SAIC-S-4006

Preview:

DESCRIPTION

SAIC-S-4006

Citation preview

Multipage SAIC Page 1SAUDI ARAMCO ID/PID - 5/18/05 - REV 0 (Standards Cutoff - June 2008)REV 330-Jun-08SAUDI ARAMCO INSPECTION CHECKLISTSAIC NUMBERDATE APPROVEDQR NUMBERLift Station Electrical and Control Receiving, Handling, Storage and preservationSAIC-S-400615-Dec-09PLUMBPROJECT TITLEWBS / BI / JO NUMBERCONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S)EQUIPMENT DESCRIPTIONEQPT CODESYSTEM ID.PLANT NO.

LAYOUT DRAWING NUMBERREV. NO.PURCHASE ORDER NUMBEREC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIMEACTUAL INSPECTION DATE & TIMEQUANTITY INSP.MH's SPENTTRAVEL TIMESAUDI ARAMCO USE ONLYSAUDI ARAMCO TIP NUMBERSAUDI ARAMCO ACTIVITY NUMBERWORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVELCONTRACTOR INSPECTION LEVEL

ITEM No.ACCEPTANCE CRITERIAREFERENCEPASSFAILN/ARE-INSP DATE

AReceivingA1Wet well liquid level sensing devices shall meet the following requirements:(a) The device shall be either sealed, single-pole, float sensors, conductance-actuated electrodes, admittance probes or ultrasonic probes.(b) The sensing devices shall be in a stilling enclosure.SAES-S-010Para 5.3.9.2

A2The enclosure shall be of dead front construction and shall have two doors and two compartments that are separated by a barrier. One compartment shall house the motor starter package and the other shall house the liquid level and alarm controls. SAES-S-010Para 5.3.9.4 a

A3The doors of the enclosure shall overlap to prevent them from being opened with the pump motor disconnect devices in the "ON" position.SAES-S-010Para 5.3.9.4 aA4Motor starters shall be full voltage, nonreversing magnetic, with overload relay protection. The heater coil rating shall be adjustable within 6% of full load motor current.SAES-S-010Para 5.3.9.4 cA5Control transformers equipped with an integral fuse block for secondary protection shall be provided for each starterSAES-S-010Para 5.3.9.4 dA6The pump alternator shall be a motor driven device with three separate Single Pole Double Throw (SPDT) micro-switches that are positioned by cams located on the shaft of the motor.SAES-S-010Para 5.3.9.4 eA7Liquid level controls shall be off/on switch devices that open and close in response to predetermined liquid elevations and that cause the pump(s) to start or stop.SAES-S-010Para 5.3.9.4 fA8A Double Pole Double Throw (DPDT) control circuit power switching plug-in relay shall be provided to enable each motor disconnect device to provide a continuous 120-volt nominal source of power to the alarm system, to the DPDT plug-in alarm "OFF" relay, to the liquid level controls, and to the moisture detection controls for submersible pumpsSAES-S-010Para 5.3.9.4 gA9Submersible pumps shall have probes within the oil reservoir for the purpose of detecting a leakage of the outer seal of the motor. A warning light, a test light, and a test push button shall be provided for each motorSAES-S-010Para 5.3.9.4 hBHandling, Storage and PreservationB1Verify that approved procedures for handling, storage and preservation of Control and Electrical lists all the required inspection schedules for maintaining the quality of electrical / instrumentation componentsSchedule Q Section 5, Att. IV

Multipage SAIC Pages 2,3,4...SAUDI ARAMCO ID/PID - 5/18/05 - REV 0 (Standards Cutoff - June 2008)REV 330-Jun-08SAUDI ARAMCO INSPECTION CHECKLISTSAIC NUMBERDATE APPROVEDQR NUMBERLift Station Electrical and Control Receiving, Handling, Storage and preservationSAIC-S-400615-Dec-09PLUMBPROJECT TITLEWBS / BI / JO NUMBERCONTRACTOR / SUBCONTRACTOR

ITEM No.ACCEPTANCE CRITERIAREFERENCEPASSFAILN/ARE-INSP DATE

REMARKS:

REFERENCE DOCUMENTS:1-SAES-A-104 - Wastewater Treatment, Reuse and Disposal, May 10, 20062-SAES-S-010 -- Sanitary Sewers, 31 December 2002

Contractor / Third-PartySaudi AramcoConstruction Representative* PMT Representative

Name, Initials and Date:Work is Complete and Ready for Inspection:Name, Initials and Date:T&I WitnessedQC Record ReviewedWork Verified

QC InspectorPID RepresentativeName, Initials and Date:Performed InspectionWork / Rework May ProceedName, Initials and Date:T&I WitnessedQC Record ReviewedWork Verified

QC SupervisorProponent and OthersName, Sign and Date: Quality Record Approved:Name, Organization,Initials and Date:T&I WitnessedQC Record ReviewedWork Verified

*Person Responsible for Completion of Quality Work / TestY = YES N = NO F = FAILED