Channel Cross Section. Shifts are applied by developing “V-diagrams”. Recent Measurements. Measurements plotted on axes of V-diagram. Channel Cross Section. Here is what a v-diagram and its shift curve generally look like. Shift curve. Variable shift diagram. Shifts vary by STAGE and TIME. - PowerPoint PPT Presentation

Citation preview

Channel Cross Section

Recent Measurements

2.0

2.2

2.4

2.6

2.8

3.0

3.2

-0.40 -0.35 -0.30 -0.25 -0.20

Site Number: 00000000 - Site Name: Rating Curve Exercise 5 - DD: 6 - Rating Number: 0000Shift: 06/16/1974 12:43

Sta

ge

Shift

Measurements plotted on axes of V-diagram

Shifts are applied by developing “V-diagrams”

Channel Cross Section

Variable shift diagram

Shift curve

Here is what a v-diagram and its shift curve generally look like

0.01

0.1

1

10

100

0.1 1 10 100 1000 10000Discharge, in cfs

Gag

e H

eigh

t - o

ffset

Variable shift diagram

0

1

2

3

4

5

6

7

-0.3 -0.1

Shift, in feet

Gag

e H

eigh

t

July 1Sept. 1

Shifts vary by STAGE and TIME

0.01

0.1

1

10

100

0.1 1 10 100 1000 10000

Discharge, in cfs

Gag

e H

eigh

t - o

ffset

Variable shift diagram

0

1

2

3

4

5

6

7

-0.3 -0.1

Shift, in feet

Gag

e H

eigh

t

July 1Sept. 1

Meas. made 7/20and 8/15

Shifts should be faithful to the base rating

GH Q Shift0.38 0.29 -0.24

0.4 0.39 -0.241.95 110 -0.15

6.5 3000 0.973.94 805 02.66 299 0

Recent Measurements Concrete

Control

Let’s follow an application of shifts at a site

San Francisquito Creek

0.01

0.1

1

10

100

0.1 1 10 100 1000 10000Discharge, in cfs

Gag

e H

eigh

t - o

ffset

0

1

2

3

4

5

6

7

-1 -0.5 0 0.5 1

Shift, in feet

Gag

e H

eigh

t

1 2

3

46

2

3

4

6

5

1

5

It would be easy (but WRONG) to lump all measurements into one shift----

0

1

2

3

4

5

6

7

-1 -0.5 0 0.5 1

Shift, in feet

Gag

e H

eigh

t

San Francisquito Creek

0.01

0.1

1

10

100

0.1 1 10 100 1000 10000

Discharge, in cfs

Gag

e H

eigh

t - o

ffset

Section Control

Channel Control

One shift doesn’t always work

Date GH Q Shift09/20 0.38 0.29 -0.2411/15 0.4 0.39 -0.2402/10 1.95 110 -0.1502/20 6.5 3000 0.9703/05 3.94 805 003/10 2.66 299 0

You need to consider the hydrograph when applying shifts

San Francisquito Creek

0.01

0.1

1

10

100

0.1 1 10 100 1000 10000

Discharge, in cfs

Gag

e H

eigh

t - o

ffset Section

Control

Channel Control

Algae growth?

Let’s see how all the available information

should be put together

Channel Control

Upstream view of control at GH of 5.40 feet

Downstream view of control at GH of 6.25 feet

San Francisquito Creek

1

10

100

100 1000 10000

Discharge, in cfs

Gag

e H

eigh

t - o

ffset

Changes in the channel control caused the rating to shift

San Francisquito Creek

0.01

0.1

1

10

100

0.1 1 10 100 1000 10000Discharge, in cfs

Gag

e H

eigh

t - o

ffset

0

2

4

6

8

10

12

-1 -0.5 0 0.5 1

Shift, in feet

Gag

e H

eigh

t

3

4

6

1

5

2

V-diagram representing channel

control

V-diagram representing section control

Measurements were used to define two shift curves

0

2

4

6

8

10

12

-1 -0.5 0 0.5 1

Shift, in feet

Gag

e H

eigh

t

Effective from ???

Effective from ????

Shift application took the hydrograph into account

X

X

X=Discharge Measurement

Prorate

Hold ScourFill

X

#1

#2 #3

Here is a generalized example of how shifts can be timed

Recommended