View
3
Download
0
Category
Preview:
Citation preview
HF-8
T_TAL01
T_TAL02
T_TAL03
PAS0104PAS0103
RCH0101
PAM0203
N
S
W E
0 4 km
Bulsa River
O’d
onel
Rive
rBam
bamRiver
Rio Chico River
Abacan River
Proposed Balog-BalogStorage dam
Bulsa dam
Sumoris dam
Cong Dadong dam
Tarlac River
T_TAL01
T_TAL02
T_TAL03
PAS0104PAS0103
RCH0101
PAM0203
N
S
W E
0 4 km
Bulsa River
O’d
onel
Rive
rBam
bamRiver
Rio Chico River
Abacan River
Proposed Balog-BalogStorage dam
Bulsa dam
Sumoris dam
Cong Dadong dam
Tarlac River
Source: JICA Study Team
Annex-F H.2.3.7 Location of Proposed Balog-Balog Storage Dam
PAS0107
PAS0108
PAS0105
PAS0104
PAS0106
N
S
W E
0 4 km
Proposed Gumainstorage dam
Gumain RiverPorac River
Porac dam
Gumain dam
Pasig-Potrero River
PAS0107
PAS0108
PAS0105
PAS0104
PAS0106
N
S
W E
0 4 km
Proposed Gumainstorage dam
Gumain RiverPorac River
Porac dam
Gumain dam
Pasig-Potrero River
Source: JICA Study Team
Annex-F H.2.3.8 Location of Proposed Gumain Storage Dam
HF-9
PAS0107
PAS0108
PAS0105
PAS0104PAS0103
PAS0106
PAM0203
Santo Tomas
Santa Rita
Santa Ana
San Simon
San Luis
Porac
Minalin
Mexico
Magalang
Mabalacat
Guagua
Floridablanca
City Of San Fernando
Cabiao
Bamban
Bacolor
Arayat
Apalit
Angeles City
N
S
W E
0 4 km
Bamban River
Mar
imla
Rive
r
Marimla2 siteBangat3 site
Bang
atRi
ver
Abacan River
Clark main zone
Clark new frontier areaO
’don
elRi
ver
Cong Dadong dam
Rio Chico River
PampangaRiver
PAS0107
PAS0108
PAS0105
PAS0104PAS0103
PAS0106
PAM0203
Santo Tomas
Santa Rita
Santa Ana
San Simon
San Luis
Porac
Minalin
Mexico
Magalang
Mabalacat
Guagua
Floridablanca
City Of San Fernando
Cabiao
Bamban
Bacolor
Arayat
Apalit
Angeles City
N
S
W E
0 4 km
Bamban River
Mar
imla
Rive
r
Marimla2 siteBangat3 site
Bang
atRi
ver
Abacan River
Clark main zone
Clark new frontier areaO
’don
elRi
ver
Cong Dadong dam
Rio Chico River
PampangaRiver
Source: JICA Study Team
Annex-F H.2.3.9 Location of Marimla2 and Bangat3 Sites
HF-10
N
S
W E
0 1 km
Angat Storage DamAngat river
To Bustos dam
Ipo dam
Main Unit(200MW)
To MWSS
Main Pipe
Auxiliary Unit (46MW)
ReleaseRelease tto o IpoIpo1- HPP (Auxiliary Unit)2- Bypass3- Lower discharge pipe4- Spillway
Release to Release to BustosBustos1- HPP (Main Unit)
N
S
W E
0 1 km
Angat Storage DamAngat river
To Bustos dam
Ipo dam
Main Unit(200MW)
To MWSS
Main Pipe
Auxiliary Unit (46MW)
ReleaseRelease tto o IpoIpo1- HPP (Auxiliary Unit)2- Bypass3- Lower discharge pipe4- Spillway
Release to Release to BustosBustos1- HPP (Main Unit)
PAM0503
N
S
W E
0 1 km
PantabanganStorage Dam
Pampanga river
Power house-1(100MW)
Power house-2(12MW)
Masiway dam
Case
cnan
trans
-bas
in
tunn
el
CasecnanHydropower plant(150MW)
PAM0503
N
S
W E
0 1 km
PAM0503
N
S
W E
0 1 km
PantabanganStorage Dam
Pampanga river
Power house-1(100MW)
Power house-2(12MW)
Masiway dam
Case
cnan
trans
-bas
in
tunn
el
CasecnanHydropower plant(150MW)
Source: JICA Study Team
Annex-F H.2.4.1 Existing Hydropower Plants in the Study Area
HF-11
Annex-F H.3.1.1 Water Balance Catchments
HF-12
Angat R.A0
A1
A2
A3
A4
A5
Bustos
Ipo
Angat Dam(Bayabas Dam)
Umiray-AngatTrans-basinP1
(Massim Dam)
P2Cong Dadong
Massim R.
Penaranda
(Balintingon Dam)
P3
P4
P5 Bongabon
Rizal
P6
P7
Casecnan R.
Aguang R.AurolaTrans-basin
CasecnanTrans-basin
PantabanganDam
Umiray R.
Masiway
Sumacubao R.Penaranda R.
P8
P9
P0
Coronell R.
Talavera
Smoris
O’Donnel R.(Balog-BalogDam)
Bulsa
Tarlac R.
S0
Abacan R.
Pasig-Potrero R.Porac R.
Gumain R.
(GumainDam)
S1
S2
S3S4
S5
S6S7
Gumain
Porac
P10
P11
P12
P13
P14
P15 P16
P17
P18
T1T2
T3
Talavera R.
Baliwag R.
Rio Chico R.
Pampanga R.Pasac R.
C1
R1
U1
290(30)
Upper Value: Mean annual average discharge (m3/s)(Lower Value): Mean monthly minimum discharge (m3/s)
6(0.1)
75(13)
9(3)
74(13)
64(12)
58(12)
3(0.1)
5(0.2)
2(0.1)
243(27)
137(19)
105(14)
82(13)
48(5)
35(4)
34(4)
33(4)
105(8)
23(1)
29(4)
16(3)
31(4)
30(4)
20(4)
33(8)
3(2)
41(20)
10(6)
27(12)
5(2)
16(7)
8(3)
16(1)
30(1)
20(1)
LegendControl Point
Existing Storage Dam
Proposed Storage Dam
Diversion Dam
River
Angat R.A0
A1
A2
A3
A4
A5
Bustos
Ipo
Angat Dam(Bayabas Dam)
Umiray-AngatTrans-basinP1
(Massim Dam)
P2Cong Dadong
Massim R.
Penaranda
(Balintingon Dam)
P3
P4
P5 Bongabon
Rizal
P6
P7
Casecnan R.
Aguang R.AurolaTrans-basin
CasecnanTrans-basin
PantabanganDam
Umiray R.
Masiway
Sumacubao R.Penaranda R.
P8
P9
P0
Coronell R.
Talavera
Smoris
O’Donnel R.(Balog-BalogDam)
Bulsa
Tarlac R.
S0
Abacan R.
Pasig-Potrero R.Porac R.
Gumain R.
(GumainDam)
S1
S2
S3S4
S5
S6S7
Gumain
Porac
P10
P11
P12
P13
P14
P15 P16
P17
P18
T1T2
T3
Talavera R.
Baliwag R.
Rio Chico R.
Pampanga R.Pasac R.
C1
R1
U1
290(30)
Upper Value: Mean annual average discharge (m3/s)(Lower Value): Mean monthly minimum discharge (m3/s)
6(0.1)
75(13)
9(3)
74(13)
64(12)
58(12)
3(0.1)
5(0.2)
2(0.1)
243(27)
137(19)
105(14)
82(13)
48(5)
35(4)
34(4)
33(4)
105(8)
23(1)
29(4)
16(3)
31(4)
30(4)
20(4)
33(8)
3(2)
41(20)
10(6)
27(12)
5(2)
16(7)
8(3)
16(1)
30(1)
20(1)
LegendControl Point
Existing Storage Dam
Proposed Storage Dam
Diversion Dam
River
LegendControl Point
Existing Storage Dam
Proposed Storage Dam
Diversion Dam
River
Source: JICA Study Team
Annex-F H.3.1.2 Control Points and Discharge in Quasi-Natural Flow Condition
HF-13
Angat R.A0
A1
A2
A3
A4
A5
Bustos
Ipo
Angat Dam(Bayabas Dam)
Umiray-Angat Trans-basinP1
(Massim Dam)
P2Cong Dadong
Massim R.
Penaranda
(Balintingon Dam)
P3
P4
P5 Bongabon
Rizal
P6
P7
Aguang R.Aurola Trans-basin
CasecnanTrans-basin
Pantabangan Dam
Umiray R.
Masiway
Penaranda R.
P8
P9
P0
Coronell R.
Talavera
Smoris
O’Donnel R.(Balog-Balog Dam)
Bulsa
Tarlac R.
S0
Gumain R.
(Gumain Dam)
S1
S2
S3S4
S5
S6S7
Gumain
Porac
P10
P11
P12
P13
P14
P15 P16
P17
P18
T1T2
T3
Talavera R.
Baliwag R.
Pampanga R.Pasac R.
C1
R1
U1
39.695.6
111.6
Upper Value: Quasi-Natural discharge (m3/s)Middle Value: with Existing Storage dams (m3/s)Lower Value: with Existing + Proposed Storage dams (m3/s)
0.120.120.12
19.364.469.6
3.13.16.7
19.064.269.3
17.562.664.8
17.062.164.3
0.20.23.1
0.250.250.25
0.10.12.5
35.591.5
105.2
25.081.094.7
19.075.175.1
16.7 72.772.7
7.363.463.4
5.261.261.2
5.161.161.1
5.061.161.1
3.33.33.3
1.31.31.3
4.34.34.3
3.53.53.5
5.35.3
19.0
5.35.3
19.0
4.64.6
18.3
9.29.29.2
1.31.31.3
19.919.923.5
5.35.35.3
12.212.215.8
2.42.42.4
6.36.39.9
2.92.96.5
1.31.31.3
2.42.4
20.0
1.41.4
19.0
LegendControl Point
Existing Storage Dam
Proposed Storage Dam
Diversion Dam
River
Sumacubao R.
Source: JICA Study Team
Annex-F H.3.1.3 Surface Water Resources Potential (Equivalent to 80% Reliability) with Existing and Proposed Storage Dams at Control Points
HF-14
Annex-F H.3.1.4 Sub-Areas for Groundwater Availability in the Provinces of Bulacan, Pampanga, Nueva Ecijia and Tarlac
HF-15
UPRIISDiv-V
(16,879ha)
UPRIISDiv-I
(16,400ha)
UPRIISDiv-II
(22,591ha)
AMRISLeft Bank
(10,128ha)
AMRISRight Bank(16,663ha)
Pantabangan Dam
Masiway Dam
Rizal Dam
Angat DamBustos Dam
Super Diversion Canal
UPRIISDiv-I
(4,120ha)
Talavera Dam
Pam
pang
a R
iver
Maasim River
Manila bay
PDRIS(6,604ha)
Angat River
TASMORIS(4,200ha)
Tarla
c R
iver
O'D
onne
l Riv
er Smoris Dam
Taris Dam
Porlac RIS(1,458ha)
Gumain RIS(1,629ha)
Gumain Dam
Solib Dam
Porlac Dam
Gumain River
Porlac River
Chi
co R
iver
Tala
vera
Riv
er
UPRIISDiv-III
(25,881ha) AuloSRIP
(810ha)
UPRIISDiv-IV
(19,924ha)
Aulo Dam
Aulo River
Penaranda River
PenarandaDam
Bongabon (Atate) Dam
Cong Dadong Dam
Source : JICA Study Team
Annex-F H.3.2.1 Schematic Flow Diagram of Existing NIS
HF-16
UPRIISDiv-V
(37,200ha)
UPRIISDiv-I
(16,400ha)UPRIIS
Div-II(22,591ha)
UPRIISDiv-III
(25,881ha) AuloSRIP
(810ha)
AMRISLeft Bank
(10,128ha)
AMRISRight Bank(16,663ha)
UPRIISDiv-IV
(19,924ha)
Pantabangan Dam
Masiway Dam
Rizal Dam
Aulo Dam
Angat DamBustos Dam
Super Diversion Canal
Aulo River
Penaranda River
UPRIISDiv-I
(4,120ha)
Talavera Dam
Pam
pang
a R
iver
Maasim River
PenarandaDam
Bongabon (Atate) Dam
Manila bay
PDRIS(6,604ha)
Angat River
TASMORIS(39,150ha)
Tar
lac
Riv
er
O'D
onne
l Riv
er
Smoris Dam
Taris Dam
Porlac-Gumain
(16,750ha)
Gumain Dam
Solib Dam
Porlac Dam
Gumain River
Porlac River
Chi
co R
iver
Tal
aver
a R
iver
Balog-Balog Dam
Gumain Reservoir
Balintingon Dam
Balintingon(14,900ha)
Diversion Dam
Cong Dadong Dam
Existing Dam
Proposed Dam
Source : JICA Study Team
Annex-F H.3.2.2 Schematic Flow Diagram of Projected NIS
HF-17
Annex-F H.3.3.1 Evaluation of Groundwater Usage Condition in Present Condition (2008)
HF-18
Annex-F H.3.3.2 Evaluation of Groundwater Usage Condition in Future Condition (2025)
HF-7-19
Source: JICA Study Team
Annex-F H.3.3.3 MODSIM Model Setup for Water Balance Simulation for Present Condition (2008)
HF-7-20
Source: JICA Study Team
Annex-F H.3.3.4 MODSIM Model Setup for Water Balance Simulation for Future Condition (2025)
HF-21
0.0
5.0
10.0
15.0
20.0
25.0
30.0
35.0
40.0
45.0
Jan Feb May Apr Mar Jun Jul Aug Sep Oct Nov Dec
Total Deficit
Total Demand
Dis
char
ge(m
3 /s)
Source: JICA Study Team
Annex-F H.3.3.5 Total Demand and Average Total Deficit for CISs and Other Agricultural Water Use such as Fresh Water Aquaculture in Present Condition
0.0
100.0
200.0
300.0
400.0
500.0
600.0
700.0
Jan Feb May Apr Mar Jun Jul Aug Sep Oct Nov Dec
Present Condition
Quasi-Natural Flow Condition
Dis
char
ge(m
3 /s)
Source: JICA Study Team
Annex-F H.3.3.6 Simulated Average Monthly Flow Pattern in Present Condition and Quasi-Natural Condition at around the Intake of Cong Dadong dam in the Pampanga River
HF-22
Annex-F H.4.2.1(1/2) Location of Projects in Water Resources Development, Allocation and Distribution
HF-23
Annex-F H.4.2.1(2/2) Location of Projects in Water Resources Development, Allocation and Distribution
HF-24
Angat R.A0
A1
A2
A3
A4
A5
Bustos
Ipo
Angat Dam(Bayabas Dam)
Umiray-Angat Trans-basinP1
(Massim Dam)
P2Cong Dadong
Massim R.
Penaranda
(Balintingon Dam)
P3
P4
P5 Bongabon
Rizal
P6
P7
Aguang R.Aurola Trans-basin
CasecnanTrans-basin
Pantabangan Dam
Umiray R.
Masiway
Sumacubao R.Penaranda R.
P8
P9
P0
Coronell R.
Talavera
Smoris
O’Donnel R.(Balog-Balog Dam)
Bulsa
Tarlac R.
S0
Gumain R.
(Gumain Dam)
S1
S2
S3S4
S5
S6S7
Gumain
Porac
P10
P11
P12
P13
P14
P15 P16
P17
P18
T1T2
T3
Talavera R.
Baliwag R.
Pampanga R.Pasac R.
C1
R1
U1
LegendControl Point
Existing Storage Dam
Proposed Storage Dam
Diversion Dam
River
3116
Pantabanganstorage dam
NIA-UPRIIS
NIA-AMRIS
MWSS Angatstorage dam
NIA-PDRIS
Key HMS
NIA-TASMORIS
NIA-Porac-Gumain
Source: JICA Study Team
Annex-F H.4.3.1 Tentatively Proposed Monitoring Stations for Surface Water
Sector H Water Resources Development and ManagementAnnex-FiguresAnnex-F H.2.3.8 Location of Proposed Gumain Storage DamAnnex-F H.2.3.9 Location of Marimla2 and Bangat3 SitesAnnex-F H.2.4.1 Existing Hydropower Plants in the Study AreaAnnex-F H.3.1.2 Control Points and Discharge in Quasi-Natural Flow ConditionAnnex-F H.3.1.3 Surface Water Resources Potential (Equivalent to 80% Reliability)with Existing and Proposed Storage Dams at Control PointsAnnex-F H.3.1.4 Sub-Areas for Groundwater Availability in the Provinces of Bulacan, Pampanga,Nueva Ecijia and TarlacAnnex-F H.3.2.1 Schematic Flow Diagram of Existing NISAnnex-F H.3.2.2 Schematic Flow Diagram of Projected NISAnnex-F H.3.3.1 Evaluation of Groundwater Usage Condition in Present Condition (2008)Annex-F H.3.3.2 Evaluation of Groundwater Usage Condition in Future Condition (2025)Annex-F H.3.3.3 MODSIM Model Setup for Water Balance Simulation for Present Condition (2008)Annex-F H.3.3.4 MODSIM Model Setup for Water Balance Simulation for Future Condition (2025)Annex-F H.3.3.5 Total Demand and Average Total Deficit for CISs and Other Agricultural Water Usesuch as Fresh Water Aquaculture in Present ConditionAnnex-F H.3.3.6 Simulated Average Monthly Flow Pattern in Present Condition and Quasi-NaturalCondition at around the Intake of Cong Dadong dam in the Pampanga RiverAnnex-F H.4.2.1(1/2) Location of Projects in Water Resources Development, Allocation and DistributionAnnex-F H.4.3.1 Tentatively Proposed Monitoring Stations for Surface Water
Recommended