RICH upgrade simulation: updates 11-2-2015 RICH upgrade-software meeting 1 S.Easo

Preview:

Citation preview

1

RICH upgrade simulation: updates

11-2-2015

RICH upgrade-software meeting

S.Easo

2

Updates from LHCb tracking , PID algorithm

RICH 1 Optics : Fine tuning spherical mirror ROC

Plans : Evolutions of MAPMT array configurations

Outline

3

LHCb Tracking

• 2012-13 (TDR studies): No ‘upgrade tracking’ available for RICH studies Used current LHCb tracking geometry + different versions of RICH upgrade geometry Not a perfect , but a practical solution at the time.

2014 : ‘Upgrade tracking’ became available, so started using it for RICH. 2014 Feb : Upgrade/current tracking comparisons in terms of PID. Track quality parameters were not available. So assumed all long tracks are ‘good tracks’ as a first step.

2015 : Track ghost probability parameter available , Used this to filter the upgrade tracks used for RICH.

This talk: PID with some of the above tracking setups. They all use same PYTHIA (generator) and beam configurations . So expect only minor variations of PID performance among them.

• RICH performance depends on the tracks input to RICH.

4

Simulation Configuration

Gauss v47r0p1, Boole 29r3, Brunel v47r4

Tracking : Recent version as in Brunel v47r4 for upgrade/current LHCb

Luminosity : Lumi20 ( 2X 1034 cm2s-1 ) , no spillover

Bs ff events

RICH Optics:

• ROC 3800 mm, 3600 mm, 3650 mm• With/without photon plane shift of 100 mm.• Current standard setup in software: ROC 3800mm, no plane shift• RICH2 : large+ small pmts

PID Tuning: Current/Old tuning. Current tuning is default.

Several PID combinations: Different Tracking/PID Tuning/RICH Optics. Only a few combinations used in this presentation

5

Red: Upgrade LHCb Tracking + Tracks selected with ghost probability cut Blue: Upgrade LHCb Tracking + All tracks Black: Current LHCb Tracking + Tracks selected with ghost probability cut

PID from Upgrade LHCb trackingimproved compared to that fromCurrent LHCb tracking

RICH1: standard setup

6

RICH1 optics“out of focus”

Red: Upgrade LHCb Tracking + Tracks selected with ghost probability cut Cyan: Upgrade LHCb Tracking + All tracks Black: Current LHCb Tracking + Tracks selected with ghost probability cut

RICH1 optics:ROC= 3600 mm

PID from Upgrade LHCb tracking improved compared to that from Current LHCb tracking , for all optics

7

Upgrade tracking,ghost probability< 0.3

Red: RICH1 ROC 3800 mmBlack: RICH1 ROC 3800 mm, photon plane shift 100 mmBlue: RICH1 ROC 3600mm , photon plane shift 100 mmCyan : RICH1 ROC 3650 mm, photon plane shift 100 mm

Effect from photonplane shift recovered bychange in ROC

upgrade PID plots wth ‘recent best configuration’

8

Current LHCb tracking

Red: RICH1 ROC 3800 mmBlack: RICH1 ROC 3800 mm, photon plane shift 100 mmBlue: RICH1 ROC 3600mm , photon plane shift 100 mm

Upgrade tracking, : All tracks

• Effect from photon plane shift recovered by change in ROC• This conclusion on optics obtained , independent of the tracking used.

Effects from PID tuning

• Some tuning done in 2013• Now re-visiting with current versions• For illustration use tracks with 7.5 < P < 100 GeV/c on this page. (backup slide with full P range).

Blue: Current tuningMagenta: Old Tuning

All Plots:RICH1 ROC=3800 mm using upgrade tracking

Top Plot: Standard setup, no shift in photon plane

Bottom plot: Photon plane shift=100 mm

Tuning gave a small improvement inPID performance in both plots

10

Optics and PID tuning : Upgrade LHCb Tracking

Upgrade LHCb Tracking,Current PID Tuning

Upgrade LHCb TrackingOld PID Tuning

• Effect from photon plane shift recovered by change in ROC• This conclusion on optics obtained , is independent of the PID tuning used

with Upgrade LHCb tracking

Red: RICH1 ROC 3800 mmBlack: RICH1 ROC 3800 mm, photon plane shift 100 mmBlue: RICH1 ROC 3600mm , photon plane shift 100 mm

11

Optics and PID tuning : Current LHCb Tracking

Current LHCb Tracking,Current PID Tuning

Current LHCb TrackingOld PID Tuning

• Effect from photon plane shift recovered by change in ROC• This conclusion on optics obtained , is independent of the PID tuning used

with Current LHCb tracking

Red: RICH1 ROC 3800 mmBlack: RICH1 ROC 3800 mm, photon plane shift 100 mmBlue: RICH1 ROC 3600mm , photon plane shift 100 mm

12

Plans

• Once the exact ROC is decided, freeze the optics geometry for a while.

• Long term: Rebuild the PMT arrays in software, using the Elementary Cells.

• Further tuning of the PID algorithm

13

SUMMARY

PID performance verified with different tracking and PID tuning combinations.

The usage of ghost probability gives a minor improvement in PID performance

All the PID performances obtained are consistent with each other and are as expected.

14

BACKUP SLIDES

15

PID vs Momentum

Upgrade tracking, ghost probability <0.3RICH standard setup (ROC 3800 mm)

Current LHCb tracking, ghost probability <0.3RICH standard setup (ROC 3800 mm)

16

PID vs Momentum

Upgrade tracking, All tracksRICH standard setup (ROC 3800 mm)

Upgrade tracking, All tracksRICH standard setup (ROC 3800 mm)Old PID tuning

17

Red: Upgrade LHCb Tracking + Tracks selected with ghost probability cut Cyan: Upgrade LHCb Tracking + All tracks Black: Current LHCb Tracking + Tracks selected with ghost probability cut

RICH1 optics“out of focus”

PID from Upgrade LHCb trackingimproved over that fromCurrent LHCb tracking

18

Red: Upgrade LHCb Tracking + Tracks selected with ghost probability cut Cyan: Upgrade LHCb Tracking + All tracks Black: Current LHCb Tracking + Tracks selected with ghost probability cut

PID from Upgrade LHCb trackingimproved over that fromCurrent LHCb tracking

RICH1 optics:ROC= 3600 mm

19

Red: RICH1 ROC 3800 mmBlack: RICH1 ROC 3800 mm, photon plane shift 100 mmBlue: RICH1 ROC 3600mm , photon plane shift 100 mm

PID has sametrend as in upgrade tracking

Current LHCbtracking

20

Red: RICH1 ROC 3800 mmBlack: RICH1 ROC 3800 mm, photon plane shift 100 mmBlue: RICH1 ROC 3600mm , photon plane shift 100 mmCyan : RICH1 ROC 3650 mm, photon plane shift 100 mm

Upgrade tracking,All tracks

Effects from PID tuning

• Some tuning done in 2013• Now re-visiting with current versions• For illustration use tracks with 1.5 < P < 100 GeV/c on this page.

Blue: Current tuningMagenta: Old Tuning

All Plots:RICH1 ROC=3800 mmTop Plot: No shift in photon plane

Bottom plot: Photon plane shift=100 mm

Tuning improved the PID in general,apart from very low momentum tracksbelow 7.5 GeV/c. So a minor retuning forthis in the future.

Black: Current LHCb trackingGreen/Blue: Upgrade LHCb tracking

Blue: Upgrade tracking + RICH2 ‘all small’ PMTsRed: Upgrade tracking + RICH2 mixed PMTs

Red : used as ‘reference plot’ in Dec 2014.

Recapitulation

Recommended