Scitor Tutorial 53:084 Project Design and Management in Civil Engineering Spring Semester 2003

Preview:

Citation preview

Scitor Tutorial

53:084Project Design and Management in Civil

EngineeringSpring Semester 2003

What is Scitor?

Presentation-quality flowcharts Powerful process analysis Simulation capabilities

Flowchart

Simulation

Analysis

Sample Problem

Computer Telephone Help Support Center

Simulate the telephone network Time and cost consumption Effectiveness of resources

Cost and Time Effects

Job Task Eligibility Cost Operation Time

Distribution

Telephone operator Normal $7/hr 30sec or 1min

Tech Support Hard Senior Tech $15/hr 10min 25%

Tech Support Easy Jr. Tech $10/hr 10min 25%

Sales Sales Person $8/hr 15min 50%

Telephone Network System

5 min

30 sec25 %

1 min50 %

30 sec25 %

10 min 15 min10 min75 %

$15/hr $10/hr $8/hr

$7/hr

5 min25 %

Run Simulation Scitor runs simulation

Analysis of Results

Change Variation Modification of input variables Redo the simulation Comparison of results from new input

variable

Questions? Let’s practice Scitor!