View
241
Download
0
Category
Preview:
Citation preview
8/19/2019 Sdp 3g Sr Menara Kwsp
1/40
SITE ID : NWXXXX
SITE NAME :
SITE CONFIGURATION : 1+1+1
FREQ. BAND : 3G
CELCOM (M) BHD
NORTHERN REGION
SITE DESIGN PACKAGE
MENARA KWSP
8/19/2019 Sdp 3g Sr Menara Kwsp
2/40
SITE ID : NWXXXX
SITE NAME : MENARA KWSP
SITE CONFIGURATION : 1+1+1
CELCOM (M) BHD
NORTHERN REGION
Site Information
8/19/2019 Sdp 3g Sr Menara Kwsp
3/40
SITE ID : NWXXXX
SITE NAME : MENARA KWSP
SITE CONFIGURATION : 1+1+1
CELCOM (M) BHD
NORTHERN REGION
RF Design
8/19/2019 Sdp 3g Sr Menara Kwsp
4/40
SITE ID : NWXXXX
SITE NAME : MENARA KWSP
SITE CONFIGURATION : 1+1+1
CELCOM (M) BHD
NORTHERN REGION
Existing 2G Information
8/19/2019 Sdp 3g Sr Menara Kwsp
5/40
SITE ID : NWXXXX
SITE NAME : MENARA KWSP
SITE CONFIGURATION : 1+1+1
CELCOM (M) BHD
NORTHERN REGION
New 3G Information
8/19/2019 Sdp 3g Sr Menara Kwsp
6/40
SITE ID : NWXXXX
SITE NAME : MENARA KWSP
SITE CONFIGURATION : 1+1+1
CELCOM (M) BHD
NORTHERN REGION
Site Picture
8/19/2019 Sdp 3g Sr Menara Kwsp
7/40
SITE ID : NWXXXX
SITE NAME : MENARA KWSP
SITE CONFIGURATION : 1+1+1
CELCOM (M) BHD
NORTHERN REGION
Mobile Checklist / BOQ
8/19/2019 Sdp 3g Sr Menara Kwsp
8/40
SITE ID : NWXXXX
SITE NAME : MENARA KWSP
SITE CONFIGURATION : 1+1+1
NORTHERN REGION
Installation Plan
CELCOM (M) BHD
8/19/2019 Sdp 3g Sr Menara Kwsp
9/40
SITE ID : NWXXXX
SITE NAME : MENARA KWSP
SITE CONFIGURATION : 1+1+1
CELCOM (M) BHD
NORTHERN REGION
Transmission Checklist
8/19/2019 Sdp 3g Sr Menara Kwsp
10/40
SITE ID : NWXXXX
SITE NAME : MENARA KWSP
SITE CONFIGURATION : 1+1+1
NORTHERN REGION
CME BOQ
CELCOM (M) BHD
8/19/2019 Sdp 3g Sr Menara Kwsp
11/40
3G SITE DESIGN PACKAGE
PENANG ISLAND
NORTHERN
NWXXXX
MENARA KWSP
8/19/2019 Sdp 3g Sr Menara Kwsp
12/40
Site Approval
Survey Date : 30 July 2007
Project: Celcom 3G Phase 2, Northern Region, MalaysiaCelcom (M) Bhd.
Site: NWXXXX MENARA KWSP
Prepared by
Name Mohd Nizam Mohd Noor (019-3160900)
Company I-Convergence Sdn Bhd
Verified by
Name
Approved by
Name
Department
Approved by
SDP APPROVAL
Mobile Access Planning, Group Network Date
Date
Date
8/19/2019 Sdp 3g Sr Menara Kwsp
13/40
CELCOM (M) BHD 1 Site Information
NORTHERN REGION
PENANG ISLAND 2 RF Design
3 Existing 2G Information
4 New 3G Information
5 Site Picture
6 Mobile Checklist / BOQ
7 Installation Plan
NWXXXX 8 Transmission Check List
MENARA KWSP 9 CME BOQ
10
8/19/2019 Sdp 3g Sr Menara Kwsp
14/40
Site Informations
Survey Date : 30 July 2007
Project: Celcom 3G Phase 2, Northern Region, MalaysiaCelcom (M) Bhd.
Site: NWXXXX MENARA KWSP
1.0
1.1 Site Location and Access
GPS Position
Latitude: 05 25 27 4
SITE INFORMATIONS
&&
&
2222222222222222222222222222222222222222222222222
2222222222222222222222222222222222222222222222222
β
2
≅
≅
2222222222222222222222222222222222222222222222222
2222222222222222222222222222222222222222222222222
2222222222222222222222222222222222222222222222222 −2
2
2
≅≅
≅
≅
≅
≅
J LN S U LT AN AH M AD S H AH
J LN S U LT AN AH M AD S H AH
J LN S U LT AN AH M AD S H AH
J LN S U LT AN AH M AD S H AH
J LN S U LT AN AH M AD S H AH
J LN S U LT AN AH M AD S H AH
J LN S U LT AN AH M AD S H AH
J LN S U LT AN AH M AD S H AH
J LN S U LT AN AH M AD S H AH
J L N S J L N S J L N S J L N S J L N S J L N S J L N S J L N S J L N S
L R G
C E Y L O N
L R G
C E Y L O N
L R G
C E Y L O N
L R G
C E Y L O N
L R G
C E Y L O N
L R G
C E Y L O N
L R G
C E Y L O N
L R G
C E Y L O N
L R G
C E Y L O N
J LN S E R I B AH AR I
J LN S E R I B AH AR I
J LN S E R I B AH AR I
J LN S E R I B AH AR I
J LN S E R I B AH AR I
J LN S E R I B AH AR I
J LN S E R I B AH AR I
J LN S E R I B AH AR I
J LN S E R I B AH AR I
J L N A R G
Y L L
J L N A R G
Y L L
J L N A R G
Y L L J L N
A R G Y L L
J L N A R G
Y L L J L N
A R G Y L L
J L N A R G
Y L L
J L N A R G
Y L L
J L N A R G
Y L L
J L J L J J L J J L J L J J L
STM
WISMA MCIS
WISMA PENANG GARDENWISMA PAHLAWAN
DUA BLOK PEJABAT GEREJA
KELAB PULAU PINANG
UNIT PENILAIAN & PEPERIKSAAN PULAU PINANG
MAKTAB PERGURUAN SRI PINANGPEJABAT PENDAFTARAN NEGARA
JPM (YAYASAN BUMIPUTRA)
HOTEL ANTARABANGSA
HOTEL KOWLOONHOTEL NEW SAVOY
HOTEL LONDON
HOTEL SING TONG AH
HOTEL GALLANT
HOTEL KONG ENG
HOTEL MINGOOD
HOTEL NAM
STESEN PETROL
SEKOLAH RENDAH REREMPUAN JALAN N
SEKOLAH RENDAH WELLESLY
SEKOLAH RENDAH PEREMPUAN ISLAND
8/19/2019 Sdp 3g Sr Menara Kwsp
15/40
Site Informations
Survey Date : 30 July 2007
Project: Celcom 3G Phase 2, Northern Region, MalaysiaCelcom (M) Bhd.
Site: NWXXXX MENARA KWSP
1.3 Site Details (Existing)
Type of Site:
Roomreno / Outdoor
Height of Building : Office Building (21 storey)
Equipment Location : Roomreno
Cabin Dimension : -
Air Conditioning : 2 units
Cable Ladder : Yes
Lightning Protection : Yes
Type of Structure : Round Pillar
Structure Height : -
Type of terrain : Flat
Access road : Tar
Distance to main road : 10m
Crane needed : No
Site Access Information : This site located at 8th floor, Menara KWSP, Pulau Pinang.
1.4 Contact Information
Celcom : Mizazuddin Bin Muhiyuddin
Telephone No. : 04-3973030 ext 1009
Fax No. : 04-3974040
Mobile No. : 019-5713060
Contractor Name : Mohd Nizam Mohd Noor
8/19/2019 Sdp 3g Sr Menara Kwsp
16/40
Site Name:
Site ID :
Existing 2G Site Name:
Existing 2G Site ID:Co-locate Operator: Cluster No:
Version:
Lat (N-WGS 84- Decimal):
Long (E-WGS 84-Decimal):
BTS room Type: BTS Type:
BTS Configuration:
Transmission Type on site:
Cell Site RF Configuration
Cell ID
An tenn a Heigh t (mid. o f ant )
An tenn a Direc tion (d eg)
Electrical Tilt
Mech. Tilt
Cable Length (m)
Cable Type (inch)
Technical Site Survey Report (Existing Antenna System Locations)
MENARA KWSP Survey Date: 30-Jul-2007
Sector 3
05-25-27.4
100-19-48.1 96
Sector 1
Phase:
Ams l(m):
Sector 2
Structure type Round Pillar
Pillar mounted bracket
Height (m)
Pillar mounted bracket
Mount
Type Pillar mounted bracket
No of Pole/ Tripod
24 44
Round Pillar Round Pillar
0 0 0
7/8" 7/8" 7/8"
0 0 0
24
29.6 29.6 29.6
80° 200° 280°
Ant enna TypeModel Number DBXLH-6565C-VTM DBXLH-6565C-VTM
Beam width (deg) 65 65 65
4+4+4
Roomreno Alcatel Evolium Indoor
DBXLH-6565C-VTM
G2313 Area: Pulau Pinang
N/A
2
NWXXXX Building Height(m): 21 storey building
MENARA KWSP Structure Height(m): N/A
8/19/2019 Sdp 3g Sr Menara Kwsp
17/40
Site Name:
Site ID :
Existing 2G Site Name:
Existing 2G Site ID:
Co-locate Operator: Cluster No:
Version:
Lat (N-WGS 84- Decimal):
Long (E-WGS 84-Decimal):
Node B room Type: Node B Type:
Node B Configuration:
Transmission Type on site:
Cell Site RF Configuration
Antenna Height (mid. of ant )
Antenna Direct ion (deg)
Electrical Tilt
Mech. TiltCable Length (m)
Cable Type (inch)
MHA (Y/N)
05-25-27.4
100-19-48.1
Hotel Regal Malaysia Wisma MAA Part of Jalan Sultan Ahmad Shah Business Area
Comment/ Problem:
Sector 1 :
Road to Padang Kota (Jalan Sultan Ahmad Shah), Business Area, Bungalow houses.
N N N
Existing
Height (m)Mount
Type Existing Existing
No of Pole/ Tripod
Structure type Round Pillar Round Pillar Round Pillar
24 24 24
7/8" 7/8" 7/8"
2 2 2
0 0 0
28.94 28.94 28.94
80° 200° 280°
Existing Dualband
Beam width (deg) 65 65 65 Antenna Type
Model Number Existing Dualband Existing Dualband
Sector 1 Sector 2 Sector 3
1+1+1
N/A
Amsl(m): 96
ROOMRENO Huawei 3812E
Phase: 2
G2313 Area: Pulau Pinang
N/A
NWXXXX Building Height(m): 21 storey building
MENARA KWSP Structure Height(m): -
Technical Site Survey Report (Proposed Antenna Location)
MENARA KWSP Survey Date: 30-Jul-2007
8/19/2019 Sdp 3g Sr Menara Kwsp
18/40
SECTORIAL RF VIEW
Sector 1 80° degree
Sector 2 200° degree
Sector 3 280° degree
NEW SITE RF PHOTO
8/19/2019 Sdp 3g Sr Menara Kwsp
19/40
PANORAMIC VIEW
View at 0°
View at 40°
View at 80°
NEW SITE RF PHOTO
8/19/2019 Sdp 3g Sr Menara Kwsp
20/40
PANORAMIC VIEW
View at 120°
View at 160°
View at 200°
NEW SITE RF PHOTO
8/19/2019 Sdp 3g Sr Menara Kwsp
21/40
PANORAMIC VIEW
View at 240°
View at 280°
View at 320°
NEW SITE RF PHOTO
8/19/2019 Sdp 3g Sr Menara Kwsp
22/40
a
b
c
d
a
a
b
c
√
√
Tripod 6mtr
GI Pipe 2 mtr
Aesthetic Pole
Maximum Load (A)
Maximum Module
CPS Source
Rectifier -48V Data
Equipment Power Source
AC Power Supply Data
Land Cabin
Land Outdoor
Rooftop Cabin
Tower
TNB
3 Phase AC
SBC
Genset
Single Phase AC
Rectifier +24VModel
√ Rectifier -48V
√
Free DC Breaker (32A)
NoYes
Nader
NoYesFree DB Space For Additional Breaker
Free DC Breaker (60A)Free DC Breaker (32A)
√
Current Module
Free DC Breaker (60A)
Current Load (A)
Free DB Space for Additional Breaker
DC Breaker Type
Menara KWSP
Site ID
Site Name
NWXXXX
MENARA KWSP
4
E1 Status
Celcom
Available
3
E1 Type
E1 Owner TM Maxis Digi
MOBILE INFORMATION
Yes √
√ Yes
Plinth
Structure
Fiber Optic
TX INFORMATION
Structure Height
Lease Line
Room Reno√
No
No
√ YesMGB Space Available
MicroWave
Utilise Free
a
Shelter Type
NoFeeder Through Available
meters
Cabin Size
Room Reno Size
Plinth Size
Cabin
Shelter
Maxis
TM
2
√
CME INFORMATION
Power Supply
Space Available
Type Of Structure
Room Reno Rooftop
Roof top Outdoor
Roomreno Outdoor
Guyed Mast
GI Pipe 6mtr
Monopole
Round Pillar
1
Type Of Site
GENERAL INFORMATION
Site Owner
Celcom
Digi
**Not ins tall yet
** Not ins tall yet
8/19/2019 Sdp 3g Sr Menara Kwsp
23/40
1
a
b
a
b
c
d
e
a
2
3
a
b
c Type
d
e
REMARKS: 1. Proposed metal trunking orange (2" X 4") beside existing 2G metal trunking for all cells.
Length = 2600mm (3 units)
2. Proposed new service box beside existing 2G service box for all cells (3 units).3. To use 7/16 to N-type female + L adaptor (male to female) + N-type jumper to 7/16 (Rx jumper)
for all cells (3 sets).
New (mtr)
New (mtr)
New (qty)
Additional Feeder Through (Qty)
Extend Existing(m)
Upgrade CPS System
Upgrade AC System
Cabin
Plinth New
Antenna Mounting New
Change Existing
Extend
Share with 2G antennas (dualband)
Structure
TX ADDITONAL REQUIREMENTS
Refer to Tx BQ
MOBILE INSTALLATION METHODOLOGY
Swap 2G Eqpt. Rearrange EqptEquipmentEquipment Mobilization
Lorry Crane
45 tonne
Day
20 tonne
Special crane
Night
Specific Day
ADDITIONAL REQUIREMENTS FOR 3G IMPLEMENTATION
Cable Ladder (Outdoor/Indoor)
Concrete Beam
No
Crane Requirements
Crane Access
Specific Times
Open Roofing
Manpower
Special Tools/ Requirements
Qty
Specify
Antenna 2G
√New Upgrade DB
Change to X-Pole
Add Module (Qty) Change Breaker (A) 20amp to
32amp
Permit Requirements √ Yes
Change To Triband
Relocate Existing
MGB
Power Supply
CME ADDITONAL REQUIREMENTS
√ TNB Genset
Shelter
Change to Dual Band UMTS/1800
Change to 1800 wideband
8/19/2019 Sdp 3g Sr Menara Kwsp
24/40
Site Requirements
Survey Date : 30 July 2007
Project: Celcom 3G Phase 2, Northern Region, Malaysia
Celcom (M) Bhd.
Site: NWXXXX MENARA KWSP
2.0
2.1 Exiting Equipment
Existing Equipment Type
No Of Cabinet
Configuration
Comments :
2.2 Exi sting A ntenna Data 2G
Make
Height AGL (m)
Gain (dBi)
Antenna Band
Polarization
Comments :
2.3 Feeder Data 2G
Total no. of feeders (pcs)
Type of feeders
Feeder lengths (m) Tx
Rx
TOTAL
Comments :
2.4 Antenna Support Detail
Type of antenna support : building round pillar
EXISTING 2G
1800/UMTS
DBXLH-6565C-VTM
Cell 3
29.6
DBXLH-6565C-VTM
Cell 1
DBXLH-6565C-VTM
Cell 2
29.6
184
92
17.5
29.6
Cell 3 TOTAL
2 6
1800/UMTS
48 48 88
24 24 44
24 24
7/8 "
44 92
7/8 "7/8 "
17.5
1800/UMTS
+ - 45 + - 45+ - 45
17.5
2
Cell 1 Cell 2
2
Alcatel MBI5
1
4+4+4
8/19/2019 Sdp 3g Sr Menara Kwsp
25/40
Site Requirements
Survey Date : 30 July 2007
Project: Celcom 3G Phase 2, Northern Region, Malaysia
Celcom (M) Bhd.
Site: NWXXXX MENARA KWSP
3.0
3.1 Feeder Data
Total no. of feeders (pcs)
Type of feeders
Feeder lengths (m)
Comments :
3.2 CABLING
Cable required
Comments :
3.3 Antenna Support Detail
Type of antenna support : Existing
No. of H-Boom : -
24
24
88 184
Length Needed
9m
TOTAL 4848
TOTAL
7/8" 7/8"
Cell 1
2
Cell 3Cell 2
2 62
7/8"
24
Cable Lug / 35mm
Rx 24 92
44
44
Tx
NEW SITE REQUIREMENTS
8m
DDF to DF Coax / 3C 2.5V Siemen Male 9m
Node B to MGB
92
Cable Cable type / s ize Connec tor t ype / si ze
Node B E1 to DF Coax / 3C 2.5V -
Grounding / 35mm
Node B to Breaker Grounding / 35mm Cable Lug / 35mm 7m
8/19/2019 Sdp 3g Sr Menara Kwsp
26/40
Site Requirements
Survey Date : 30 July 2007
Project: Celcom 3G Phase 2, Northern Region, Malaysia
Celcom (M) Bhd.
Site: NWXXXX MENARA KWSP
3.4 OTHERS
Comments : No additional requirement needed except stated at site audit form.
3.5 POWER SUPPLY SYSTEM
Rectifier
Make Link Model Vout Iout Breaker
Used:
Required:
Used:
Free:
Required:
Free:
-
No
No
No
No
Yes NoLightning Protection
CommentExisting Required
Yes No
BTS Location Room Room
Cable Inlet
AC Ear th ing Busbar Yes
DC Earthing Busbar N/A
MGB Yes
Yes
Cable Ladder
Cabin Size
Not installed yet
Capacity
-
Plinth Size -
-
8/19/2019 Sdp 3g Sr Menara Kwsp
27/40
Existing Site Pictures
Survey Date : 30 July 2007
Si te: NWXXXX MENARA KWSP
Photo 1 : Site View
SITE PICTURES
8/19/2019 Sdp 3g Sr Menara Kwsp
28/40
Existing Site Pictures
Survey Date : 30 July 2007
Si te: NWXXXX MENARA KWSPSITE PICTURES
Photo 2 : Node B and BTS Location
Node BBTS
8/19/2019 Sdp 3g Sr Menara Kwsp
29/40
Existing Site Pictures
Survey Date : 30 July 2007
Si te: NWXXXX MENARA KWSPSITE PICTURES
Photo 4 : Feeder to be connected to dualband antennas
ProposedMetal Trunking
Orange
C1 antenna location
Proposed Antenna Bracket
Proposed
Metal Trunking
Orange
C2 antenna location
Proposed Antenna Bracket
8/19/2019 Sdp 3g Sr Menara Kwsp
30/40
Existing Site Pictures
Survey Date : 30 July 2007
Si te: NWXXXX MENARA KWSPSITE PICTURES
Photo 6 : Feeder to be connected to dualband antennas
Proposed Metal
Trunking
Orange
C3 antenna location
Proposed Antenna Bracket
8/19/2019 Sdp 3g Sr Menara Kwsp
31/40
Existing CME
Survey Date : 30 July 2007
Si te: NWXXXX MENARA KWSP
Photo 1 : Feeder Inlet location
SITE PICTURES
8/19/2019 Sdp 3g Sr Menara Kwsp
32/40
Existing Tx
Survey Date : 30 July 2007
Si te: NWXXXX MENARA KWSP
No Tx equipment installed yet
SITE PICTURES
8/19/2019 Sdp 3g Sr Menara Kwsp
33/40
New Requirement
Survey Date : 30 July 2007
Si te: NWXXXX
.
Photo 1 : Cell 1 Proposed metal trunking 2" X 4" and service box
SITE PICTURES
Metal
trunking orange
Service box
Existing Metal
trunking orange
Existing Metal
trunking orange
8/19/2019 Sdp 3g Sr Menara Kwsp
34/40
New Requirement
Survey Date : 30 July 2007
Si te: NWXXXX
SITE PICTURES
Photo 3 : Cell 3 proposed metal trunking 2" X 4" and service box
Metal
trunking orange
Service box
Existing Metal
trunking orange
8/19/2019 Sdp 3g Sr Menara Kwsp
35/40
BILL OF QUANTITY SITE NWXXXX
NO TYPE ITEMS ART NO. PACKING REQUEST SUPPLY
IRON WORK Fill in your requested item(s)
1 SPECIAL BRACKET SET
2 6m Tripod NA SET
3 6m BOOM N/A PC
4 WALL BRACKET N/A SET
POWER / RF CABLES & ACCESSORIES
1 Power Cable METER
2 METER
3 AC ARMOURED CABLE, 4CORE, 16mm AC.ARM.4C.16mm METER
4 PVC/PVC AC CABLE 5 CORE, BLACK, 10mm 5C/10mm METER
5 CABLE TIE 4" (WHITE) CBL. TIE -W-IND-4" PC
6 CABLE TIE 8" (WHITE) CBL. TIE -W-IND-8" PC
7 CABLE TIE 14" (WHITE) CBL. TIE -W-IND-14" PC
8 CABLE TIE 14" (BLACK) CBL. TIE -W-OUD-14" PC
9 7/8" COAXIAL CABLE EC5-50 METER
10 1/2" COAXIAL CABLE LDF4-50A METER
11 TX JUMPER CABLE (716M - 716M), 2 MTR F4A-PDMDM-2M PC
12 RX JUMPER CABLE (716M - NM), 2 MTR F4A-PNMDM-2M PC
EARTHING SYSTEM
1 COPPER BARE WIRE, 35MM, MULTI STRAND N/A METER
2 ANDREW CONNECTOR EARTHING KIT (INDOOR) 244495 PC
3 ANDREW FEEDER EARTHING KIT (OUTDOOR) SGL5-06B1 PC
CONNECTORS
1 RFS ANGLE ADAPTER N-TYPE (MALE TO FEMALE) 15852401 PC
2 H+S BNC CONN. (JACK FULL), 75 OHM, FOR RG59 21BNC-75-4-4 PC3 RFS 7/16 FEMALE CONNECTOR FOR 7/8" CABLE 15570560 PC
4 H+S N-MALE CONNECTOR FOR 7/8" CABLE 11N-50-23-10 PC
5 H+S N-MALE CONNECTOR FOR 1/2" CABLE 11N-50-12-10 PC
6 H+S TNC-MALE TO BNC FEMALE ADAPTOR 33-TNC-BNC50-1 PC
7 H+S N-MALE TO N-MALE ADAPTOR 32N-50-0-2 PC
8 RFS FEEDER COUPLING (SPLICER) 155 730 60 PC
MISCELLANEOUS ITEMS
1 AC TRUNKING, 2" X 2", ORANGE C/W ACCESS N/A PC
2 METAL CABLE TRAY, 4" X 1", H.D.G., C/W ACCESS N/A PC
3 CABLE LUG 35MM N/A PC
4 CABLE LUG 150MM N/A PC
5 C-CLAMP (C-TYPE) COMPRESSED FOR 35MM N/A PC
6 3M COOL SHRINK N/A PC
7 CABLE GLAND (FEEDER THROUGH) N/A PC
8 3M ELECTRICAL TAPE, SUPER 33+, 3/4 X 66' 6132 PC
9 3M ELECTRICAL PUTTY , SCOTCHFILL, 1 1/2" X 60" 15140 PC
10 FEEDER CLAMP (2 IN 1) N/A PC
MENARA KWSP
8/19/2019 Sdp 3g Sr Menara Kwsp
36/40
A. SITE DETAILS
MENARA KWSP
1 . OWN TRANSMISSION SOLUTION
MICROWAVE VSAT FIBER OPTIC
REMARKS
REMARKS :
2 . LEASED LINE
TM LEASED LINE POI/POP : . 2 E1
3 E1
REMARKS :
C . ADDITIONAL REQUIREMENT FOR TRANSMISSION SOLUTION.
1 . CME
TRM/TOC DC POWER SUPPLY ( Pls specify : )
E1 SHARING ( MAXIS / DIGI) POI/POP : .
SITE B INSTALLED FREEUSED RESERVEDSITE A
SITE NAME
SITE ID
RNC HOME
NODE B TYPE
TSS TRANSMISSION CHECKLIST FOR 3G
B . TRANSMISSION MEDIA FOR NODE-B CONNECTION.
REGION
SURVEY BY
SURVEY DATE
NORTHERN
** 2G Transmission medium equipment not installed yet. Proposed to share with 2G.
ISRIADI .N. NWXXXX
23/07/2007
INDOOR
8/19/2019 Sdp 3g Sr Menara Kwsp
37/40
8/19/2019 Sdp 3g Sr Menara Kwsp
38/40
8/19/2019 Sdp 3g Sr Menara Kwsp
39/40
8/19/2019 Sdp 3g Sr Menara Kwsp
40/40
Recommended