SENARAI SEMAK KEPERLUAN BOMBA DALAM PENYEDIAAN
REKABENTUK
BESERTA APLIKASI JADUAL DI DALAM UBBL 1986
GARIS PANDUAN KEBAKARAN
MENGIKUT KUMPULAN MAKSUD
SENARAI SEMAK KEPERLUAN BOMBA
1JADUAL KE-5
MENGIKUT KETINGGIAN BANGUNAN2
MENGIKUT KELUASAN / ISIPADU BANGUNAN3
MENGIKUT APLIKASI TEKNOLOGI4JADUAL KE-10 - SISTEM PERLINDUNGAN AKTIF
GARIS PANDUAN KEBAKARAN
HITUNGAN BEBAN PENDUDUKAN DAN MUATAN PINTU KELUAR(Calculation of Occupancy Load and Capacity of Exits)
SENARAI SEMAK KEPERLUAN BOMBA
5
JADUAL KE-7
JARAK PERJALANAN MAKSIMUM & HAD JALAN MATI(Maximum Travel Distances & Dead-End)
6
JADUAL KE-7
UKURAN BANGUNAN DAN KOMPARTMEN
JADUAL KE-5
7
GARIS PANDUAN KEBAKARAN
SENARAI SEMAK KEPERLUAN BOMBA
HITUNGAN HAD YANG DIBENARKAN BAGI KAWASAN TAK TERLINDUNG
8
JADUAL KE-6
KEPERLUAN TAPAK - PILI BOMBA (FIRE HYDRANT)9
KATEGORI MENGIKUT KUMPULAN MAKSUD(BY PURPOSE GROUP)
1
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
JADUAL KE-5
LANGKAH – LANGKAH PERMULAAN MENGENAL PASTI KEPERLUAN SISTEM PENCEGAHAN KEBAKARAN
1
• SEMAK JADUAL KE - 5• MENGENAL PASTI KUMPULAN MAKSUD (PURPOSE GROUP)
• UUK 134, 138
2
• SEMAK JADUAL KE -10• SISTEM AKTIF - KEHENDAK BAGI SISTEM PEMADAM API, SISTEM
PENGGERA KEBAKARAN DAN PENCAHAYAAN KECEMASAN
• UUK 225(1), 237 (1)
3
• JADUAL KE - 7• REKEBENTUK PASIF - JARAK PERJALANAN MAXIMUM & HAD
JALAN MATI (TRAVEL DISTANCE & DEAD-END)
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KATEGORI MENGIKUT KUMPULAN MAKSUD
• UUK 134: Tiap bangunan atau petak perlu diklasifikasi sebagai Kumpulan Maksudmengikut penggunaannya berdasarkan Jadual Ke-5
• Sekiranya lebih dari 1 penggunaan, penggunaan utama diambil kira
• UUK 138(c): Bahagian bangunan yang digunakan untuk kumpulan maksud yang berlainan perlu diasingkan secara pemetakan
• Setiap Kumpulan Maksud mempunyai bahaya kebakaran & keperluan menentangkebakaran yang tersendiri
• Bahaya kebakaran (fire hazards) bergantung kepada sifat dan bilangan penghuni. Contoh:• Kumpulan Maksud I, II & III adalah elemen kediaman yang mempunyai
kemudahan untuk tidur kepada penghuni• Kumpulan Maksud IV (Pejabat), penghuni adalah pekerja dan biasa dengan
susunatur bangunan• Kumpulan Maksud VII (Tempat Perhimpunan), bukan penghuni tetap atau biasa
dengan keadaan bangunan.
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KATEGORI MENGIKUT KUMPULAN MAKSUD
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KATEGORI MENGIKUT KUMPULAN MAKSUD – JADUAL KE-5
KUMPULANMAKSUD
KATEGORI JENIS BANGUNAN
I Kediaman Kecil Banglo, semi-D, teres
II Institusional Digunakan untuk pengajaran sahaja: kantin, makmal, perpustakaan, sekolah vokasional, dewan besar.Hospital, klinik, rumah orang tua
III Kediaman Lain Hotel, asrama, apartment, servis apartment, kondominium, rumah kedai
IV Pejabat Pejabat (bukan tempat tinggal)
V Kedai Kedai runcit, restoran, kedai gunting rambut
VI Kilang Kilang, struktur khas seperti kompleks kilang
VII Tempat Perhimpunan Kehadiran orang ramai bagi urusan sosial, rekreasi, pelajaran, perniagaan - Restoran (banquet), auditorium, musium, dewanserbaguna
VIII Storan dan Am Tempat meletak barang, tempat letak kereta, garaj, bangsal, kapal terbang (hanger), airport
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KATEGORI MENGIKUT KUMPULAN MAKSUD
CADANGAN 4 TINGKAT KOMPLEKS PERNIAGAAN DI KUALA PILAH UNTUK TETUAN AZAN
KEDAI BAZAR
KEDAI BAZAR
KEDAI BAZAR
IV -PEJABAT
V -KEDAI
PEJABAT
KUMPULAN MAKSUD
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KATEGORI MENGIKUT KUMPULAN MAKSUD
CADANGAN PEMBANGUNAN BERCAMPUR 15 TINGKAT DENGAN 4 TEMPAT LETAK KERETA BAWAH TANAH DI KUALA LUMPUR UNTUK TETUAN KLCC
IV -PEJABAT
PEJABAT
KUMPULAN MAKSUD
VII – TEMPAT PERHIMPUNAN
TLK
TLK
TLK
TLK
KEDAI
KEDAI
KEDAI
KEDAI
PEJABAT
PEJABAT
PEJABAT
PEJABAT
PEJABAT
PEJABAT
PEJABAT
PEJABAT
RESTORAN
RESTORAN
MEKANIKAL VIII –STORAN DAN AM
V -KEDAI
1
2
3
P1
P2
P3
P4
4
5
6
7
8
9
10
11
12
13
14
15
VIII –STORAN DAN AM
Apakah Kumpulan Maksud Bagi Kolej / Universiti?
SOALAN:
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
(Jawab Soalan Kertas Lampiran)
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
DEWAN SERBAGUNA
BANGLO
SEMI- D
ASRAMA
DEWAN MAKAN
BLOK PENTADBIRAN
BLOK PERPUSTAKAAN
BLOK KULIAH
BLOK BENGKEL
KM : __________________
KUMPULAN MAKSUD (KM):
CADANGAN PEMBINAAN KOLEJ KEMAHIRAN TINGGI MARA
KM : __________________
KM : __________________
KM : __________________
KM : __________________
KM : __________________
KM : __________________
KM : __________________
KM : __________________
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
DEWAN SERBAGUNA
BANGLO
SEMI- D
ASRAMA
DEWAN MAKAN
BLOK PENTADBIRAN
BLOK PERPUSTAKAAN
BLOK KULIAH
BLOK BENGKEL
KM : II(INSTITUSIONAL)
KM : II(INSTITUSIONAL)
KM : II(INSTITUSIONAL)
KM : IV(PEJABAT)
KM : I(KEDIAMAN KECIL)
KM : I(KEDIAMAN KECIL)
KM : III(KEDIAMAN LAIN)
KM : II(INSTITUSIONAL)
KM : II(INSTITUSIONAL)
KUMPULAN MAKSUD (KM):
CADANGAN PEMBINAAN KOLEJ KEMAHIRAN TINGGI MARA
MENGIKUT KETINGGIAN BANGUNAN2
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KATEGORI MENGIKUT KETINGGIAN BANGUNAN
ARAS TERTINGGI < 12m
ARAS TERTINGGI < 18m
ARAS TERTINGGI > 30.5m
ARAS TERTINGGI > 45m
ARAS TERTINGGI > 18.3m
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KATEGORI MENGIKUT KETINGGIAN BANGUNAN
ARAS TERTINGGI < 12m
PERUNTUKAN KEPERLUAN BOMBA:
• UUK 194 – Bangunan yang mempunyai tangga tunggal- tangga tunggal dibenarkan dalam bangunan yang
tingkat tertinggi tidak melebihi 12m.
• UUK 256 – Bangunan yang dikecualikan- Dikecualikan daripada peruntukan pencegahan aktif
& pasif : rumah banglo, berkembar dan teres- Tetapi masih tertakluk kepada peruntukan
-UUK 141: Dinding pengasing-UUK 225: Keperluan pili bomba
ARAS TERTINGGI < 12m
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KATEGORI MENGIKUT KETINGGIAN BANGUNAN
ARAS TERTINGGI < 18m
PERUNTUKAN KEPERLUAN BOMBA:
• UUK 199 – Pengudaraan kepungan tangga bagibangunan yang melebihi 18m
• UUK 144 – Salutan pada dinding luar/ Cladding on external wall
ARAS TERTINGGI < 18m
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KATEGORI MENGIKUT KETINGGIAN BANGUNAN
ARAS TERTINGGI > 18m / 18.3m
PERUNTUKAN KEPERLUAN BOMBA:
• UUK 144 – Salutan pada dinding luar/ Cladding on external wall
• UUK 197 – Ruang terlindung/ Protected lobbies
• UUK 200 – Pengudaraan kepungantangga bagi bangunan yang melebihi18m.
• UUK 229 – Cara akses dan menentangkebakaran dalam bangunan yang tingginya lebih daripada 18.3m
ARAS TERTINGGI > 18m / 18.3m
• UUK 230 – Pemasangandan ujian sistem pancurkering/ Dry-Riser
• UUK 242 – Ruang aksesmenentang kebakaran
• UUK 243 – Lif bomba.
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KATEGORI MENGIKUT KETINGGIAN BANGUNAN
ARAS TERTINGGI > 30m/ 30.5m
PERUNTUKAN KEPERLUAN BOMBA:
• UUK 137 – Lantai dalam bangunanyang melebihi tinggi 30m hendaklah dibina sebagai lantaipetak/ Compartment floor
• UUK 195 – Tangga hendaklahsampai ke paras bumbung
• UUK 231 – Pemasangan dan ujiansistem pancur basah/ Wet riser
ARAS TERTINGGI > 30m/ 30.5m
• UUK 237 – Penggerakebakaran
• UUK 238 – Pusat perintahandan kawalan
• UUK 239 – Sistemkomunikasi suara
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KATEGORI MENGIKUT KETINGGIAN BANGUNAN
ARAS TERTINGGI > 45m
PERUNTUKAN KEPERLUAN BOMBA:
• UUK 197 – Ruang terlindung / Protected lobbies
• UUK 202 – Sistem isitekanan bagi tangga / Pressurized system for staircase
ARAS TERTINGGI > 45m
MENGIKUT KELUASAN/ ISIPADU BANGUNAN3
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KATEGORI MENGIKUT KELUASAN/ ISIPADU BANGUNAN
AKSES PERKAKAS BOMBA
UKK 140Syarat-syarat akses:
• Lebar jalan masuk dua hala tidak kurang 12 meter• Lebar akses perkakas bomba tidak kurang 6 meter• Jarak dari tepi akses kepada bangunan tidak lebih 2 meter• Akses perkakas bomba bersambungan dengan jalan masuk• Radius pusingan tidak kurang 6 meter• Kecerunan tidak kurang daripada 1:12 • Boleh menampung beban 25 tan• Akses jalan mati melebihi 18m panjang
perlu disediakan tempat berpatah balik
Satu jalan atau ruang untuk membolehkan jentera bombadapat menghampiri bangunan dan boleh menampung
keberatan disyaratkan untuk tujuan melawan kebakarandan menyelamatkan nyawa.
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KATEGORI MENGIKUT KELUASAN/ ISIPADU BANGUNAN
AKSES PERKAKAS BOMBA
Isipadu bgn
(meter padu)
Kadar
minimum
perimeter
bangunan
7000 -28000 1/6
28000-56000 1/4
56000-84000 1/2
84000-112000 3/4
11200 keatas Tapak pulau
(island) C
12mC = 1/6 daripada perimeter
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KATEGORI MENGIKUT KELUASAN/ ISIPADU BANGUNAN
AKSES PERKAKAS BOMBA
Isipadu bgn
(meter padu)
Kadar
minimum
perimeter
bangunan
7000 -28000 1/6
28000-56000 1/4
56000-84000 1/2
84000-112000 3/4
11200 keatas Tapak pulau
(island) C
12m
C = 1/6 daripada perimeter
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KATEGORI MENGIKUT KELUASAN/ ISIPADU BANGUNAN
AKSES PERKAKAS BOMBA
Isipadu bgn
(meter padu)
Kadar
minimum
perimeter
bangunan
7000 -28000 1/6
28000-56000 1/4
56000-84000 1/2
84000-112000 3/4
11200 keatas Tapak pulau
(island)
A + C = 1/4 daripada perimeter
C
12m
A
6m
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KATEGORI MENGIKUT KELUASAN/ ISIPADU BANGUNAN
AKSES PERKAKAS BOMBA
Isipadu bgn
(meter padu)
Kadar
minimum
perimeter
bangunan
7000 -28000 1/6
28000-56000 1/4
56000-84000 1/2
84000-112000 3/4
11200 keatas Tapak pulau
(island)
C B
B + C = 1/2 daripada perimeter
A + C = 1/2 daripada perimeter C
A
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KATEGORI MENGIKUT KELUASAN/ ISIPADU BANGUNAN
AKSES PERKAKAS BOMBA
Isipadu bgn
(meter padu)
Kadar
minimum
perimeter
bangunan
7000 -28000 1/6
28000-56000 1/4
56000-84000 1/2
84000-112000 3/4
11200 keatas Tapak pulau
(island)
A + B + C = 3/4 daripada perimeter
B + C + D = 3/4 daripada perimeter
A
B
C
BD
C
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KATEGORI MENGIKUT KELUASAN/ ISIPADU BANGUNAN
AKSES PERKAKAS BOMBA
Isipadu bgn
(meter padu)
Kadar
minimum
perimeter
bangunan
7000 -28000 1/6
28000-56000 1/4
56000-84000 1/2
84000-112000 3/4
11200 keatas Tapak pulau
(island)
D
B
A
C
A + B + C + D = seluruh perimeter
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KATEGORI MENGIKUT KELUASAN/ ISIPADU BANGUNAN
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KATEGORI MENGIKUT KELUASAN/ ISIPADU BANGUNAN
SOALAN: Berapa perimeter akses perkakas bomba yang perlu disediakan?
Tinggi = 9m
Isipadu
Perimeter
Kadar minimum akses bomba
answer next pg
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KATEGORI MENGIKUT KELUASAN/ ISIPADU BANGUNAN
SOALAN: Berapa perimeter akses bomba yang perlu disediakan?
Tinggi = 9m
Isipadu50m x 20m x 9m = 9000 meter padu
Perimeter50m + 20m + 50m + 20 = 140m
Kadar minimum akses bomba1/6 x 140m= 23.33m
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KATEGORI MENGIKUT KELUASAN/ ISIPADU BANGUNAN
JAWAPAN:
Jarak akses disediakan melebihi dari jarak
akses yang diperlukan.
Oleh itu, keperluan akses perkakas bomba
merujuk kepada UKBS 1984 Undang-
Undang Kecil 140 adalah dipatuhi.
SOALAN:23.33m
Ambil kirapusingan jenteraperkakas bomba
JALA
N U
TAM
A
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KATEGORI MENGIKUT KELUASAN/ ISIPADU BANGUNAN
SOALAN:
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KATEGORI MENGIKUT KELUASAN/ ISIPADU BANGUNAN
JAWAPAN:
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KATEGORI MENGIKUT KELUASAN/ ISIPADU BANGUNAN
MENGIKUT APLIKASI TEKNOLOGI4
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
Sistem Perlindungan Aktif: sistem perlindungan kebakaran
dipasang tetap pada bangunan atau premis merangkumi
tiga cara tindakan untuk mengesan dan memberi isyarat,
mengawal dan memadam kebakaran
MENGIKUT APLIKASI TEKNOLOGI – SISTEM PERLINDUNGAN AKTIF
JADUAL KE-10
Sumber utama keperluan
aktif adalah dariJadual Ke-10
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
Jadual Mengenai Kehendak- Kehendak Bagi SistemPemadaman Api, Sistem Penggera Kebakaran Dan Pencahayaan Kecemasan
UUK 225(1), 237(1)
Kod – rujukbahagianbelakang sekaliJadual ke-10
Jenis sistem
Jenisbangunan/ Kumpulan maksud
MENGIKUT APLIKASI TEKNOLOGI – SISTEM PERLINDUNGAN AKTIF
JADUAL KE-10
..\13-pindaan SELANGOR dis 2012.pdf
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KATEGORI MENGIKUT APLIKASI TEKNOLOGI JADUAL KE-10
Nota 2:SistemPemadam Api
Nota 3:SistemPenggeraKebakaran
Nota 4:PencahayaanKebakaran
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KATEGORI MENGIKUT APLIKASI TEKNOLOGI JADUAL KE-10
Nota 2:SistemPemadam Api(Extinguishing System)
A – Semburan Automatik (Automatic Sprinklers)
B – Sistem Sembur Air (Water Spray System)
C – Sistem Sanga Kembangan Tinggi (High Extension Foam System)
D – Sistem Karbon Dioksida (Carbon Dioxide System)
E – Sistem Pemadam Api berhalogen yang diluluskan(Approved Halogenated Extinguishing System)
F- Sistem Pemadam Api Automatik lain (Other Automatic System)
G – Hos Gelung (Hose Reel)
H – Sistem Pili Bomba (Hydrant System)
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KATEGORI MENGIKUT APLIKASI TEKNOLOGI JADUAL KE-10
Nota 3:SistemPenggeraKebakaran(Fire alarms)
1 – Sistem Pengesan Api Automatik (Automatic Fire Detectors Systems)
2 – Sistem Penggera Kebakaran Elektrik Manual (Manual Electrical Fire Alarm System)
3 – Sistem Penggera Penunjuk Kebakaran (Signal Indicator Alarm System)
4 – Sistem Penggera Manual (Manual Alarm System)
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KATEGORI MENGIKUT APLIKASI TEKNOLOGI JADUAL KE-10
Nota 4:PencahayaanKebakaran(Emergency Lighting)
(a) – Unit titik isyarat (Signal points units)
(b) – Bateri Pusat (Central Battery)
(c) – Janakuasa (Generators)
• Pengesanan dan pemadaman api (225)
• Pemadaman api mudah alih (227)
• Pancur kering dan basah (230-232)
• Pemasangan tetap (235)
• Penggera kebakaran (237)
• Pusat pemerintahan dan kawalan tetap (238)
• Sistem komunikasi suara (239)
• Ruang akses menentang kebakaran (242)
• Lif bomba(243)
• Pengeluaran asap dan haba(249)
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KEPERLUAN AKTIF MENENTANG KEBAKARAN
KOORDINASI REKABENTUK DENGAN JURUTERA MEKANIKAL & ELEKTRIKAL BAGI MENDAPATKAN INPUT KEPERLUAN AKTIF UNTUK DIMASUKKAN
DALAM LUKISAN SENIBINA
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
UKURAN BANGUNAN JENIS PENCEGAH KEBAKARAN YANG
DIPERLUKAN
Pejabat 5 tingkat ke bawah atau melebihi
10,000 kaki persegi
Sistem Gelong Hos
Pejabat 5 tingkat ke atas, melebihi 60
kaki tinggi dan kurang dari 100 kaki
tinggi
Sistem Gelong Hos & Pancur Kering
Pejabat 5 tingkat ke atas, melebihi 100
kaki tinggi, keluasan kurang 100,000 kaki
persegi
Sistem Gelong Hos & Pancur Basah
Pejabat 5 tingkat ke atas, melebihi 100
kaki tinggi, keluasan melebihi 100,000
kaki persegi
Sistem Gelong Hos , Pancur Basah & Sistem
Semburan Automatik (Sprinkler System)
KAEDAH MENCEGAH KEBAKARAN JENIS BANGUNAN & SISTEM PENCEGAH KEBAKARAN YANG DIPERLUKAN
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
Bilakah Sistem Hose Reel Diperlukan?
SOALAN:
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
Pemasangan tertakluk kepada:
• JADUAL 10, UBBL 1984
• ARAHAN PIHAK BERKUASA
Umumnya sehingga 3 faktor menentukan gelunghos diperlukan:
• JENIS BANGUNAN/ KUMPULAN MAKSUD -pejabat, kediaman, hospital, dll
• SAIZ BANGUNAN ketinggian, luas lantai
• FUNGSI BANGUNAN kilang, stor, perhimpunan, institut
KEPERLUAN GEGELUNG HOS (HOSE REEL)
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KEPERLUAN GEGELUNG HOS (HOSE REEL)
MAIN DESIGN CONSIDERATION FOR HOSE REEL DESIGN
• STORAGE TANKa) Normally minimum effective storage of 9100 Litres (based on minimum 6 hose reel drums in
system)b) Minimum incoming flowrate of 20 l/minc) Material either pressed steel, FRPd) Located either on ground / basement level or on roof level
• PUMPSa) Two pumps (one duty, and one standby)b) Minimum flowrate 120 l/min (for four hose reels operating at one time); running pressure
minimum 2 barsc) Standby pump shall be from genset supply or else pump shall be diesel type with fuel to run
minimum 2 hours.
• PIPINGa) Material used Galvanised Iron Class ‘C’ (Heavy Duty)b) Pipe size 50mm Ø within building and 65mm Ø if external building depending on distance
• HOSE REEL DRUMSa) Located as such that all areas are generally covered by the 30m hose radius or approximately
every 800m2 area.b) Generally can assume every hosereel is able to produce 30 l/min and 6m jet spray.
c) Normally located at each floor along escape routes.
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KEPERLUAN GEGELUNG HOS (HOSE REEL)
SYSTEM INTERFACE
• Architectural
• Civil & Structure
• Electrical
• Mechanical – Plumbing
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KEPERLUAN GEGELUNG HOS (HOSE REEL)
SISTEM HOSE REEL
Description Arch C&S Elec Mech
PUMP ROOM Strategic Location √
Located on ground level and external
access
√
Pump room size √
Louvered double leaf door & open
outwards
√
High level louvered glass √
Concrete plinth & location √
Incoming water supply √
Floor trap √
Epoxy floor paint √
Incoming power supply √
Lighting and 13amp socket √
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KEPERLUAN GEGELUNG HOS (HOSE REEL)
SISTEM HOSE REEL
Description Arch C&S Elec Mech
PIPE RISER Floor opening 100 mm x 100mm
at every floor
√
HOSE REEL RISER
COMPARTMENT
Recessed into the wall and door
flush with surface of wall
√
Located along escape route & >30
m from the furthest point
√ √
Flow trap √
c/w lockable door & signage √
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KEPERLUAN GEGELUNG HOS (HOSE REEL)
SISTEM HOSE REEL
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KEPERLUAN GEGELUNG HOS (HOSE REEL)
CONTOH-CONTOH PROJEK Isu- Isu Kehendak Bomba
Berapakah jarak di antara fire hydrant?
SOALAN:
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KATEGORI MENGIKUT APLIKASI TEKNOLOGI JADUAL KE-10
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KATEGORI MENGIKUT APLIKASI TEKNOLOGI JADUAL KE-10
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KATEGORI MENGIKUT APLIKASI TEKNOLOGI JADUAL KE-10
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KATEGORI MENGIKUT APLIKASI TEKNOLOGI JADUAL KE-10
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
KATEGORI MENGIKUT APLIKASI TEKNOLOGI
Hose reel design
JADUAL KE-10
HITUNGAN BEBAN PENDUDUKAN DAN MUATAN PINTU KELUAR(Calculation of Occupancy Load and Capacity of Exits)
5
JADUAL KE-7
HITUNGAN BEBAN
PENDUDUKAN
TRAVEL DISTANCE / DEAD END
KOMPARTMENHITUNGAN
HAD
HITUNGAN BEBAN PENDUDUKAN DAN MUATAN PINTU KELUAR
JADUAL KE-7
• Beban Pendudukan dikira untukmenentukan Muatan Keluar danseterusnya menentukan lebar dan bilanganpintu keluar / tempat keluar
• Pengiraan Beban Pendudukan perlumerujuk kepada Jadual ke-7
OCCUPANCY LOAD
PENGIRAAN BEBAN PENDUDUKAN OCCUPANCY LOAD
PEMBINAAN MAKMAL DAN PEJABAT 2 TINGKAT DI JOHOR
Berapakah lebar tanggayang diperlukan?
SOALAN:
Boleh rujuk UUK 177(e) – Bilangan orang >50 orang – lebar tangga minimum = 1100mm
- Bilangan orang <50 orang – lebar tangga minimum = 900mm
HITUNGAN BEBAN PENDUDUKAN DAN MUATAN PINTU KELUAR
JADUAL KE-7
KIRAAN OCCUPANCY LOAD
Dalam senarai di bawah adalahjadual keluasan dan kegunaandalam sebuah bangunankomersil.
SOALAN: 1) Kira lebar tangga2) Kira lebar pintu keluar di aras
tanah (ground floor)
Aras Lantai Kegunaan Luas Kawasan
Aras 15 Bilik Motor Lif dan
Bilik Mekanikal
dengan bumbung
rata
1800 m2
Aras 14 Ruang kosong di atas
restoran
1200 m2
Aras 13 Restoran 1800 m2
Aras 12 Pejabat 1800 m2
Aras 11 Pejabat 1800 m2
Aras 10 Pejabat 1800 m2
Aras 9 Pejabat 1800 m2
Aras 8 Pejabat 1800 m2
Aras 7 Pejabat 1800 m2
Aras 6 Pejabat 1800 m2
Aras 5 Pejabat 1800 m2
Aras 4 Pejabat 1800 m2
Aras 3 Kedai 2000 m2
Aras 2 Kedai 2000 m2
Aras 1 Kedai 2000 m2
Aras Lantai Kedai 2000 m2
Besmen 1 70 petak tempat
letak kereta
2500 m2
Besmen 2 120 petak tempat
letak kereta
2500 m2
Besmen 3 120 petak tempat
letak kereta
2500 m2
Langkah-langkah pengiraan adalah seperti berikut:
1. Kenalpasti Kumpulan Maksud
2. Dapatkan keluasan lantai
3. Kenalpasti Faktor Beban Pendudukan dari Jadual ke-7
4. Kira Beban Pendudukan
= Keluasan lantai ÷ Faktor Beban Pendudukan
5. Kenalpasti Faktor Muatan Keluar dari Jadual Ke-7
6. Kira Unit Muatan Keluar
= Beban Pendudukan ÷ Faktor Muatan Keluar
7. Tukar Unit Muatan Keluar kepada Lebar Tempat Keluar
= Unit Muatan Keluar x 550mm
HITUNGAN BEBAN PENDUDUKAN DAN MUATAN PINTU KELUAR
JADUAL KE-7
HITUNGAN BEBAN PENDUDUKAN DAN MUATAN PINTU KELUAR
JADUAL KE-7
(NOTA BAGI KIRAAN OCCUPANCY LOAD)
UUK 166(1) - sekurang- kurangnya dua pintu keluar tingkat ditempatkan.
UUK 167(2)/ Jadual Ketujuh - min pintu 700m
UUK 168 - setiap tingkat perlu sekurang- kurangnya 2 tanggaberasingan, kecuali UUK 194 (bangunan yg mempunyaitangga tunggal)
UUK 177 (a) - 1 drp tangga dianggap tidak boleh dilalui.
UUK 177 (e) - >50 org = 550mm x 2 unit lebar = 1100mm<50 org = 900mm – rumah kedai, rumah
TINGKAT 15 13 12 - 4 3 - 1 ARAS TANAH BESMEN 1-3
PINTU
KEGUNAAN BILIK MOTOR LIF
RESTORAN PEJABAT KEDAI KEDAI ARAS TANAH BESMEN ARAS TANAH(GRD)
KUMPULAN MAKSUD - VII IV V V VIII V
LUAS LANTAI (m2) A 1800 1800 1800 2000 2000 2500 2000
FAKTOR BEBAN PENDUDUKAN BAGI 1 ORG.
B -
BEBAN PENDUDUKAN (JUM. BIL. ORG. DI TINGKAT TERSEBUT)
A/B = C
MUATAN KELUAR SEUNIT LEBAR TANGGA
D
JUM. HITUNGAN BIL. UNIT LEBAR TANGGA
C/D = E
JUMLAH LEBAR TANGGA (TOTAL EXIT WIDTH)(1 UNIT = 550mm)
E x 550mm
MIN. LEBAR SATU TANGGA
BILANGAN & LEBAR SATU TANGGA (mm)
CADANGAN BILANGAN & LEBAR SATU TANGGA (mm)
Latihan Kiraan Occupancy Load..\09-occupancy load-borang.docx
07-Latihan occupancy load.pptx
JARAK PERJALANAN MAKSIMUM & HAD JALAN MATI(Maximum Travel Distances & Dead-End)
6
JADUAL KE-7
HITUNGAN BEBAN
PENDUDUKAN
TRAVEL DISTANCE / DEAD END
KOMPARTMENHITUNGAN
HAD
Perbezaan Jalan Mati & Jarak Perjalanan
Dead End Travel distance
Limit of travel distance to exit when
no alternative exits is provided
Limits of travel distance to exit when
alternative exits is provided.
Can be manipulated via
compartmentation
Limit can be increase via sprinkler.
Direct distance – travel distance
must be measured along the actual
path of travel
Open plan –the direct distance can
be measured as a straight line direct
to the exit.
Permitted travel distance is then
reduced to 2/3
JARAK PERJALANAN MAKSIMUM & HAD JALAN MATI
JADUAL KE-7
Final exit
Exit route
horizontal exit
storey exit
Travel distance
Travel distanceTravel distance
Final exit
JARAK PERJALANAN MAKSIMUM & HAD JALAN MATI
JADUAL KE-7
TANGGA TANGGA
PEJABAT
PEJABATPEJABAT
PEJABATPEJABAT
BILIK
M&E
L
O
B
I
D
I
L
I
N
D
U
N
G
LIF
LIF
KK KEL EL
EL EL
E
L
Syarat-Syarat Jalan Keluar;
•Kelebaran dan saiz tidak berkurangan sepanjang laluan
•Bebas dari halangan
•Pintu rintangan api
•Tanda KELUAR dan lampu kecemasan
•Semua bukaan tidak dibenarkan kecuali bukaan pintu rintangan api
•Pengudaraan dan pencahayaan cukup
KORIDOR DILINDUNG
JARAK PERJALANAN MAKSIMUM & HAD JALAN MATI
JADUAL KE-7
UKURAN BANGUNAN DAN KOMPARTMEN7
JADUAL KE-5
HITUNGAN BEBAN
PENDUDUKAN
TRAVEL DISTANCE / DEAD END
KOMPARTMENHITUNGAN
HAD
• UUK133: “Petak” bermaksud, mana-mana bahagian bangunan yang diasingkan daripada semua bahagian lain oleh satu atau lebih dindingpangsa atau lantai petak atau kedua-duanya
• Pemetakan adalah untuk membataskan kebakaran dalam petak danmenghalang dari merebak
• UUK 136: Bangunan tidak boleh mempunyai keluasan atau isipadu yang melebihi dari yang terkandung pada Jadual Ke-5
• Had-had ukuran diganda dua dengan pemasangansemburan automatik
UKURAN BANGUNAN DAN KOMPARTMEN
JADUAL KE-5
• Antara UUK lain yang terlibat dengan pemetakan:
• UUK 137: Lantai dalam bangunan yang melebihi tinggi 30 meter hendaklah dibina sebagai lantai petak
• UUK 138: Dinding dan lantai hendaklah dibina sebagai dindingpangsa dan lantai petak
• UUK 139: Pengasingan kawasan berisiko kebakaran
• UUK 215: Dinding pangsa bagi pemetakan menegak
UKURAN BANGUNAN DAN KOMPARTMEN
JADUAL KE-5
BAHAGIAN PADA JADUAL KE-5
BAHAGIAN I:
Bangunan Selain
Daripada Bangunan
1 Tingkat
BAHAGIAN II:
Bangunan 1
Tingkat
Sebarang
Ketinggian
Ketinggian
Bangunan tidak
melebihi atau
melebihi 28m
Kumpulan Maksud
II: Institusi
V: Kedai
Kumpulan Maksud
III: Kediaman Lain
VI: Kilang
VIII: Storan & Am
Kumpulan Maksud
II: Institusi
III: Kediaman Lain
Pengecualian
Kumpulan Maksud
I: Kediaman Kecil
IV: Pejabat
VII: Tempat
Perhimpunan
Tidak termasuk
kerana tiada had
terpakai di bawah
UUK 138
UKURAN BANGUNAN DAN KOMPARTMEN
JADUAL KE-5
UKURAN BANGUNAN DAN KOMPARTMEN JADUAL KE-5
Kumpulan Maksud Had Ukuran Disembur (Sprinklered)
Hotel / III Tinggi > 28mKeluasan lantai: 2000m2Isipadu: 5500m3
4000m211000m3
Pejabat/ IV Tinggi > 28mKeluasan lantai: Tiada HadIsipadu: Tiada Had
Kedai/ V Sebarang TinggiKeluasan lantai: 2000m2Isipadu: 7000m3
4000m214000m3
Besmen Parking/ VIII Tinggi <28mKeluasan lantai: Tiada HadIsipadu: 21000m3 42000m3
• UUK 136: Jika disembur (sprinklered) Had Ukuran Jadual 5 diganda dua• Kumpulan Maksud I, IV dan VII tidak termasuk di dalam Jadual 5 kerana tiada had
terpakai di bawah peruntukan UUK 138.
1800m2 / flr
40000m2 / flr
40,000m2 / flr ( 160,000m2 total )
UBBL 137Compartment Floors
UBBL 137Compartment Floors
UBBL 138(d)Compartment floor
UBBL 215Vertical separation
PELAN
UKURAN BANGUNAN DAN KOMPARTMEN
JADUAL KE-5
Shop compartment limit 4,000m2 14,000m3
Compartment A
Compartment BNo limits if
At least 60% area are shopsLess than 280m2 each
Compartment C
UKURAN BANGUNAN DAN KOMPARTMEN
JADUAL KE-5
Basement compartment volume limit 42,000m2
Compartment A
Compartment B
Compartment C
Separation of vertical ‘shaft’
Compartment D
UKURAN BANGUNAN DAN KOMPARTMEN
JADUAL KE-5
HITUNGAN HAD YANG DIBENARKAN BAGI KAWASAN TAK TERLINDUNG
8
JADUAL KE-6
HITUNGAN BEBAN
PENDUDUKAN
TRAVEL DISTANCE / DEAD END
KOMPARTMENHITUNGAN
HAD
• UUK 142- 146
• Untuk mengenalpasti jarak selamat di antara bangunan daripada risikokebakaran
• Mengawal jarak di antara bangunan dan saiz maksimum bagi bukaanuntuk mencegah kebakaran merebak.
• Bukaan luaran (tingkap, fasad kaca) boleh menjadi punca kepada sumberradiasi haba.
HITUNGAN HAD YANG DIBENARKAN BAGI KAWASAN TAK TERLINDUNG
JADUAL KE-6
HITUNGAN HAD YANG DIBENARKAN BAGI KAWASAN TAK TERLINDUNG
HITUNGAN HAD YANG DIBENARKAN BAGI KAWASAN TAK TERLINDUNG
JADUAL KE-6
EXAMPLE RELEVANT DISTANCE DOES NOT ENCROACH ANOTHER BUILDING
Building 1
Building 2
A B
Notional boundary
Site
bo
un
dar
y
Site
bo
un
dar
y
Physical boundary
Relevant boundary from centre of road
Calculated Distance to satisfy space Separation through 6th schedule
EXAMPLE : RELEVANT DISTANCE ENCROACHES NOTIONAL BOUNDARY
Building 1
Building 2
A B
Calculated Distance to satisfy space Separation through 6th schedule
When distance set, becomes relevant boundary and does not encroach the next building
Site
bo
un
dar
y
Site
bo
un
dar
y
Agreegate Notional Area
Each façade has different distance for relevant boundary subject to size of protected wall & unprotected opening
EXAMPLE DIFFERENT FORM OF BUILDING TO DETERMINE IMAGENERY LINE AT RELEVANT BOUNDARY
Relevant boundary Relevant boundary
6TH SCHEDULE DIVIDED TO 4 PARTS
PART I – GENERAL RULES • Permitted limit calculate by using part ii to iv• And areas excluded in part b(i) to b(iv)
PART II – RULES OF CALCULATION BY REFERENCE TO AN ENCLOSING RECTANGLE
PART III - RULES CALCULATION BY REFERENCE TO AGREAGATE NOTIONAL AREA
PART IV – RULES FOR CALCULATION IN RESPECT OF CERTAIN BUILDINGS GROUP 1- 3
PenghitunganKawasan TakTerlindung
HITUNGAN HAD YANG DIBENARKAN BAGI KAWASAN TAK TERLINDUNG
JADUAL KE-6
Objective is to check if the front façade design complies with Sixth Schedule
Compliance to part Objective
Part II (Rules of Calculation by reference to an Enclosing Rectangle)
1. To calculate relevant boundary distance
2. To determine limit of unprotected opening
Part III (Rules for Calculation by reference to Aggregate Notional area)
To calculate whether relevant boundary distance comply to aggregate notional area allowed in schedule
1. 210sqm- I.II.III.IV, VII2. 90 sqm – purpose group V,VI,VIII
Design parameter existing & Assumptions made :
1. Purpose Group : IV (Office)
2. Assume design for : Building façade is 7.5 meter to
centre of road
3. Building not compartmented
4. Annexes block to be disregarded
GENERAL ASSUMPTION
Calculation of Enclosing Rectangle:
Width façade : 9 m
Height Façade : 21.4 m
Enclosing rectangle
= Width x Height
= 9 m x 21.4 m
= 192.6 m2
STEP 1 : Establish Enclosing Rectangle Size on Plane of Reference
Enclosing rectangle = area of facade
STEP 1 : Establish Enclosing Rectangle Size on Plane of Reference
Width:23m – 1.6m =21.4 m
Exculude this area
Calculation of Unprotected Openings areas:
windows on Upper Floors
= (3 m x 2 m) x 10 nos
= 60 m2
window on Ground Level
= (9 m x 3 m) x 1 no
= 27 m2
Total Area of Unprotected Openings
= 60 m2 + 27 m2
= 87 m2
STEP 2: Calculate Area and Percentage of Unprotected Openings
Unprotected Openings = Unprotected Openings such as windows and void openings
STEP 3: CALCULATION OF PERCENTAGE OF UNPROTECTED AREA
Percentage of unprotected opening in rectangle = Percentage ratio of unprotected area on the wall surface
Percentage of Unprotected Openingin Enclosing Rectangle is:
= (Unprotected Area / Façade Area) x 100%= (87 m2 / 192.6 m2) x 100%= 45.17%
Establish the parameters:
1. Height = 21.4 m
2. Width = 9m
3. Percentage unprotected opening = 45.17%
STEP 4 : For Compliance with Part II
Look for relevant Table in schedule 6 at part II-
1. Select table for Purpose Groups I (Small Residential), II (Institutional), III (Other Residential), IV (Office) and VII (Assembly)
2. Select the next highest height, if 21 meters, select 24 meters table
TIPS : SELECT HIGHER NUMBER!
SCHEDULE 6 PART II TABLE FOR DIFFERENT TYPE OF PURPOSE GROUP
1. Maximum table height is for less than 27m height building.2. Any more higher will be calculate as compartment floors.
SELECT THE RIGHT TABLE BASED ON HEIGHT = 24m
Read the following
1. Row : 9 meter Width Enclosing Rectangle
2. Column : Select percentage of unprotected area 50%
(next higher from 45.17% to check compliance
STEP 5 : Go to Table with enclosing rectangle 24m high (next higher from 21m ) ,
% of UNPROTECTED AREA
SELECT THE RIGHT TABLE BASED ON HEIGHT = 24m
STEP 6 : For Compliance with Part II – check relevant boundary permitted
Reading from the 9m Row,
Permitted minimum: For 50% Unprotected Opening, the distance to Relevant boundary should not be less than 5.5m
Design for: Distance to Relevant Boundary = 7.5m (set back from relevant boundary) is more then what requires of 5.5 meters
Therefore Façade complies with Sixth Schedule Part II
WIDTH = 9m
% of UNPROTECTED AREA
PROVIDED:DISTANCES TO RELEVAN BOUNDARY : 7.5m
Using the same 9m W x 24m H
Enclosing Rectangle, if one uses the
Permitted : 45.17% permitted opening refer to 50% , 5.5m from relevant boundary
Design for : For 7.5m distance to Relevant Boundary as the basis, reading upwards, one finds that the maximum percentage of unprotected opening is 70%,
therefore, the façade design satisfies Part II of the Sixth Schedule and designer have an option to add more openings from 45.17% to 50%.
STEP 7 : For Compliance with Part II – check for possible extra opening to be provided
If add sprinkler, 2 options
1. Relevant boundary can be half of what is given- example 7.5 become 3.25 or,
2. If already comply with the relevant boundary distance, can double the unprotected area – example 87sqm becomes 174 sqm, become 90% and relevant boundary 9 meters
Source: The Building Regulations 2000: approved document, B: Fire safety ..., Volume 2 By Stationery Office, Great Britain
WHAT HAPPEN IF THE BUILDING IS ADDED WITH SPRINKLER?
STEP 8 : Determine factor to Calculate compliance to aggregate notional area (part III)
7.5m
Table of factors for distance to vertical datum between 6.0m to 8.5m is 2
Relevant boundary distance establish in design : 7.5 meterCheck table to get the factor
EXAMPLE : RELEVANT DISTANCE ENCROACHES NOTIONAL BOUNDARY
Building 1
Building 2
A B
Calculated Distance to satisfy space Separation through 6th schedule
When distance set, becomes relevant boundary and does not encroach the next building
Site
bo
un
dar
y
Site
bo
un
dar
y
Agreegate Notional Area
STEP 9 : Calculation compliance to aggregate notional area
Total Area of Unprotected Opening is 87sm for office building (purpose group IV)
Aggregate Notional Area is :
area of Unprotected Opening X Factor in table factor PART III schedule 6
87 sqm X 2 = 174 sqm
Part III Rule 1 says aggregate notional area at side building must not exceed
1. 210sqm- I.II.III.IV, IV2. 90 sqm – purpose group V,VI,VIII
Therefore, façade of office building with 174 sqm which is less than 210 sqm satisfies Part III Rule 1(a) of Sixth Schedule
KEPERLUAN TAPAK - PILI BOMBA (FIRE HYDRANT)9
KEPERLUAN TAPAK - PILI
BOMBA
TRAVEL DISTANCE / DEAD END
KOMPARTMENMENGIKUT APLIKASI
TEKNOLOGI
• Syarat kedudukan pili bomba:
• Jauh dari halangan
• Jauh dari risiko kerosakan disebabkan oleh kenderaan
• Tidak kurang 2m dari bangunan dan unjuran
• Tidak melebihi 6m dari bangunan
• Jarak maksimum 91.5m selang antara pili bomba
• Berhampiran dengan akses pekakas bomba (antara 0.61 m ke 2.4m)
• Tidak melebihi 30m dari breeching inlet jika terdapat pemasangan dry riser
• Pili Bomba adalah sumber utama bekalan air kepada pasukan bomba bagi
melawan kebakaran
• UUK 225(2): Setiap bangunan perlu dilengkapkan dengan sekurangnya 1 pili
bomba
• Pili bomba perlu ditempatkan tidak melebihi 91.5m dari tempat akses pasukan
bomba yang terdekat
• UUK 225(3): Pili bomba tambahan perlu disediakan seperti kehendak Pihak
Berkuasa Bomba
KEPERLUAN TAPAK - PILI BOMBA (FIRE HYDRANT)
• Perintah Tetap Ketua Pengarah Bilangan 1 Tahun 2014: Penandaan Pili
Bomba Awam & Swasta (24 Januari 2014)
MENGIKUT KUMPULAN
MAKSUD
MENGIKUT KETINGGIAN
MENGIKUT KELUASAN/
ISIPADU
MENGIKUT APLIKASI
TEKNOLOGI
Pili Bomba Awam –(cat merah)• Suatu aliran pemasangan pili bomba yang
dipasang untuk menyediakan bekalan air yang tidak bermeter bagi tujuan operasipemadaman keakaran.
Pili Bomba Swasta – (cat kuning)• Suatu aliran pemasangan pili bomba yang
dipasang untuk menyediakan bekalan air yang mempunyai meter ke sesuatu premis ataucompound bagi tujuan operasi pemadamanapi.