STANDARD DRAWINGS

December 2008 Standard Specifications

Rev. 0

I N D E X

DISTRICT STANDARD DRAWINGS INSTALLATION DETAILS

Drawing No. Description AV-1-08 1" and 2" Air Valve BP-1-08 Backflow Preventer, Reduced Pressure Assembly, 2” and Smaller Service BP-2-08 Backflow Preventer, Reduced Pressure Assembly, 3” and Larger Domestic

Service BP-3-08 Backflow Preventer, Reduced Pressure Assembly, 3” and Larger Fire Service CL-1-08 Clearance Requirements for Water Mains from Other Utilities and Structures CL-2-08 Horizontal and Vertical Clearance Requirements between Water Mains and

Sanitary Sewers CL-3-08 Horizontal and Vertical Clearance Requirements between Water Mains and Storm

Drains CL-4-08 Clearance Requirements for Water Mains, Services and Other Facilities CL-5-08 Clearance Requirements for Meter, Vault and Other Facility Installations ET-0-08 Electrolysis Test Station General Notes ET-1-08 Electrolysis Test Station Bonding Wire and Test Lead Connections for Steel Pipe ET-2-08 Electrolysis Test Station Steel Pipe Calibration Span ET-3-08 Electrolysis Test Station Marker Post Installation Details Undeveloped Areas ET-4-08 Electrolysis Test Station Developed Areas ET-5-08 Electrolysis Test Station Steel Pipe Encasement Test Station ET-6-08 Electrolysis Test Station Insulating Joint Test Station, Non-insulating Joint

Bonding and Flanged Joint Bonding on Steel Pipelines ET-7-08 Electrolysis Test Station Anode Connection FH-1-08 Fire Hydrants FH-2-08 Fire Hydrant Locations JP-1-08 New Main Jumper Piping MP-1-08 Marker Post and Curb Markings S-1-08 1" Service Line for 3/4" and 1" Meters without Fire Sprinkler Connections S-2-08 1-1/2" and 2" Service Lines, 1-1/2” and 2” Meters without Fire Sprinkler

Connections S-3-08 1” Service Line, 3/4" and 1" Meters without Fire Sprinkler Connections S-4-08 1-1/2" Service Line and Meter in Dual Meter Box for Residences with Fire

Sprinklers

December 2008 Standard Specifications

Rev. 0

I N D E X

DISTRICT STANDARD DRAWINGS INSTALLATION DETAILS

Drawing No. Description S-5-08 1-1/2" Service Line and 1" Meter in Dual Meter Box for Residences with Fire

Sprinklers S-6-08 1-1/2" Service Line and 1" Meter in Single Meter Box for Residences with Fire

Sprinklers S-7-08 1" Service Line and Meter in Dual Meter Box for Residences with Fire Sprinklers S-8-08 1" Service Line and Meter in Single Meter Box for Residences with Fire

Sprinklers S-9-08 Typical Steel Service Lateral S-10-08 2” Service Line and Detector Check Valve S-11-08 Address Labels and Markings for 1” through 2” Service Lines SP-1-08 Water Quality Sampling Pipe Assembly (Temporary - for Water System

Construction) TB-1-08 Thrust Blocking for PVC Pipe Valve Clusters TB-2-08 Thrust Blocking for PVC Pipe Horizontal Fittings TB-3-08 Standard Blowoff for 6" and 8" PVC Mains TB-4-08 Standard Blowoff for 10" and 12" PVC Mains TW-1-08 Tracer Wire for Mains and Valves TW-2-08 Tracer Wire for Service Lines V-1-08 Line Butterfly Valve V-2-08 Line Gate Valve VB-1-08 Valve Box WSP-1-08 Steel Pipe Welded Joints WSP-2-08 Welded Steel Offset on PVC Pipe