Fan coolers
Citation preview
63
12
S.
39
th W
est
Ave
nue
•
Tuls
a, O
klah
oma
74
13
2
• P
hone
: 9
18
.44
6.4
40
6
• F
ax:
91
8.4
45
.28
57
•
ww
w.s
mith
co-e
ng.c
om
• e
mai
l: in
fo@
smith
co-e
ng.c
om
For a quote or more information about our design
and manufacturing capabilities, please contact your local
Smithco Engineering sales representative or email us at
info@smithco-eng.com.
REF
ININ
G &
PR
OCE
SSIN
G
Key Features:• Custom thermal and mechanical designs• Rugged construction from heavy gauge steel for equipment longevity• Outline drawings available with quote• Various materials of construction available – Carbon and Low Alloy Steels, Stainless Steel, Duplex as well as other Alloy Materials• Cooling sections from 3' to 60' long• Galvanized structural fi nish and metallized headers standard, suitable for off-shore applications and other harsh environments• Low noise designs available• Induced and forced draft designs
Optional Auxiliary Components:• Louvers (manual or automatic)• Warm air recirculation system• Steam coil • Walkways and maintenance platforms • Project and/or customer specifi c requirements
Maintenance & Support:• Customer support during critical maintenance schedules• Replacement fi nned tubes• Replacement bundles• Mechanical components• Technical fi eld service support
Smithco Engineering ddddeeesssiiigggnnnsss, mmmaaannnuuufffaaaccctttuuurrreeesss aaaannnnddddd supports air-cooled heat exchangers for the refi ning and processing industries. Applications include gas coolers & condensers, process coolers, oil coolers as well as others.
63
12
S.
39
th W
est
Ave
nue
•
Tuls
a, O
klah
oma
74
13
2
• P
hone
: 9
18
.44
6.4
40
6
• F
ax:
91
8.4
45
.28
57
•
ww
w.s
mith
co-e
ng.c
om
• e
mai
l: in
fo@
smith
co-e
ng.c
om
For a quote or more information about our design
and manufacturing capabilities, please contact your local
Smithco Engineering sales representative or email us at
info@smithco-eng.com.
GAS
CO
MPR
ESSI
ON
Features of Amercool Coolers:• Heavy duty “Oil Field” construction• Header construction per ASME Code 150—11,150 psig design pressure• Rugged construction from heavy gauge steel for equipment longevity• Galvanized fi nish standard—suitable for off-shore applications and other harsh environments• Heavy duty tapered roller bearings• Shoulder-type access plugs for ease of maintenance • Low noise, high effi ciency fans• Extensive experience in rating coolers for gas compression packages• Custom engineered and built• Outline drawings available with quote
Confi gurations Available:• VCI Models: 48" – 168" (vertical, engine driven, induced draft)• VCF Models: 48" – 168" (vertical, engine driven, forced draft)• ST Models: 30" – 60" (vertical, motor driven, forced/induced draft)• HF Models: horizontal coils, vertical fans, engine driven, forced draft, up to 60' long sections• Horizontal (electric motor drive, forced/induced draft, up to 60' long sections)
Maintenance & Support:• Customer support during critical maintenance schedules• Replacement fi nned tubes• Replacement bundles• Mechanical components• Technical fi eld service support
Smithco’s Amercool Division dddddeeeessssiiiiigggggnnnnssss,, mmmmmaaaaannnnuuuufffffaaaacccctttttuuuurrrreeeessss aaaaannnndddddd supports air-cooled heat exchangers for the gas compression industry. Applications include gas coolers & condensers, engine coolers, process coolers, oil coolers as well as others.
63
12
S.
39
th W
est
Ave
nue
•
Tuls
a, O
klah
oma
74
13
2
• P
hone
: 9
18
.44
6.4
40
6
• F
ax:
91
8.4
45
.28
57
•
ww
w.s
mith
co-e
ng.c
om
• e
mai
l: in
fo@
smith
co-e
ng.c
om
For a quote or more information about our design
and manufacturing capabilities, please contact your local
Smithco Engineering sales representative or email us at
info@smithco-eng.com.
GEN
ERAT
OR
SET
S
Features of Amercool Coolers:• Rugged construction from heavy gauge steel for equipment longevity• Galvanized fi nish standard—suitable for off-shore applications and other harsh environments• Low noise designs available• Outline drawings available with quote• Cooling sections from 3' to 60' long• Round fi nned tubes 5/8" to 1 1/4"• Low pressure drop design• Various materials of construction available including 304, 316 stainless• Surge tanks available
Confi gurations Available:• Horizontal (electric motor drive, forced/induced draft, up to 60' long sections)• VCI Models: 48" – 168" (vertical, engine driven, induced draft)• ST Models: 30" – 60" (vertical, motor driven, forced/induced draft)• HF Models: horizontal coils, vertical fans, engine driven, forced draft, up to 60' long sections
Maintenance & Support:• Customer support during critical maintenance schedules• Replacement fi nned tubes• Replacement bundles• Mechanical components• Technical fi eld service support
Smithco’s Amercool Division ddddddddddddddddddddddddddddddddddddddddddddddddeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeesssssssssssssssssssssssssssssssssssssssssssssssssssssssssssiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiggggggggggggggggggggggggggggggggggggggggggggggggggnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnsssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssss,,,,,,,,,,,,,,, mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaannnnnnnnnnnnnnnnnnnnnnnnnnnuuuuuuuuuuuuuuuuuuuuuuuuuuffffffffffffffffffffffffffffaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaacccccccccccccccccccccccccccccccccccttttttttttttttttttttttttttttttttttttttttttttttttttuuuuuuuuuuuuuuuuuuuuuuuuuuuurrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrreeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeesssssssssssssssssssssssssssssssssssss aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaannnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnndddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddddd sssssssssuuuuuuuuppppppppppppppppppppppppppppppooooooooooorrrrrrrrrrrrrrrrtttttttttttsssssssssssssss aaaaaaaaaaaaaiiiiiiiirrrrrrrrrrrrr--------cccccccccccoooooooooooooooooooooooooooollllllllleeeeeeeeeeeeeeeeeeeeeddddddddddd hhhhhheeeeeaaaaaaaaaaaaaatttttttttttttt eeeeeeeeeeeeexxxxxxxxxxxxxxxxxxxxxccccccccccccccccccccccchhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhaaaaaaaaaaaannnnnnnnnnnnnnnnggggggggggggggggeeeeeeeeeeeeeeeerrrrrrrrrrrrrrssssssssssssssssss ffffffffffffffffffffffffffffffooooooooooooooooooooooooooooorrrrrrrrrrrrrrrrrrrrrrrrrr ttttttttttthhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhheeeeeeeeeeeeeeeeeee pppppppppppppppppppppppppppppppppppppppooooooooooowwwwwwwwwwwweeeeeeeeeeeeeeerrrrrrrrrrrrrrrr gggggggggggggggggggeeeeeeeeeeeeeeeennnnnnnnnnnnnnnnnneeeeeeeeeeeeeeeeeeeeeeerrrrrrrrrrrrrrraaaaaaaaaaaaaaaaaaaaaaaaattttttttttttttttttttttttttttttiiiiiiiiiiiiiiiiiiooooooooooooonnnnnnnnnnn iiiiiiiiiiiiiiiinnnnnnnnnnnnnnndddddddddduuuuuuuuuuussssssssssssssssttttttttttrrrrrrrrrrryyyyyyyyyyyyy.... AAAAAAAAAAAAAAAppppppppppppppppppppppppplllllllllllllliiiiiiiiicccccccccccccaaaaaaaaatttttiiiiiiiooooonnnnnsssss iiiiinnnnnnnnnccccccccccccccccccclllllllluuuuuuuuudddddddddddddddeeeeeeeeeeeeeeeee rrrrrrrrrrrrrrraaaaaaaaaaaaaaaaaadddddddddddddddddiiiiiiiiiiiiaaaaaaaaaaaaaaaaaaaatttttttttttttttttttttttttttttooooooooooooooooooooorrrrrrrrrrrrrrrrrsssssssssssssss,,,,,,,,,,,, ggggggggggggggggggggeeeeeeeeeeeeeeeeeeeeeeeeeeeeeennnnnnnnnnnnnneeeeeeeeeeeeeeeeeeeeeeeeerrrrrrrrrrraaaaaaaaaaaaattttttttttttttttoooooooooooooooooooooorrrrrrrrr sssssssssssssssssssseeeeeeeeeeeeeeeeeeeeeetttttttttttttsssssssssssssssssss,,,,,,,,,, lllllllllllllaaaaaaaaaaaaaaaaaaaaaaaaaannnnnnnnnnnnnnnnnnnnnnnnnnndddddddddddddddddddddddfifififififififififififififififififififi lllllllllllllllllll ggggggggggaaaaaaaaaaaaasssssssssss ccccccccccccccoooooooooooooooooooooooooooollllllllliiiiiiiiinnnnnnnnnnnnggggggggggggggg aaaaaaaaaaasssssssssss wwwwwwwwwwwweeeeeeelllllllllllll aaaaaaaaassssssss oooooooooottttttttttthhhhhhhhhhhheeeeeeeeeeeeeeerrrrrrrrrrrrsssssssssssss........
63
12
S.
39
th W
est
Ave
nue
•
Tuls
a, O
klah
oma
74
13
2
• P
hone
: 9
18
.44
6.4
40
6
• F
ax:
91
8.4
45
.28
57
•
ww
w.s
mit
hco-
eng.
com
•
em
ail:
info
@sm
ithc
o-en
g.co
m
Please contact your Smithco Engineering sales representative for quotes or for more information.
* All trademarks and registered trademarks are the property of their respective owners.
Profile:
Ownership: Privately Owned Company
Products: Air-Cooled Heat Exchangers
Sales Representation: Most Major U.S. Cities, Eastern & Western Canada, Mexico, Pacific Rim, Middle East, Trinidad & Tobago and United Kingdom (Refer to www.smithco-eng.com for rep list)
Mailing Address: P.O. Box 571330 Tulsa, OK 74157
Office Address: 6312 South 39th West Avenue Tulsa, OK 74132
Telephone: 918.446.4406 Fax: 918.445.2857
E-mail: info@smithco-eng.com
Key Personnel:
Qualifications:
Engineering: Complete thermal, hydraulic, and mechanical design of air-cooled heat exchangers and atmospheric sections
Materials of Carbon Steel, Stainless Steel, Monel™, Copper-Nickel, Construction: Duplex, Incoloy®, Titanium, and Hastelloy®
Codes and Standards ASME, Section VIII, Division I; TEMA R-B-C; of Construction: API 661; AISC; AWS
Non-Destructive By Smithco: Magnetic Particle Examination, Dye Examination: Penetrant Examination, Brinnell Hardness Tests Subcontracted at Smithco Facilities: Radiography, Ultrasonic Testing Subcontracted: All Physical Testing
ASME Code Inspections: Seneca Insurance Company of Texas
David Block President Tom Montgomery Parts & Service Manager
Chris Ashley Director of Sales & Engineering Carl Henderson Director of Manufacturing
Emily Snyder Controller Lloyd Hursh Plant Manager
Matt Fadenrecht Quality Control Jim Matthews Sales & Projects Coordinator
CORPORATE PROFILE
PLANT SURVEY6
31
2 S
. 3
9th
Wes
t A
venu
e •
Tu
lsa,
Okl
ahom
a 7
41
32
•
Pho
ne:
91
8.4
46
.44
06
•
Fax
: 9
18
.44
5.2
85
7
• w
ww
.sm
ithc
o-en
g.co
m
• e
mai
l: in
fo@
smit
hco-
eng.
com
Smithco Engineering Inc.’s facilities are located in West Tulsa near major subcontractors, suppliers, terminals, and shipping. The plant includes 43,000 square of fabrication space under roof and 1,500 square feet of office space on an eleven-acre site.
Details of the facilities are shown below:
Header Welding Fabrication
Finning Operations
Bundle Assembly
In Process Storage Area
Header welding fabrication bay and storage area consume one total bay of 40' x 440'. Finning operations and bundle assembly consume one total bay size of 40' x 440' with an additional 160' of tube storage area and completed bundle area.
Header Welding Fabrication16 - Miller® Phoenix® 456cc/cv Inverter Power Sources with D64 Dual Wire Feeders (SMAW / GMAW / FCAW)4 - Miller 444 Power Sources (SMAW)2 - Lincoln® DC-600 Power Source (for internal SAW seam welding)1 - ESAB® Deuce Pack - 150 Auto Plasma Gouger4 - Lincoln DC-1000 Power Source (for auto SAW)1 - L-Tec 801 DC Power Source (for auto SAW)1 - Hobart® Cybertig® 800 with Water Cooler (for tube-to-tubesheet GTAW welding)1 - Hobart Cybertig 300 with Water Cooler (for tube-to-tubesheet GTAW welding) NDE Capabilities - RT, PT, MT, UT, PMI
Machine Capabilities4 - 5' Summit® Radial Arm Drill
Finning Equipment3 - McElroy® No. 4 Tube Finning Machine (tension single footed, tension double overlap footed)1 - McElroy No. 3S Tube Finning Machine (tension single footed, tension double overlap footed)1 - McElroy No. 1 Extruded Finning Machine (S/N 079)1 - Cast Zinc Tube Support Table Complete with Zinc Pots and Molds Additional Capabilities - Tooling 8-12 FPI; 1/2" or 5/8" Fin Heights
Mobile Handling Equipment1 - 5-ton Yale® Forklifts 2 - 3-ton Yale Forklifts
Bundle Assembly4 - Airetool® Model 850/660 rpm Rolling Motors4 - Airetool Model 850/1250 rpm Rolling Motors1 - Airetool Model 1000/400 rpm Rolling Motors2 - Centrifugal Quip Fill Pumps2 - 5,000 PSIG Hydrostatic Test Pump1 - 20,000 PSIG Hydrostatic Test Pump1 - 15,000 PSIG Dead Weight Tester1 - Lube Oil Flushing System; 650 GPM at 50 PSI Drop with Test Sample Tank and 500-Gallon Storage Tank.
Bay Dimensions Crane Type Number Total Capacity
40' x 360' Bridge 4 (2) @ 3 tons each(2) @ 5 tons each
Bay Dimensions Crane Type Number Total Capacity
40' x 220' Bridge 2 5 tons each
Bay Dimensions Crane Type
40' x 80' Mobile Handling Only
Bay Dimensions Crane Type Number Total Capacity
40' x 220' Bridge 2 10 tons each
Please contact your Smithco Engineering sales representative for quotes or for more information. * All trademarks and registered trademarks are the property
of their respective owners.
63
12
S.
39
th W
est
Ave
nue
•
Tuls
a, O
klah
oma
74
13
2
• P
hone
: 9
18
.44
6.4
40
6
• F
ax:
91
8.4
45
.28
57
•
ww
w.s
mit
hco-
eng.
com
•
em
ail:
info
@sm
ithc
o-en
g.co
mYear Company Locations Service
2009 AG Equipment Bolivia Jacket Water Cooler, Interstage Cooler
2008 Alon USA Boulder, WY Desmoking Recycle Cooler
2010 Atlas Copco Queensland, Australia Lube Oil Cooler
2008 BP America Crane City, TX Interstage Cooler
2010 Caterpillar Lafatette, IN Engine Cooler
2008 Chesapeake Energy Copperhead Facility Natural Gas Cooler
2008 ConocoPhillips Ferndale, WA Interstage Cooler, Discharge Cooler, Glycol Cooler
2010 Cummins Power Generation New Orleans, LA Engine Cooler
2010 DCP Midstream Midkiff, TX Lean Amine Cooler
2010 Dow Chemical Plaquemine, LA Condenser
2010 EnCana Oil & Gas Fort Lupton, CO Stripping Gas Cooler
2010 Exterran Energy Mont Belvieu, TX Amine Cooler
2008 Golden Pass LNG Sabine Pass, TX Interstage Cooler, Discharge Cooler
2010 John Zink Tulsa, OK Service Liquid Cooler
2010 Johnson Controls Peru Oil Cooler
2008 Kobelco EDTI Compressors Durango, Mexico Oil Cooler
2007 Landfill Energy SystemsBrevard County
Landfill, FLEngine Cooler
2010 Marathon Petroleum Garyville, LA Water Cooler
2010 Mayekawa Saudi Arabia Oil Cooler
2009 Midrex Technologies Sabine Pass, TX Lube Oil Cooler
2009 NATCO Bossier City, LA Reflux Condenser, Amine Cooler
2008 Occidental Permian Montreal, Canada Gas Cooler
2007 Patten Power Systems Columbia Ridge Jacket Water Cooler
2008 Pilkington North America Lathrop, CA Water Cooler
2008 REC Silicon Paulsboro, NJ Oil Cooler
2010 Sinclair Refining Casper, WY Reform Product Condenser
2008 Suncor Energy Sarnia, ON, Canada Reflux Cooler
2008 Valero Refining St. Charles Refinery, LA Stripper Overhead Condenser
2010 Wagner Power Systems Albuquerque, NM Engine Cooler
2007 Waste Management New Milford, CT Jacket Water Cooler
RECENT INSTALLATIONS
Please contact your Smithco Engineering sales representative for quotes or for more information.
63
12
S.
39
th W
est
Ave
nue
•
Tuls
a, O
klah
oma
74
13
2
• P
hone
: 9
18
.44
6.4
40
6
• F
ax:
91
8.4
45
.28
57
•
ww
w.s
mit
hco-
eng.
com
•
em
ail:
info
@sm
ithc
o-en
g.co
m
Please contact your Smithco Engineering sales representative for quotes or for more information.
Year Company Locations Service
2008 Ambitech Engineering Rosemount, MN Steam Coil
2008 BCCK Engineering Sublette County, WY Regeneration Gas Cooler
2008 Burns & McDonnell Delaware City, DE SWS Pump Around Cooler
2006 CB&I Howe Baker TexasAmine Stripper Condenser, Lean Amine Cooler, Sour Water Cooler
2008 Englobal Engineering Big Spring, TX Reactor Effluent Condenser
2008 Fluor Daniel Moses Lake, WA Overhead Condenser
2007 Koch Modular Process Systems Paramus, NJ Cooling Water Condenser, Feed Cooler
2009 Linde Process Plants Alaska Start-up Cooler, Fuel Cooler
2010 Optimized Process Design Sheridan, TX Depropanizer Reflux Condenser
2010 Saulsbury Engineering West Texas Refrigerant Condenser
2008 Technip Beaumont, TX Interstage Cooler
2007 Thermo Design Engineering St. Petersburg, Russia Natural Gas Cooler
2007 Ventech Engineers International Trinidad Condenser
2006 Willbros Engineers Longville, LA Natural Gas Cooler
ENGINEERING & CONSTRUCTION INSTALLATIONS
Year Company Locations Service
2010 AG Equipment Pakistan Lube Oil Cooler
2007 Alliance Pipeline Saskatchewan, Canada Natural Gas Cooler
2007 Chesapeake Energy Alvarado, TX Gas Cooler
2010 Compressor Systems Columbia Gas Cooler
2007 El Paso Natural Gas Cheyenne, WY Gas Cooler
2009 Enbridge Pipeline Gordon, TX Condenser
2010 Enterprise Products Yokum, TX Propane Condenser
2008 Exterran Lysite, WY Natural Gas Cooler
2010 Kinder Morgan Snyder, TX1st and 2nd Stage Discharge Cooler, Jacket Water Cooler
2009 Louisville Gas & Electric Muldraugh, KY Jacket Water Cooler
2008 Nicor Gas Troy Grove, IL Natural Gas Cooler
2007 OneOK North Dakota Gas Cooler
2007 Plains Exploration & Production Derby Acres, CA Natural Gas Cooler
2008 Williams Field Services Opal Substation Sweet Gas Cooler
2008 Wyoming Interstate Gas Pueblo, CO Natural Gas Cooler
2008 XTO Energy Emery County, UT Natural Gas Cooler
GAS TRANSMISSION INSTALLATIONS
63
12
S.
39
th W
est
Ave
nue
•
Tuls
a, O
klah
oma
74
13
2
• P
hone
: 9
18
.44
6.4
40
6
• F
ax:
91
8.4
45
.28
57
•
ww
w.s
mit
hco-
eng.
com
•
em
ail:
info
@sm
ithc
o-en
g.co
m MAJOR SUBCONTRACTORS
Subvendor Material Location
Webco Tubes (C.S.) Sand Springs, OK
Tubes, Inc. Tubes (Import C.S., S.S., & Alloys) Sand Springs, OK
Port City Plate Plate (C.S.) Tulsa, OK
American Alloy Plate (C.S. with HIC testing) Houston, TX
Metals, Inc. Plate (S.S. & Alloys) Tulsa, OK
Mattsco Supply Flanges, Pipes, Fittings Tulsa, OK
MATERIALS
Subvendor Component Location
Reliance Electric Motors Tulsa, OK
Cofimco Fans Houston, TX
The Unlaub Co. Drive Components (Dayco, Dodge) Tulsa, OK
Airtech Products, Inc. Louvers Sand Springs, OK
Frank W. Murphy Mfg. Vibration Switches Tulsa, OK
COMPONENTS
Subvendor Fabrication Location
Metal Services Inc. Structural Fabrication & Assembly Tulsa, OK
Lewis Industries Nozzle Assembly Welding Collinsville, OK
Tulsa Gamma Ray RT Tulsa, OK
Precision Heat Treating PWHT Tulsa, OK
Superior Sandblasting Sandblasting, Painting & Zinc Metalizing Sand Springs, OK
AZZ Galvanizing Services Hot Dip Galvanizing Chelsea, OK
FABRICATION ACTIVITIES
Air Tulsa International Airport
SHIPPING
Water Port of Catoosa (Barge to the Mississippi River)
Rail Missouri-Pacific Spur into Facilities
Truck A Choice of Major Contract Freight Firms is Available
Width: 18' – 20' Surrounding States
Length: 60'
Weight: Pre-assembled Units up to 30 Tons
Please contact your Smithco Engineering sales representative for quotes or for more information.