View
235
Download
0
Category
Preview:
Citation preview
Railroad Commission of Texas
Monthly Production Report (PR)Deborah Davis
Why file production reports (PR’s) ?• Statewide Rules (SWR)
• SWR 27
• SWR 54
• SWR 58 (b)
• Required to be filed On or Before the last working day of the month, following the month covered by the report
PR Information• Oil/Condensate Production is reported in
Barrels (BBLS) (Including any test oil and condensate)
• Casinghead Gas (CSGHD) and
• Gas Well Gas (GWG) Production is reported in thousand cubic feet
(MCF)(Including test gas)
• Disposition
• Stock on hand
• All volumes need to be in whole numbers
When to file PR reports
• Transfer Stock Only
• Reclassifications
• Gas Wells
• Oil Wells
PR Filing Options
1. Hard Copy
2. Electronic Data Interchange (EDI)
3. On-Line
HARD COPY
RRC Drilling1701 D. Road
Good TX 78766
0 0 0 0 0 0 0 1
0 1 2 0 1 0
REMARKS Hard WorkMike Bike Mike Bike
002-356-9912 2-14-12
Hard Copy Processing Issues Not on approved format
NO SIGNATURE – signatures are required on ALL pages
Only Blue or Black Ink accepted
Column 2 – Lease Type
Font too small – with the exception of column 1
Incorrect District/RRC Identifier and Operator Number
Month/Year
Field Name not on each page
Breaking of RRC identifier from one page to another
CODESOil / Condensate (Column 8) :
• Code 3 & 6
• Code 4
• Code 5 – Form H-8
• Code 8
• Code 71
• Code 72
• Code 73
• Code 74
• Code 75
CODES continued…
Casinghead/Gas Well Gas (Column 12) :
Code 4 – Vented or Flared
Questions: Terry Edwards (512) 463-6785
Pending Drilling or American Petroleum Institue (API) Number
Identifying Information needs to be correct
Be Consistent with Drilling Permit Number or API Number
Oil Wells
RRC On-Line System Methods available to submit vs. paper:
1. EDI – Electronic Data Interchange
2. CD
3. PR On-Line System
PR On-Line System What Can Be Viewed On-line:
Current
Lates and Corrected 1993 – Current Month
Pending (when lease number has not been assigned)
Using Drilling Permit or API Number
PR On-Line System continued…
Filing: Read Website Requirements for Filing Electronically
www.rrc.state.tx.us/electronicfiling/edifilingrequirements.pdf
Submit your Security Administrator Designation (SAD) form
Receive your email from P-5 with User ID and instructions
Administrator User ID cannot file on the PR system
Administrator gives employees filing rights
EDI – Electronic Data Interchange Upload File
File Upload Location: https://webapps.rrc.state.tx.us/security/login PR User ID
RRC On-Line System
PR EDI Upload
Browse and then verify
Check verified files
SUBMIT
Update Successful
EMAIL: pr_edi_upload@rrc.state.tx.us
EDI – Electronic Data Interchange Upload File
PR EDI Upload Email Message: File Name
Upload Time 2005-05-11 11:27:43.351
Agent ID
Submitter ID
Agent Phone #
Number of records received
Number of records processed successfully
Number of records dropped
EDI – Electronic Data Interchange Upload File
Reminders:
Cannot combine Current and Lates and Corrected in same file
Receive an Update Successful Message
E-Mail Confirmation
On Line System Reminders Logging On: Use PR User ID, NOT Administrator ID
ONLY click on Multiple Commingling if your lease is on more than ONE permit
DO NOT use same RRC identifier on different lines for addition codes
Review the MONTH/YEAR and verify lease information
Confirm and Submit
View printable format
PR QueryReminders:
Logged into RRC On-Line system
NOT Logged into RRC On-Line system
Log on to the RRC website www.rrc.state.tx.us
On the home page
click on Data
Online Research (Queries)
From the Online Research Queries page scroll down to the Statewide Production Data Query System (PDQ) and click on
Launch Application
Log on to the RRC website www.rrc.state.tx.us
Log on to the RRC website www.rrc.state.tx.us
Log on to the RRC website www.rrc.state.tx.us
Log on to the RRC website www.rrc.state.tx.us
Log on to the RRC website www.rrc.state.tx.us
Log on to the RRC website www.rrc.state.tx.us
Outstanding DiscrepanciesFix Discrepancy
Use this queue to view delinquent reports.
Correct discrepancies
QUICK P-17 Form TIPSP-17 PERMIT FEE TOTAL IS $375
P-17 Permit Fee $150
As of 05/01/12, Surcharge Fee $225
Turbine and Coriolis Exception Meters Fee is $375 Per meter
FEE EXCEPTION
CANCELLATION
QUESTIONS ??
Contact Information
P-17
Darlene Williams (512) 463-6873
darlene.williams@rrc.state.tx.us
Production
General Phone Line (512) 463-6726ProductionReporting-Info@rrc.state.tx.us
Recommended