Results on Test Cryostats
and
The AGATA Asym. Triple:
Status of Cryostat Production
AGATA Detector Group Meeting, IKP Cologne March 16th, 2006
AGATA Detector Group Meeting, IKP Cologne March 16th, 2006
Assembly of Cap A003 intoAssembly of Cap A003 into
Test Cryostat 10032 Test Cryostat 10032
Assembly of Cap A003 intoAssembly of Cap A003 into
Test Cryostat 10032 Test Cryostat 10032
Cross Talk Test Results byCross Talk Test Results by
Nigel and/or BartNigel and/or Bart
AGATA Detector Group Meeting, IKP Cologne March 16th, 2006
Assembly of Cap A002 intoAssembly of Cap A002 into
Test Cryostat 10033Test Cryostat 10033
Assembly of Cap A002 intoAssembly of Cap A002 into
Test Cryostat 10033Test Cryostat 10033
2,061,801,961,852,091,95
Only row E;Only row E;
Core 2,15 keVCore 2,15 keV
FWHM @ 1,3 MeVFWHM @ 1,3 MeV
AGATA Detector Group Meeting, IKP Cologne March 16th, 2006
HistoryHistory
Meeting Cologne Oct. 20th, 2005:
Discussions and Determining of Measurements
of the End Cape.g.
Clearance Cryostat – Cryostat: 0,50 mm
Incl. Tolerance of End Cap: 0.15 mm
Wall Thickness of End Cap: 1.00 mm
Distance End Cap – Capsule Wall: optimized
Wall Thickness Capsule: 0,80 mm
Clearance between Capsules: 0.50 mm
Distance Capsule, internal: 0.40 mm
Tolerance Capsule Dimensions: 0.10 mm
AGATA Detector Group Meeting, IKP Cologne March 16th, 2006
November and December 2005
Design of an End Cap Geometry on Basis of these Numbers
Workshop IKP Cologne
with Catia CAD Programm
AGATA Detector Group Meeting, IKP Cologne March 16th, 2006
ViewerViewer
CTT Design Phase
From January 2006
To End of February 2006
AGATA Detector Group Meeting, IKP Cologne March 16th, 2006
Some Details ...Some Details ...
AGATA Detector Group Meeting, IKP Cologne March 16th, 2006
AGATA Detector Group Meeting, IKP Cologne March 16th, 2006
HV Modules and Control HV Modules and Control
To be discussed:To be discussed:
- final size of modulesfinal size of modules
- assembly to cryostatassembly to cryostat
- cablingcabling
- power supply power supply
- PT 100 read outPT 100 read out
- LN2 read out electronicLN2 read out electronic
AGATA Detector Group Meeting, IKP Cologne March 16th, 2006
Status of FabricationStatus of Fabrication
Cold preamp blocks ~ 60 pcs in productionCold preamp blocks ~ 60 pcs in production
Warm preamps availableWarm preamps available
Internal cabling in productionInternal cabling in production
Feedthrough plates in productionFeedthrough plates in production
Dewars as shown orderedDewars as shown ordered
Cryostat hardware as shownCryostat hardware as shown
Prepared as good as possible Prepared as good as possible
to get ready in timeto get ready in time
AGATA Detector Group Meeting, IKP Cologne March 16th, 2006
Time ScheduleTime Schedule
Calendar 2006Jan Feb March April May June July Aug Sept Oct Nov Dez
DesignDesign
ApprovalApproval
Design Finish and FabricationDesign Finish and Fabrication
Fabrication of Independent PartsFabrication of Independent Parts
Final AssemblyFinal Assembly
Capsule AssemblyCapsule Assembly
AGATA Detector Group Meeting, IKP Cologne March 16th, 2006
Topics of CTT‘sTopics of CTT‘s
Concern:Concern:
approval of the asym. cryostat design asapapproval of the asym. cryostat design asap
Final fixing of the HV control units and their Final fixing of the HV control units and their power supplypower supply
Discussions about frame mounting and cable Discussions about frame mounting and cable channels, cable guiding etc.channels, cable guiding etc.
approval of the asym. cryostat design asapapproval of the asym. cryostat design asap
Final fixing of the HV control units and their Final fixing of the HV control units and their power supplypower supply
Discussions about frame mounting and cable Discussions about frame mounting and cable channels, cable guiding etc.channels, cable guiding etc.