REINDEER RENEWABLE ENERGY PROGRAM @Hydro One Remotes

Preview:

Citation preview

TWO TYPES OF RENEWABLE PROJECTS AVAILABLE

• Production of renewable energy “nets” or offsetsbuilding energy use

• Customer/owner enjoys lower energy bills• Currently a typical net metering installation is on a Standard ‘A’ Community-owned building (school, water treatment plant, etc.) as thesebuildings offer the highest rates

As of May 1, 2016, over 250 kWh:– Air Access – 97.69 cents/kWh– Road/Rail – 67.56 cents/kW

• Projects must be sized according to the facility’sload and may not exceed 50% of annual energyconsumption

Stand-alone

• Payments are made for kWh injected intoRemotes’ system

• kWh rate is based on 3 year historical averagecost of fuel per kWh (avoided cost of fuel)specific to that community

• 2016 rates range from 24.8 cents/kWh to 70.7 cents/kWh with most communities in the 40 cent range

• Customer/owner gets paid quarterly

@Hydro One Remotes

Must use a renewable resource

Must have First Nationparticipation/support (if in a First Nationcommunity)

Project must be sizedaccording to the electricalneeds of the communityand to the kW size ofexisting generation in the community

FOR MORE INFORMATION CONTACT REMOTES CUSTOMER SERVICE AT 1-888-825-8707 OR RemotesCustomerService@HydroOne.com