TÜV SÜD AG
Superstructure references
Safety assessment of the superstructure, Energy, Signaling
Telecomunication of the Metro Line L12 in Mexico
Customer/Project
Task
Effort
Independent expert judgement for approval by authority
Total: 10 experts
2 Superstructure
Description Safety assessment superstructure, Energy, Signaling, Telecomunication of the Metro
Line L12 in Mexico
Costumer: PMDF, Mexico
Duration: 2009 – still in work
/ Safety Assessment
TÜV SÜD AG
Superstructure references
Safety Assessment of the entire Railway System Line Trento-Male-
Marilleva, Italy
Customer/Project
Task
Effort
Independent expert judgement
for approval by authority
Total: 15 experts
2 Superstructure
Description Safety Assessment Line Trento-Malè-Marilleva, gage 1000 mt
Customer: Trentino trasporti S.p.A., Trento, Italy
Duration: 2010 – still in work
/ Safety Assessment
TÜV SÜD AG
Superstructure references
Safety assessment of the understructure, superstructure, bridges, tunnel, electrification and
related interfaces for the HSL between Ankara and Istanbul, Turkey Customer/Project
Task Independent expert judgement for
approval by authority
Description Safety Assessment of the understructure, superstructure, bridges, tunnel, electrification
and related interfaces ( for example: rolling stock/ superstructure, electrification/
supertsructure etc.)
Customer: TCDD, Turkey
Homologation in Turkey
Duration: 2007 – 2010
/ Safety Assessment
TÜV SÜD AG
Superstructure references
Safety Audit for the AL Mashaaer Al Mugaddassah – Southern Line,
Saudi Arabien
Customer/Project
Task
Effort
Safety audit for the Al Mashaaer Al Mugaddassah
– Southern Line
Total 8 Expert
Superstructure 1 Expert
Description Some days before the start of operation for the period 1 (Operation during Hajj) of the
Al Mashaaer Al Mugaddassah – Southern Line, TÜV Süd Rail delivered a statement on
the safety situation of the line
Costumer: MOMRA, Kingdom of Saudi Arabia
Duration: 2010
/ Safety Assessment
TÜV SÜD AG
Superstructure references
Safety assessment of the superstructure for a renewal of a
railway track between Meran and Malles, Italy
Customer/Project
Task
Effort
Independent expert judgement for
approval by authority
Total: over 20 experts
2 senior experts involved over 3 years
Description Safety Assessment of the superstructure
Customer: Italian Governament, Italy
Homologation in Italy
Duration: 2002 – 2005
/ Safety Assessment
TÜV SÜD AG
Superstructure references
SBB: Analysis about the correlation between Track defects and
rolling stock forces, Switzerland
Customer/Project
Task Evaluation in order to define the costs related
to the track maintenens
Description Analysis about the correlation between Track defects and rolling stock forces
Customer: Schweitzerische Bundesbahnen SBB, Bern (Switzerland)
Duration: 2011
Effort 2 Experts
/ Consulting
TÜV SÜD AG
Superstructure references
SBB: Catalogue of Requirements for the Track Inspection Vehicle of
the Swiss Federal Railway, Switzerland
Customer/Project
Task Both general requirements as correct positioning, tests on
repeatability and reproducibility or documentation of
changes on the vehicle and specific requirements as the
accuracy of any measurement have been defined. All
requirements are based on national or international
normative regulations or on “best practice” in other
countries as Germany, Austria and France.
Description A detailed catalogue defining requirements for the track inspection vehicle was issued.
The catalogue is for SBB-internal use
Customer: Swiss Federal Railway SBB, Bern (Switzerland)
Duration: 3 Month
Effort 2 Experts
Üb
erh
öh
un
g
40 mm
40 mm
D1 D2
D3 D4
/ Consulting
TÜV SÜD AG
Superstructure references
Health and Safety executive
London Piccadilly line, Great Britain
Customer/Project
Task
Effort
Independent expert judgement for
approval by authority
2 senior experts
Description Derailment investigation
Customer: H&S executive, London
/ Consulting
TÜV SÜD AG
Superstructure references
Evaluation of track stability with Y-steel sleepers, Italy
Customer/Project
Task
Effort
FE-Simulation
Definition of Measurement on the track to control
the correspondence with the reality
2 senior experts
Description Evaluation of track stability
Customer: Thyssen Krupp, Germany
Homologation in Italy
/ Consulting
TÜV SÜD AG
Superstructure references
Elektro Thermit Germany, Assessment of Thermit Transition Welds Customer/Project
Task
Effort
Independent expert supervision for
homologation according to the RFI TCAR SF
AR 07 005 B and the EN 14730-1
2 experts
Description According to the RFI TCAR SF AR 07 005 B and the EN 14730-1 TÜV SÜD Rail
performed the necessary testing for the certification and the homologation of the
Transition Welds (Rail profiles: 60E1/50E5; 60E1/46E4; 50E5/46E4) in Italy. This
assessment includes a lot of laboratory testing as static bending, hardness test, etc.
Customer: Elektro Thermit Halle (Germany)
Duration: 2011 on going
/ Track components
TÜV SÜD AG
Superstructure references
Voestalpine Hytronics Austria, Independent Safety Assessment for
the Hydrostar High Speed Line in Korea
Customer/Project
Task
Effort
Independent Safety Assessment
4 experts
Description Independent Safety Assessment for the improvement of the Hydrostar High Speed
Line in Korea
Customer: Voestalpine Hytronics Austria
Duration: 2011
/ Track components
TÜV SÜD AG
Superstructure references
Yapiray Railway Construction, Conformity of Afyon sleeper
production to EN 13230-1 and EN 13230-2, Turkey
Customer/Project
Task
Effort
Conformity assessment and TSI
Certification
2 experts
Description A conformity assessment according to EN 13230-1 and EN 13230-2 for the concrete
sleeper production plant in Afyon was performed. Furthermore EC Certifications
according to TSI Infrastructure (2008/217/EC) have been issued.
TSI certification of the sleeper B70 (Afyon factory) acc. To Modul H1
Customer: Yapiray Railway Construction Systems Industry and Trade Inc., Konya
(Turkey)
Duration: 2010
/ Track components
TÜV SÜD AG
Superstructure references
China Railway Construction Corporation, Turkey Customer/Project
Task
Effort
EN 13674-1 Conformity
Acceptance ot 10% ot the
Production
2 experts
Description Checking the rail production in accordance to the EN 13674-1: Jan. 2008 and
acceptance of the rails produced for CRCC by Lucchini, Italy
/ Track components
TÜV SÜD AG
Superstructure references
Protem , Arcelor Mittal Poland Customer/Project
Task
Effort
EN 13674-1 Conformity
2 experts
Description Checking the rail production in accordance to the EN 13674-1: Jan. 2008
Company: Protem Ltd. A.T.B. Is Merkenzi G Block 182, Mercunkay Ankara, Turkey
Duration: 2010
/ Track components
TÜV SÜD AG
Superstructure references
Voestalpine Donawitz Austria, Qualification tests to EN 13674-1:2008 Customer/Project
Task
Effort
Qualification tests
2 experts
Description EC Conformity according to EN 13674-1:2008 chapter 8 Qualification tests for the rail
60E1 R260 and R350HT
Customer: Voestalpine Leoben-Donawitz (Austria)
Duration: 2011
/ Track components
TÜV SÜD AG
Superstructure references
Voestalpine BWG Germany, Qualification Tests for Taiwan Customer/Project
Task
Effort
Qualification tests
for turnouts and
crossings
2 experts
Description Qualification tests for turnouts and
crossings for Taiwan according to customer
requirements was performed by TÜV Süd
Rail
Customer: Voestalpine BWG GmbH&CoKG
Duration: 2010 - 2011
/ Track components
TÜV SÜD AG
Superstructure references
VAE Austria, Homologation of the welding process for Mn crossings
in according to EN 14587-1 and the RFI TCAR SF AR 06 010 B
Customer/Project
Task
Effort
Testing and expert report
2 experts
Description Homologation of the welding process for Mn crossings in accordance to the EN 14587-
1 and the RFI TCAR SF AR 06 010 B of the Italian Railway (RFI)
Customer: VAE Eisenbahnsysteme GmbH Zeltweg (Austria)
Duration: 2010
/ Track components
TÜV SÜD AG
Superstructure references
China Railway Shanhaiguan Bridge Group Co. Ltd. China Customer/Project
Task
Effort
Conformity assessment and
Certification
2 experts
Description EC Certification according to TSI Infrastructure (2008/217/EG) of the single turnout R
190/9 for 60E1 rail profile produced by CRSBG in China was provided.
Module B and D have been performed
Customer: China Railway Shanhaiguan Bridge group co ltd China
Duration: 2010
/ Track components
TÜV SÜD AG
Superstructure references
Voestalpine BWG Germany, EC Certification (TSI) Customer/Project
Task
Effort
EC Certification according to TSI
INS Module H1
2 experts
Description EC Certification according to TSI INS (2008/217/EG) Module H1 for four different
turnout-geometries was performed by TÜV SÜD Rail.
Customer: Voestalpine BWG GmbH&CoKG, Butzbach, Germany
Duration: 2010, ongoing
/ Track components
TÜV SÜD AG
Superstructure references
Elektro Thermit Germany, Assessment of thermit welding Customer/Project
Task
Effort
Independent expert supervision for
homologation according to EN 14730-1
2 experts
Description According to EN 14730-1 TÜV SÜD Rail performed the necessary testing for the
certification and the homologation of the rail 60 E 1, steel grade 200 and 260 gap 25
and 50 in Italy. This assessment includes a lot of laboratory testing as static bending,
hardness test, etc.
Costumer: Elektro Thermit Halle (Germany)
Duration: 2011 on going
/ Track components
TÜV SÜD AG
Superstructure references
Sersa Berlin Germany, Approval according EN 14587-2:2009 Customer/Project
Task
Effort
Approval according EN
2 experts
Description Approval according EN 14587-2:2009 for Flash butt welding of rails by mobile welding
machines Serstar 3 + 4 + 5.
Customer: Sersa SWT Sersa Welding, Berlin (Germany)
Duration: 2010 - 2011
/ Track components
TÜV SÜD AG
Superstructure references
Thermit Italia s.r.l., Italy, Assessment of thermit welding Customer/Project
Task
Effort
Independent expert supervision for
homologation according to EN 14730-1
2 experts
Description According to EN 14730-1 TÜV SÜD Rail performed the necessary testing for the
certification and the homologation in Italy. This assessment includes a lot of laboratory
testing as static bending, dynamic shaking, hardness test, etc.
Customer: Thermit Italia, Rho – Milano, Italy
Duration: 2009 - 2010
/ Track components
TÜV SÜD AG
Superstructure references
Ferrotranviaria Bari, Italy Light rail track
Customer/Project
Task
Effort
Static and dynamic tests
Independent expert judgement for
approval by authority
2 senior experts
Description Evaluation of the behaviour of a slab platform on
a bridge
Customer: Ferrotramviaria Bari, Italy
Homologation in Italy
4150 m
5130 m
Load application
/ Track components
TÜV SÜD AG
Superstructure references
Teco, Promofer, Gleis Sekurität, Rail care: track barriers, Italy and
Germany
Customer/Project
Task
Effort
Evaluation of the safety
Independent expert judgement for approval by authority
2 senior experts
Description Evaluation of the stability of the track barriers
Manufacturers: Teco(Italy), Promofer (Italy), Gleis Sekurität ( Germany),
Rail care ( Holland)
Homologation in Italy and Germany
/ Track components
TÜV SÜD AG
Superstructure references
Customer, Country Project Task
ÖBB,
Austria
Plausibility check of the technical
planes of two steel-concrete
railway bridges in accordance to
the TSI-Standards
Comparison between Önorm
B4003 (Austrian Standard) and
TSI-Standards
TÜV Italia, Italy Meran
(Süd Tirol)
Approval of the
infrastructure, railway
vehicle GTW, signalling
equipment
Promofer, Italy Test for the homologation
of a track protection
barrier
Expert report
All over Assessment
Testing
TÜV SÜD AG
Superstructure references
Customer, Country Project Task
Oevermann, Germany Test of the rail fastenings
of ARA Hamburg-
Langefelde and evaluation
ot the draining concept
Margaritelli, Italy
Tests for the homologation
of the concrete of the
concrete-sleeper RFI260 in
accordance with the
EN13230-1/2 and the
Italian Standards
Thyssen Krupp,
Germany
Calculation of a track
lateral distortion in a curve
with small radius and y-
steel sleepers
Testing and expert
report
Testing and expert
report
Expert report
TÜV SÜD AG
Superstructure references
Customer, Country Project Task
Margaritelli, Italy Tests for the homologation
of the concrete – sleeper
RFI240 in accordance with
the EN13230-1/2 and the
Italian Standards
Margaritelli, Italy
Tests for the homologation
of the concrete – sleeper
RFI 230 in accordance with
the EN13230-1/2 and the
Italian Standards
Margaritelli, Italy
Tests for the homologation of
the concrete – turnout sleeper
in accordance with the
EN13230-1/2 and the Italian
Standards
Testing and expert
report
Testing and expert
report
Testing and expert
report
TÜV SÜD AG
Superstructure references
Customer, Country Project Task
Thermit italia
Italy
Tests for the homologation
of a steel girder sleeper
(RFI 240) in accordance to
the Italian Standards RFI
TCAR SP AR 03 001 A
Thermit italia
Italy
Tests for the homologation
of a steel girder sleeper
(RFI 260) in accordance to
the Italian Standards RFI
TCAR SP AR 03 001 A
Ferrotramviaria
Italy
Test for the homologation
of a platform (for a
ballastless track) for the
underground in Bari, Italy
Testing and expert
report
Testing and expert
report
Testing and expert
report
TÜV SÜD AG
Superstructure references
Customer, Country Project Task
Expert report
Report for the derailment
on the London
underground „Piccadilly
line“
Test for the homologation of
a track protection barrier
TÜV NEL
(Health and Safety
Executive, London);
Great Britain (London)
Teco,
Italy
Tests for the
homologation of a steel
girder sleeper (RFI 260)
in accordance to the
Italian Standards RFI
TCAR SP AR 03 001 A
Tenconi, Switzerland Testing and expert
report
Testing and expert
report
TÜV SÜD AG
Superstructure references
Customer, Country Project Task
Elpa,
Slovenia
Safety assessment and
report, for the
homologation in Slovenia
as well as in Europe
Safety assessment and
product qualification for the
homologation of the E60
(R260) rails in accordance to
the EN standards as well as
to the Italian Standards
Voest Alpine Schienen,
Austria
Safety
Assessment
Safety
assessment and
expert report
Voest Alpine Schienen,
Austria
Safety assessment and
product qualification for the
homologation of the E60
(HSH) rails in accordance to
the EN standards as well as
to the Italian Standards
Safety
Assessment
TÜV SÜD AG
Superstructure references
Customer, Country Project Task
Schwihag,
Switzerland
TSI (HSL) Certification
Modul D
Gleis Sekurität
Germany
Certification
Certification
Test for the italian
homologation of a track
protection barrier
TECO,
Italy
Test for the german
homologation of a track
protection barrier
Testing and expert
report
TÜV SÜD AG
Superstructure references
Customer, Country Project Task
Care Rail,
Holland
Promofer
Italy
Test for the italian and
German homologation of a
track protection barrier
VAE
Austria
Test for the italian
homologation
(Switch blade R260)
Test for the italian
homologation of a track
protection barrier
Testing and expert
report
Testing and expert
report
Testing and expert
report
TÜV SÜD AG
Superstructure references
Customer, Country Project Task
VAE
Austria
VAE
Austria
Test for the italian
homologation
(Steel sleepers)
Test for the italian
homologation
(Switch blade HSH)
Testing and expert
report
Testing and expert
report
VAE
Austria
Test for the italian
homologation
(Switch blade)
Testing and expert
report
TÜV SÜD AG
Superstructure references
Customer, Country Project Task
TCDD
Turkey
Approval of the
understructure,
superstructure,
electrification an related
interfaces- Part1
Safety assessment
TCDD
Turkey
Approval of the
understructure,
superstructure,
electrification an related
interfaces- Part 2
Safety assessment
TCDD
Turkey
Conformity check in
accordance to the UIC 860
of a rail production in the
kardemir factory, Turkey
Conformity
assessment
TÜV SÜD AG
Superstructure references
Customer, Country Project Task
Yapi Merkezi Conformity
assessment
Design review in acc. to
EN 13230 of the
sleeper B70 for the HSL
Ankara-Konya
Design review and
conformity
assessment
Voestalpine
Schienen
repeated inspection of
the test “tensile stress
in the rail foot” in acc. to
EN 13674-1
Conformity
assessment
Conformity check in
accordance to the EN
13674-1 of a rail
production in the Lucchini
factory (Italy) for the HSL
Ankara-Konya
Yapi Merkezi
TÜV SÜD AG
Superstructure references
Project Task
Eurailscout Conformity
assessment
Conformity check in
accordance to the EN
13848-2 of track geometry
vehicle
Voestalpine Schiene
Austria
Certification
Certification in accordance
to the TSI INS
(2008/217/EG) Module H1
Vossloh-Cogifer
Turkey
Conformity
assessment
Conformity check in
accordance to the EN
13232-1 to 7 and part 9
of High speed line
turnouts
Customer, Country
TÜV SÜD AG
Superstructure references
Customer, Country Project Task
VAE BWG
Germany
Conformity
assessment
Conformity check in
accordance to the TSI INS
(2008/217/EG) of High
speed line turnouts
VAE
Austria
Conformity
assessment
Homologation of the
welding process in
accordance to the ÖN
14587-1 and the RFI
TCAR SF AR 06 010 B
Kardemir
Turkey
Conformity
assessment
Conformity check of the
60E1 Rail production in
accordance to the EN
13674-1
TÜV SÜD AG
Superstructure references
Customer, Country Project Task
TCDD
Turkey
Safety assessment Safety evaluation of the
conventional lines between
Ankara – Esenkent and
Eskisehir- Hasanbey
UZKA
Turkey
Safety assessment Safety assessment of the
superstructure of the HSL
Hasanbey-Eskisehir- Inönu
Protem
Turkey
Safety assessment of the
superstructure of the HSL
Esenkent - Sincan Safety assessment
TÜV SÜD AG
Superstructure references
Customer, Country Project Task
TCDD
Turkey
Safety assessment Extension of the contract
for the Safety assessment
of the HSL between
Esenkent and Eskisehir
Mermec
Turkey
Conformity
assessment
Evaluation of the
conformity to the EN
13848-2 of the Mermec
track geometry car
Mermec
Turkey
Laboratory inspection of
the monitoring system that
will be installed on the
TCDD-CAF rolling stock
Conformity
assessment
TÜV SÜD AG
Superstructure references
Customer, Country Project Task
SZA
Austria
Safety assessment
and expert report
Assessment of the
infrastructure in
accordance to the §19a
(1,2) EisbG and the ÖN B
4920-3
LGÖ
Austria
Testing and expert
report
Testing the track gauge in
accordance to the §19a
(1,2) EisbG and the ÖN B
4920-3
LGÖ
Austria
Assessment of the
infrastructure in
accordance to the §19a
(1,2) EisbG and the ÖN B
4920-3
Safety assessment
and expert report
TÜV SÜD AG
Superstructure references
Customer, Country Project Task
Thermit
Italiana
Testing and expert
report
Homologation of the
welding process in
accordance to the EN
14730-1 and the RFI
TCAR SF AR 07 005 B
VAE
Austria
Testing and expert
report
Homologation of the
welding process for Mn
crossings in accordance to
the EN 14587-1 and the
RFI TCAR SF AR 06 010 B
Mermec
Turkey
Training for the evaluation
of track geometry, reaction
measurement, track
maintenance and track
alignment
Training
TÜV SÜD AG
Superstructure references
Customer, Country Project Task
Conformity
assessment
Assessment of turnout
geometries
Thales Saudi Arabia
TSI certification of the
sleeper B70 ( Afyon
factory) acc. to Modul
H1
Yapiray
Turkey
Conformity
assessment and
Certification
Yapiray
Turkey
EN 13230 conformity
of the B70 sleeper
production in Afyon
Conformity
assessment and
Certification
TÜV SÜD AG
Superstructure references
Customer, Country Project Task
DB AG ( EBC)
Germany
Safety assessment
and expert report
VAE BWG
Germany
Conformity
assessment and
Certification
Conformity check in
accordance to the TSI INS
(2008/217/EG) Module H1
of High speed line turnouts
VAE BWG
Germany
Qualification Test for the
turnout for Taiwan HSL Testing and expert
report
Safety assessment of the
HSL Munich - Ingolstadt
TÜV SÜD AG
Superstructure references
Customer, Country Project Task
Expert report
Technical specification for
interoperability relating to the
infrastructure sub-system of the
trans-European high-speed rail
system
China Railway
Shanhaiguan Bridge
Group Co.
China
Conformity check in
accordance to the TSI
INS (2008/217/EG)
Module B and D of High
speed line turnouts
DB Netz AG -
Eisenbahn Cert
Bonn
Conformity
assessment and
Certification
TCDD
Turkey
Safety assessment of the
signaling, energy, civil
works, earthworks of the
HSL Esenkent – Sincan
and Hasanbey- Eskisehir
Safety assessment
and expert report
TÜV SÜD AG
Superstructure references
Customer, Country Project Task
Conformity assessment
EC Certification of High
Speed Line Munich
Ingolstadt
EC Certifiaction of High
Speed Line Leipzig
Dresden
Conformity assessment
Conformity assessment
EC Certification of High
Speed Line Frankfurt Oder DB AG (EBC)
Germany
DB AG (EBC)
Germany
DB AG (EBC)
Germany
TÜV SÜD AG
Superstructure references
Customer, Country Project Task
Conformity assessment
EC Certification of High
Speed Line Köln
EC Certifiaction of High
Speed Line Rhein Neckar
Conformity assessment
Conformity assessment
EC Certification of train
stations and platforms of
Simbach, Rosenheim,
Banteln, Hanau-Nantenbach
DB AG (EBC)
Germany
DB AG (EBC)
Germany
DB AG (EBC)
Germany
TÜV SÜD AG
Superstructure references
Customer, Country Project Task
Qualification Tests
EC Conformity according to
EN 13674-1:2008 chapter 8
Qualification Tests for the rail
60E1 R260 and R350HT
EC Certification
according to TSI INS
(2008/217/EG) Module D
for Bainit rails by TÜV
SÜD Rail.
VAS Donawitz
(Austria)
Conformity assessments
and certification
Conformity
assessments
EC Certification according to
TSI INS (2008/217/EG)
Modul H1 for different rails
and railgrades performed by
TÜV SÜD Rail
VAS Donawitz
(Austria)
VAS Donawitz
(Austria)
TÜV SÜD AG
Superstructure references
EC Verification of 2 platforms
and Parts of the
train station Kreiensen
Conformity assessment
Customer, Country Project Task
Testing and expert report
Conformity check in
accordance to the TSI INS
(2008/217/EG) Modul H1 of
High speed line turnouts
VAE BWG
Germany
TSI Consulting IVV Berlin (Germany)
DB AG (EBC)
Germany
Consulting implementation
of TSI INS Conventional
TÜV SÜD AG
Superstructure references
EC Verification of a railway bridge
„EÜ Osthofen“
Conformity assessment
Customer, Country Project Task
Conformity Assessment
EC Verification of a switch area
and a bridge over the river
Elbe
DB AG (EBC)
Germany
EC Verification of 6 railway
bridges between Passau and
Obertraublingen
DB AG (EBC)
Germany
DB AG (EBC)
Germany
Conformity Assessment
TÜV SÜD AG
Superstructure references
Assessment of the train-station
and platform Twistringen
According TSI PRM
(2008/164/EC)
EC-Certification
Customer, Country Project Task
Conformity assessment
EC Certification in accordance
to TSI INS CR (2011/275/EU)-
application of Module CH
according to TSI Modules
(2010/713/EU)
DB AG (EBC)
Germany
Voestalpine Schiene
Austria
EC-Certification
DB AG (EBC)
Germany
EC Verification of station “Bf.
Banteln”, execution design
phase
TÜV SÜD AG
Superstructure references
EC Certification of two
platforms in the Station of
Northeim according to TSI PRM
EC-Certification
Customer, Country Project Task
EC-Certification
EC Certification of 4 new built
railway bridges in the area
of Greifswald/Germany
According to TSI INS HS
DB AG (EBC)
Germany
DB AG (EBC)
Germany
EC-Certification
DB Projektbau GmbH
Germany
EC Cerification of two
platforms in the station of
Emden according to TSI PRM
TÜV SÜD AG
Superstructure references
EC Certification TSI HS INS
2008/217/EU and TSI CR INS
2011/275/EU
EC-Certification
Customer, Country Project Task
Consulting
TSI Certification of Turnout
according to module H1 (TSI
HS INS 2008/217/EU)
Voestalpine Hytronics
GmbH, Austria
CRSBG China
EC-Certification
Yapiray Insaat Sistemieri
San. Tic. A.S.
Consulting according to EN
13232-4 by the acceptance of
the turnout Type EW 60 E1-
500-1:12 for HSL Inönü
Köseköy
TÜV SÜD AG
Superstructure references
EC-Certification
Customer, Country Project Task
Conformity assessment
EC-Certification of approxi-
mately 3 km double track line
between Fulda and
Frankfurt/Main in the area of Bf
Neuhof according to HS INS TSI
DB Projekt Bau
GmbH (EBC) Germany
DB AG (EBC) Germany
EC-Certification Hbf Leipzig
W311-W312-W313 in the
area of Dresden Hbf
according to HS INS TSI
EC-Certification
DB AG (EBC) Germany
EC-Verification of station
“Bf. Kreiensen”, detailed
design phase
TÜV SÜD AG
Superstructure references
Customer, Country Project Task
EC-Certification
DB Projektbau GmbH
(EBC) Germany
Assessment
Conformity assessment
DB AG (EBC)
Germany
EC-Verification of station
“Bf. Meppen”, detailed
design phase
EC-Cerification of
approximately 3 km double
track line in the station area of
Bf Ostkreuz in Berlin/Germany
according to HS INS TSI
Replacement of a 5 l
bladder accumulator with
two 2,8 l diaphragm
accumulators in
HYDROSTAR turnouts
Voestalpine Hytronics
GmbH, Zeltweg, Austria
TÜV SÜD AG
Superstructure references
Customer, Country Project Task
Conformity Assessment and
Certification
Expertise evaluation
Weichenwerk Wörth
GmbH, St. Georgen am
Steinfeld, Austria
SBA, Bozen, Italy
Evaluation track
geometry
CRCC, Ankara, Turkey
Conformity check in
accordance to the TSI INS
(2008/217/EG) Module H1 of
the High speed line, switches
and crossings – Follow up
Audit
Monitoring of the
Acceptance Testing and expert
report
TÜV SÜD AG
Superstructure references
Customer, Country Project Task
Conformity assessment
Conformity assessment
DB Netz AG, Berlin,
Germany
DB RegioNetz GmbH,
Mühldorf, Germany
EC-Verification of station “Hp
Rosenheim-Hochschule”,
execution design phase
BASF SE, Ludwigshafen,
Germany
EC-Verification of “Üst
Rahnsdorf”, detailed design
and execution design phase
Qualified technical
assessment of the execution
planning of the catenary for
the project “KVT3”
Qualified design certification
TÜV SÜD AG
Superstructure references
Customer, Country Project Task
EC-Certification
EC-Certification
DB Projektbau
Duisburg,Germany
DB Projektbau Hannover,
Germany
EC-Certification of two
platforms in the station of Bf
Einbeck-Salzderhelden
according to TSI PRM
DB Projektbau Berlin,
Germany
EC-Certification of about 2 km
of a High Speed Line in the city
area of Köln/Germany
Preperation of the relevant
documentation for EC-
Certification according to TSI
INS HS, Aurachtalbrücke
EC-Certification
TÜV SÜD AG
Superstructure references
Customer, Country Project Task
EC-Certification
EC-Certification
DB Projektbau
Saarbrücken, Germany
DB Projektbau Berlin,
Germany
EC-Certification of about 7
km of a High Speed Line
between Berlin and Dresden
Voestalpine Hytronics
VAH, Zeltweg, Austria
Preperation of the relevant
documentation for EC-
Certification according to TSI
INS CR, EÜ Pfalzl
Report about use of
SPHEROLOCK NG and IE
20120 made by voestalpine
HYTRONICS ltd. at TCDD
Expert report
TÜV SÜD AG
Superstructure references
Customer, Country Project Task
Conformity assessments
and certification, Follow-up
Audit
Expert report
Voestalpine Schienen,
Leoben, Austria
Voestalpine
Weichensysteme vaW
Factory Zeltweg, Austria
Supervision of laboratory
tests
Voestalpine
Weichensysteme, Zeltweg,
Austria
Follow-up Audit: EC
Certification according to TSI
INS (2008/217/EG) Module H1
for different rails and rail
grades performed by TÜV SÜD
Rail
vaW Austria, EN-Conformity and
certification of flash butt welding for
crossings according EN 14587-1 and prEN
14587-3 and homologation of forged rail
transitions in tongue rails according prEN
16273 and RFI TCAR SF AR 06 006 A and
flash butt welding for crossings according
EN 14587-1 and RFI TCAR SF AR 06 010B
EN-Conformity, certification
and homologation
TÜV SÜD AG
Superstructure references
Customer, Country Project Task
Homologation and
certification
Voestalpine
HYTRONICS VAH,
Zeltweg, Austria
Independent Safety
Assessment
Stölting Rail & Service
GmbH, Essen, Germany
ISA of high speed turnouts
from BWG with Hydrostar in
Korea
Homologation of Separations
Conformity assessment
DB Projekt Bau GmbH
(EBC), Germany
EC-Verification of station „HP
Cuxhaven“, execution design
phase
Recommended