklisInformation/Checklist confirmationt confirmationt confirmationt confirmation Yes/ Yes/ Yes/ Yes/
NoNoNoNo
Details thereof (with approximate quantities/Details thereof (with approximate quantities/Details thereof (with approximate quantities/Details thereof (with approximate quantities/
rates, wherever possible) with source of rates, wherever possible) with source of rates, wherever possible) with source of rates, wherever possible) with source of
information datainformation datainformation datainformation data
5.1 Emissions from combustion of fossil
fuels from stationary or mobile
sources
Yes There is no major air pollutant generating
source in this project except operation of D.G
Sets and vehicular movement. The emission of
gasses & Particulate Matter will be due to use of
diesel in D.G. set. The emissions from DG sets
shall be within MoEF limits. There will be
generation of noise from D.G. set but that will
be only during the time of power failure.
Moreover, D.G. Set / D.G. Set Rooms will be
provided with proper acoustic enclosure /
Proposed Group Housing Project
At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))
M/s ATS Homes Pvt. Ltd. 14 JM EnviroNet Pvt. Ltd.
acoustic treatment that will mitigate the noise
up to a large extent.
During construction phase as well as during
commissioning phase there will be generation
of noise due to transport of vehicle. Better
maintenance and installation of proper
pollution control equipment will help to reduce
such emissions.
5.2 Emissions from production processes No Not applicable, as this is Group Housing Project
and there is not any production process.
5.3 Emissions from materials handling
including storage or transport
Yes Dust may arise due to the materials handling
during the construction phase which will be
restricted to the construction phase and
construction site only.
Dust emission will be prevented by regular
sprinkling of water and by providing tarpaulin
covers.
5.4 Emissions from construction activities
including plant and equipment
Yes Dust emission will be restricted to construction
phase and construction site only. The dust
emitted will be of negligible amount and will be
generated due to movement of the equipments.
Suitable preventive measures will be taken.
5.5 Dust or odours from handling of
materials including construction
materials, sewage and waste
Yes There is chance of dust emission during the
construction phase which will be prevented by
the sprinkling of water and covering the raw
material by tarpaulin cover.
Better sanitation facilities will be provided to
workers so that there will be no odour
generation. There would not be much impact
of noise due to operation of D.G. sets because
firstly they will be in use only during power
failure and secondly they be provided with
proper acoustic enclosure that will help in
mitigating noise up to a large extent. Moreover,
the green belt plantation will further attenuate
the noise level so the impact of noise due to
operation of D.G. set will be negligible.
5.6 Emissions from incineration of waste No Not applicable, as this is a Group Housing
Project and there will not be any incineration
Proposed Group Housing Project
At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))
M/s ATS Homes Pvt. Ltd. 15 JM EnviroNet Pvt. Ltd.
of wastes
5.7 Emissions from burning of waste in
open air (e.g. slash materials,
construction debris)
No Open burning of biomass / other material will
be prohibited.
5.8 Emissions from any other sources No Not applicable, no other actions will be
required except mentioned above.
6666 Generation of Noise and Vibration, and Emissions of Light and Heat:Generation of Noise and Vibration, and Emissions of Light and Heat:Generation of Noise and Vibration, and Emissions of Light and Heat:Generation of Noise and Vibration, and Emissions of Light and Heat:
S. S. S. S.
No.No.No.No.
Information/Checklist confirmationInformation/Checklist confirmationInformation/Checklist confirmationInformation/Checklist confirmation Yes/ Yes/ Yes/ Yes/
NoNoNoNo
Details thereof (with approxiDetails thereof (with approxiDetails thereof (with approxiDetails thereof (with approximate quantities/mate quantities/mate quantities/mate quantities/
rates, wherever possible) with source of rates, wherever possible) with source of rates, wherever possible) with source of rates, wherever possible) with source of
information data with source of information information data with source of information information data with source of information information data with source of information
datadatadatadata
6.1 From operation of equipment e.g.
engines, ventilation plant, crushers
Yes The machinery used for the construction activity
will be of high standard and of reputed make
and according to the international standards.
These standards themselves take care of noise
pollution control/vibration control and air
emission control. Hence insignificant impacts due
to construction machinery are envisaged. Apart
from this the construction activity will be carried
out in day time only.
During the operation phase of the project, the
noise emission is caused only due to DG sets
installed for backup power supply. As the DG
sets will be placed in an acoustic enclosure, hence
the noise generated meets the ambient standard
as per MoEF norms.
6.2 From industrial or similar processes. No Not Applicable
6.3 From construction or demolition No Due to the various construction activities, there
will be short-term noise impacts in the immediate
vicinity of the project site. The construction
activities will include the following noise
generating activities:
Operation of DG sets, concreting & mixing
Excavation for foundation and grading of the
site. Construction plant and heavy vehicle
movement. Construction of structures and
facilities.
Proposed Group Housing Project
At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))
M/s ATS Homes Pvt. Ltd. 16 JM EnviroNet Pvt. Ltd.
6.4 From blasting or piling No No blasting or mechanized piling will be done in
construction phase.
6.5 From construction or operational
traffic
Yes Some noise will be generated from vehicular
movement in the construction and operational
phase. Every possible provision will be taken up
to avoid/minimize traffic chaos.
During construction phase noise will be
generated due to excavation machineries,
movement of heavy vehicles like trucks. In
Operational phase major source of noise is D.G.
set which will operate in case of power failure.
Increase in noise and vibration due to traffic of
project site will be marginal. Hence noise and
vibration due to traffic is not anticipated on the
project site. This will be minimized by plantation
along the roadside.
6.6 From lighting or cooling systems No Not envisaged.
6.7 From any other sources No There will be no other sources for noise &
vibration generation except the mentioned
above.
7.7.7.7. Risks of contamiRisks of contamiRisks of contamiRisks of contamination of land or water from releases of pollutants into the ground or into nation of land or water from releases of pollutants into the ground or into nation of land or water from releases of pollutants into the ground or into nation of land or water from releases of pollutants into the ground or into
sewers, surface waters, groundwater, coastal waters or the sea:sewers, surface waters, groundwater, coastal waters or the sea:sewers, surface waters, groundwater, coastal waters or the sea:sewers, surface waters, groundwater, coastal waters or the sea:
S. S. S. S.
No.No.No.No.
Information/Checklist confirmationInformation/Checklist confirmationInformation/Checklist confirmationInformation/Checklist confirmation Yes/ Yes/ Yes/ Yes/
NoNoNoNo
Details thereof (with approximate quantities/Details thereof (with approximate quantities/Details thereof (with approximate quantities/Details thereof (with approximate quantities/
rates, wherever possrates, wherever possrates, wherever possrates, wherever possible) with source of ible) with source of ible) with source of ible) with source of
information datainformation datainformation datainformation data
7.1 From handling, storage, use or
spillage of hazardous materials
No Used oil from D.G. Sets will be handled with
care, it will be stored in HDPE drums and
provided to authorize vendor. Hence, no risk of
contamination is envisaged.
7.2 From discharge of sewage or other
effluents to water or the land
(expected mode and place of
discharge)
No The waste water after treatment will be fully
reused for flushing of toilets and green area
development.
No waste water will be discharge outside the
project area.
7.3 By deposition of pollutants emitted No Air emissions will be generated due to increased
Proposed Group Housing Project
At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))
M/s ATS Homes Pvt. Ltd. 17 JM EnviroNet Pvt. Ltd.
to air into the land or into water vehicular movement and occasional use of D.G.
set for which effective measures will be taken like
sufficient greenbelt development and use of low
sulphur diesel in D.G. sets etc. So, there would
not be any deposition of pollutants emitted to
air, land or water.
7.4 From any other sources No There will be no other sources which can
contaminate land & water resources.
7.5 Is there a risk of long term build up
of pollutants in the environment
from these sources?
No Likelihood of such an event is not foreseen till
now in the area and suitable measures will be
adopt to control and reduce emission, so that
there will be no such risk in the coming future.
8.8.8.8. Risk of accidents during construction or operation of the Project, which could affect human Risk of accidents during construction or operation of the Project, which could affect human Risk of accidents during construction or operation of the Project, which could affect human Risk of accidents during construction or operation of the Project, which could affect human
health or the environmenthealth or the environmenthealth or the environmenthealth or the environment
S. S. S. S.
No.No.No.No.
Information/Checklist confirmationInformation/Checklist confirmationInformation/Checklist confirmationInformation/Checklist confirmation Yes/ Yes/ Yes/ Yes/
NoNoNoNo
Details thereof (with approxDetails thereof (with approxDetails thereof (with approxDetails thereof (with approximate quantities/imate quantities/imate quantities/imate quantities/
rates, wherever possible) with source of rates, wherever possible) with source of rates, wherever possible) with source of rates, wherever possible) with source of
information datainformation datainformation datainformation data
8.1 From explosions, spillages, fires etc
from storage, handling, use or
production of hazardous substances
No The entire building shall be designed as per
N.B.C. guidelines of India pertaining to fire
hazards. They will apply good construction
safety practices at the project. All precautionary
measures will be adopted and use of protective
footwear and helmet will be mandatory.
However, to meet out the minor incidences and
accidents first aid measures at site will be
provided.
Fire safety measures include Fire extinguishers,
Water tanks, Yard hydrants, hose reels,
automatic detection system, illuminated Exit
signs, sprinkler system and compartmentalisation
etc.
There are very little chances of explosion,
spillages and fire. There will be provision of
personal protective equipment as required
under the health & safety norms for the
workers during the time of construction
activities. Over and above awareness and
Proposed Group Housing Project
At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))
M/s ATS Homes Pvt. Ltd. 18 JM EnviroNet Pvt. Ltd.
training will be provided to all the supervisors
dealing with construction workers during the
construction activity.
As such no hazardous product or substances will
be stored within project site and also no
industrial or process activity is involved in the
project hence chances of chemical hazards and
accidents are minimal. However, there will be
suitable fire fighting measures will be provided
to reduce chances of fire-accidents.
8.2 From any other causes No No other causes are involved except the
mentioned above.
8.3 Could the project be affected by
natural disasters causing
environmental damage (e.g. Floods,
earthquakes, landslides, cloudburst
etc)?
No No cases are reported so far and chances are
minimal. The site is selected carefully keeping in
view all the factors to avoid any environmental
damage due to natural disasters. The project
area falls in Zone-IV of seismic Zoning Map of
India. The seismic factors have been
appropriately incorporated in the civil designs
for the proposed Construction Project
9.9.9.9. Factors wFactors wFactors wFactors which should be considered (such as consequential development) which could lead to hich should be considered (such as consequential development) which could lead to hich should be considered (such as consequential development) which could lead to hich should be considered (such as consequential development) which could lead to
environmental effects or the potential for cumulative impacts with other existing or planned environmental effects or the potential for cumulative impacts with other existing or planned environmental effects or the potential for cumulative impacts with other existing or planned environmental effects or the potential for cumulative impacts with other existing or planned
activities in the localityactivities in the localityactivities in the localityactivities in the locality
S. S. S. S.
No.No.No.No.
Information /Information /Information /Information / Checklist confirmChecklist confirmChecklist confirmChecklist confirmaaaationtiontiontion Yes/ Yes/ Yes/ Yes/
NoNoNoNo
DeDeDeDetails thetails thetails thetails therererereof of of of ((((wwwwiiiitttth apph apph apph apprrrroximate qoximate qoximate qoximate quauauauantitiesntitiesntitiesntities ////
rrrraaaates, tes, tes, tes, wwwwhehehehererererevvvver possible)er possible)er possible)er possible) wwwwiiiithththth source source source source oooof f f f
information dinformation dinformation dinformation daaaatatatata
9.1 Lead to development of supporting
utilities, ancillary development or
development stimulated by the
project which could have impact on
the environment e.g.
Yes The project activity will have positive impact on
the ancillary infrastructure like roads, markets,
conventional shops, public health amenities, and
conveyance facilities in the area.
•Supporting infrastructure (roads,
power supply, waste or waste water
treatment, etc.)
Yes The project will have positive impact on the
ancillary infrastructure like roads, markets,
public health, amenities, conveyance facilities
etc. in the area.
• housing development No Not applicable
• extractive industries No Not applicable
• supply industries No Not applicable
Proposed Group Housing Project
At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))
M/s ATS Homes Pvt. Ltd. 19 JM EnviroNet Pvt. Ltd.
• other No Not applicable
9.2 Lead to after-use of the site, which
could have an impact on the
environment
No Not applicable
9.3 Set a precedent for later developments Yes Negligible impact is envisaged on air, noise and
aesthetic parameters due to the proposed
project. A beautiful after use scenario, which is
likely to increase aesthetics of the area &
greenery, May set precedence for subsequent
entrepreneurs who venture such projects.
9.4 Have cumulative effects due to
proximity to other existing or
planned projects with similar effects
No The proposed project is a Group Housing
Project. A better-planned and executed project
has to yield better result individually.
(III)(III)(III)(III) EnvEnvEnvEnvironmental Sensitivityironmental Sensitivityironmental Sensitivityironmental Sensitivity
S. S. S. S.
No.No.No.No.
AreasAreasAreasAreas Name/ IdentityName/ IdentityName/ IdentityName/ Identity Aerial distance (within 15 km.) Aerial distance (within 15 km.) Aerial distance (within 15 km.) Aerial distance (within 15 km.)
Proposed project location boundaryProposed project location boundaryProposed project location boundaryProposed project location boundary
1 Areas protected under international
conventions, national or local
legislation for their ecological,
landscape, cultural or other related
value
Tillpat Forest
Range
Approx. 12.0 km in WNW direction
from the Project Site.
2 Areas which are important or sensitive
for ecological reasons - Wetlands,
watercourses or other water bodies,
coastal zone, biospheres, mountains,
forests
Hinden River
Yamuna River
Approx. 2.0 km in SE direction from
the Project Site.
Approx. 3.0 km in SW direction from
the Project Site.
3 Areas used by protected, important or
sensitive species of flora or fauna for
breeding, nesting, foraging, resting,
over wintering, migration
None
Not located within 15 km of the
project location.
4 Inland, coastal, marine or
underground waters
None Not located within 15 km of the
project location.
5 State, National boundaries Delhi State
border
Approx. 16.0 km in NW direction
from project site.
6 Routes or facilities used by the public
for access to recreation or other
tourist, pilgrim areas
Noida
Expressway
Yamuna
Expressway)
Approx. at 3.0 km in North direction
from project site.
Approx. 2.0 km in West direction from
the Project Site.
Proposed Group Housing Project
At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))
M/s ATS Homes Pvt. Ltd. 20 JM EnviroNet Pvt. Ltd.
7 Defence installations None Not located within 15.0 km of the
proposed project location.
8 Densely populated or built-up area Noida city Located at a distance of approx. 11.0
K.M in NNW direction from the
project site.
9 Areas occupied by sensitive man-made
land uses (hospitals, schools, places of
worship, community facilities)
Yes There are number of major hospitals,
schools etc. There are numerous
places of worship and community
within the project influenced area.
10 Areas containing important, high
quality or scarce resources (Ground
water resources, surface resources,
forestry, agriculture, fisheries, tourism,
minerals)
Yes Ground-water resources in the study
area are depleting at very fast rate and
are declared as scarce resource.
11 Areas already subjected to pollution
or environmental damage. (Those
where existing legal environmental
standards are exceeded)
No No Environmental damage reported
from the area so far. All parameters
of Air, Water, and Noise etc. will be
maintained within permissible limits
specified by SPCB / CPCB with
proper mitigation measures.
12 Areas susceptible to natural hazard
which could cause the project to
present Environmental problems
(Earthquakes, subsidence, landslides,
erosion, flooding or extreme or
adverse climatic conditions)
None The area under study falls in Zone-
IV, according to the Indian Standard
Seismic Zoning Map. Suitable seismic
coefficients in horizontal and
vertical directions respectively, will
be adopted while designing the
structures to mitigate the seismic
impacts.
There are no possibilities of the
proposed project site getting flooded
as per records available.
IV. Proposed Terms of Reference:IV. Proposed Terms of Reference:IV. Proposed Terms of Reference:IV. Proposed Terms of Reference:
PROJECT / LAND USEPROJECT / LAND USEPROJECT / LAND USEPROJECT / LAND USE
� A site plan showing the project site and its surroundings with physical features and
topographical details, such as land use, contours and drainage pattern, along with
photographs of the site from all four sides, should be included in the background
information.
� List the kind of activities that are proposed or likely to come up in the complex
� Examine in detail the proposed site with reference to impact on infrastructure covering
water supply, storm water drainage, sewerage, power, etc., and the disposal of
Proposed Group Housing Project
At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))
M/s ATS Homes Pvt. Ltd. 21 JM EnviroNet Pvt. Ltd.
treated/raw wastes from the complex on land/water body and into sewerage system.
� Examine existing education and health facilities, police and other services and include
adequate provisions in the proposal
BASELINE ENVIRONMENTAL STUDIESBASELINE ENVIRONMENTAL STUDIESBASELINE ENVIRONMENTAL STUDIESBASELINE ENVIRONMENTAL STUDIES
� To examine the baseline status of the project site and its surrounding area, one season
baseline monitoring will be done for the project and results will be incorporated in
EIA/EMP Report to be prepared for the project.
� Study the existing flora and fauna of the area and the impact of the project on them
will be conducted.
� Adequate rainwater harvesting proposals to recharge ground water, which should be
made with due safeguards for ground water quality. Maximize recycling of water and
utilization of rainwater
ENVIRONMENT:ENVIRONMENT:ENVIRONMENT:ENVIRONMENT:
� Make provision of tree plantation as a measure for mitigation of dust and noise in the
proposed complex. Landscape plan, tree plantation and open spaces along with
species proposed in the complex, may be described.
� Make adequate provision for wastewater treatment facilities.
� Assess soil erosion in view of the soil characteristics, topography and rainfall pattern.
� Describe solid waste management and their disposal scheme.
� Arrangements for hazardous waste (Used / spent oil from DG sets) management
through registered recyclers.
� Solid wastes will be segregated into organic and inorganic components. Both the
biodegradable & non-biodegradable/ recyclable wastes will be sold to authorized
vendors for recycling of non-biodegradable wastes and disposal of biodegradable
waste. Dewatered / dried sludge from STP will be used as manure in horticulture.
� Air dispersion modelling to access the impact of project on Ambient Air Quality.
� Examine separately the details for construction and operation phases both for
Environmental Management Plan and Environmental Monitoring Plan.
� Provisions made for safety in storage of materials, products and wastes may be
described.
� Disaster management facility shall be provided.
ENERGY CONSERVATION:ENERGY CONSERVATION:ENERGY CONSERVATION:ENERGY CONSERVATION:
� Application of renewable energy/alternate energy, such as solar energy may be
described including solar water heating in the guidelines for entrepreneurs.
� Use of local building materials should be emphasized during construction.
� Provide for conservation of resources, energy efficiency and use of renewable sources
Proposed Group Housing Project
At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))
M/s ATS Homes Pvt. Ltd. 22 JM EnviroNet Pvt. Ltd.
of energy in the light of ECBC code
TRAFFIC MTRAFFIC MTRAFFIC MTRAFFIC MANAGEMENT:ANAGEMENT:ANAGEMENT:ANAGEMENT:
� Traffic management plan including parking areas may be described.
� Adequate parking provision and parking space should be provided.
� Provide adequate approach road for entry and exit to project site.
PROJECT SPECIFIC ADDITIONAL SUGGESTIONSPROJECT SPECIFIC ADDITIONAL SUGGESTIONSPROJECT SPECIFIC ADDITIONAL SUGGESTIONSPROJECT SPECIFIC ADDITIONAL SUGGESTIONS
PROJECTPROJECTPROJECTPROJECT DETAILS:DETAILS:DETAILS:DETAILS:
� Specify clearly as to whether there is displacement of population due to this project.
� Submit contour plan, Master plan, Services layout, car parking plan, traffic circulation
plan elevation section plan, perspective view plan and area demarcation plan.
� Dual plumbing system shall be proposed for recycling of the treated water and submit
the hydraulic design of STP with dimension of each component.
� Valid license along-with collaboration agreement and revenue record of the area of
the project.
� Submit detailed Solid waste management plan.
� Water recharging system (water harvesting) will provide as per standard guidelines.
WELFARE & SAFETY MEASURES FOR LABOURSWELFARE & SAFETY MEASURES FOR LABOURSWELFARE & SAFETY MEASURES FOR LABOURSWELFARE & SAFETY MEASURES FOR LABOURS
� Submit Health & Safety plan as per Noida construction workers rules.
� Signed copy of Company’s Environment and Safety Policy
� Submit social activities if any, are to be under-taken.
� Emergency preparedness plan.
ELECTRICAL HAZARDS:ELECTRICAL HAZARDS:ELECTRICAL HAZARDS:ELECTRICAL HAZARDS:
� Submit the detailed design about lightening arrestors along with electrical safety plan
along-with line diagram indicating standards and codes.
� Submit the electricity load and backup calculation of D.G sets
� Submit detailed earth pits plan with design details
� Submit the Noise and vibration reduction plan.
FIRE AND SAFETYFIRE AND SAFETYFIRE AND SAFETYFIRE AND SAFETY::::
� Submit fire fighting plan along –with diagram indicating standards & codes.
� Fire fighting & fire rescue plan.
ENERGY ENERGY ENERGY ENERGY CONSERVATION:CONSERVATION:CONSERVATION:CONSERVATION:
� Submit energy conservation measures giving the energy saved by using non
conventional.
� Sources of energy along –with calculation regarding the energy saved.
� Submit study of simulation of incidence of sunlight to assess the orientation building.
Proposed Group Housing Project
At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))
M/s ATS Homes Pvt. Ltd. 23 JM EnviroNet Pvt. Ltd.
� List of the energy saving construction material to be used for construction activities.
AFFIDAVIT /UNDER TAKING REGARDING CONSTRUCTION ACTIVITIES OF THE AFFIDAVIT /UNDER TAKING REGARDING CONSTRUCTION ACTIVITIES OF THE AFFIDAVIT /UNDER TAKING REGARDING CONSTRUCTION ACTIVITIES OF THE AFFIDAVIT /UNDER TAKING REGARDING CONSTRUCTION ACTIVITIES OF THE
PROJECT:PROJECT:PROJECT:PROJECT:
� An undertaking will be submitted regarding the no construction activities of the
project
An undertaking for the assurance of the supply of the water from Municipal Authority
and supply from hired private water tankers (from safe zone An agreement for supply
of water through tankers from safe zone /MOU for the utilization of STP treated water
during construction phase will be submitted.
� An undertaking will be submitted that we will use low sulphur diesel/ HSD (0.25%)
for their Gen sets.
FOLLOWING CLEARANCE WILL BE OBTAINED FOR THE PROFOLLOWING CLEARANCE WILL BE OBTAINED FOR THE PROFOLLOWING CLEARANCE WILL BE OBTAINED FOR THE PROFOLLOWING CLEARANCE WILL BE OBTAINED FOR THE PROJECT FROM RESPECTIVE JECT FROM RESPECTIVE JECT FROM RESPECTIVE JECT FROM RESPECTIVE
AUTHORITIES FOR THE PROJECT:AUTHORITIES FOR THE PROJECT:AUTHORITIES FOR THE PROJECT:AUTHORITIES FOR THE PROJECT:
� Permission from the Airport Authority regarding the height of the building.
Proposed Group Housing Project
At Plot No. – SC-01/01, Sector – 152, Noida, Uttar Pradesh (Form Form Form Form –––– 1111))))
M/s ATS Homes Pvt. Ltd. 24 JM EnviroNet Pvt. Ltd.
“I hereby given undertaking that the data and information given in the application and
enclosures are true to the best of my knowledge and belief and I am aware that if any part of
the data and information submitted is found to be false or misleading at any stage, the project
will be rejected and clearance give, if any to the project will be revoked at our risk and cost.”
Date:
Place:
Signature of the applicant
Mr. S. J. Raza
Authorized Signatory
M/s M/s M/s M/s ATS HomesATS HomesATS HomesATS Homes Pvt. Ltd.Pvt. Ltd.Pvt. Ltd.Pvt. Ltd.
711/92, Deepali, Nehru Place, New Delhi-
110019
NOTE:NOTE:NOTE:NOTE:
1. The projects involving clearance under Coastal Regulation Zone Notification, 1991 shall
submit with the application a C.R.Z map duly demarcated by one of the authorized agencies,
showing the project activities, w.r.t. C.R.Z (at the stage of TOR) and the recommendations of
the State Coastal Zone Management Authority (at the stage of EC). Simultaneous action shall
also be taken to obtain the requisite clearance under the provisions of the C.R.Z Notification,
1991 for the activities to be located in the CRZ.
2. The projects to be located within 10 km of the National Parks, Sanctuaries, Biosphere
Reserves, Migratory Corridors of Wild Animals, the project proponent shall submit the map
duly authenticated by Chief Wildlife Warden showing these features vis-a-vis the project
location and the recommendations or comments of the Chief Wildlife Warden "thereon (at
the stage of EC)."
3. All correspondence with the Ministry of Environment & Forests including submission "of
application for TOR/Environmental Clearance, subsequent clarifications, as may be required
from time to time, participation in the EAC Meeting on behalf of the project proponent shall
be made by the authorized signatory only. The authorized signatory should also submit a
document in support of his claim of being an authorized signatory for the specific project".