Status and possibilities for the irradiation facility in the PS East Hall
Michael Moll, Maurice Glaser
10 March 2010 – IRRAD Working Group
- some notes for discussion -
CERN PS East Hall - Irradiation Facilities
24 GeV/c protons
T7 & T8 beam lines in East Area
· Proton irradiations · Direct exposure to 24 GeV/c protons
(IRRAD1, IRRAD3, IRRAD5)
· Low intensity radiation field of backscattered particles (SEU and Dosimeter testing) (IRRAD6)
· Neutron (mixed field) irradiations · Mixed field produced in cavity after
carbon (50cm) iron (30cm) lead (5cm) ‘target’ (IRRAD2)
Summary of present beam properties
· Proton irradiation facility· 24 GeV/c protons (in spills of ~ 21011 p over 400 ms), ~ 2 x 2 cm2 beam spot,
flux: ~ 1 - 5 1013 p cm-2 h-1
· Shuttle system (10x10x20 cm3) and irradiation tables/boxes for bigger objects
· Neutron irradiation field· complex irradiation field dominated by neutrons,
flux: ~ 2 107 n cm-2 s-1 ( En > 1 MeV ) at 50 cm position
CERN PS Facilities – Operation 2009
· Operation in 2009 (M.Glaser) -- only proton facility operated· 142 days of proton beam to facility· 431 objects irradiated· 337 dosimeter measurements performed (mainly spectrometry of Al foils)
· Most complex irradiations· 12 CMS ECAL & Crystal Clear scintillating crystals (get highly activated)· ATLAS silicon sensors for SLHC (cooling to low temperatures during irradiation)· Optical link system R&D for SLHC (system in operation during irradiation)
· Main part of irradiations performed for· ATLAS, CMS, LHCb· RD39, RD41, RD50, RADMON
· Operation in 2010 (M.Glaser) · expect about 150 days of operation (as in 2009)· 3 weeks of pion beam at the PSI (~280 MeV/c.) + 1 week of setup
M.Glaser, 19th DT coordination meeting (PS-Irrad & GIF) 20/8/2009
Example: 8/09 ATLAS optical links
· LHC Experiments • Atlas Upgrade (Ohio University, K.K. Gan)
• IRRAD1
• IRRAD3
· Participants in upgrade activities· M.Glaser & M.Moll (less than 10% FTE each)· 2009: Fabio Rivero : Student, 4 months, working on general facility services (funded by WP7)
· Activities· Participation in CERN wide ‘Irradiation Facilities Working Group’ and in particular evaluation of
future hadron irradiation facilities (see http://www.cern.ch/irradiation-facilities )· Planning and construction of new irrad. tables and cold box systems (to be continued in 2010)
· 2010· WP7 funding for student (8 months)· Finalization of irradiation table systems· Re-evaluation of plans for future hadron irradiation facilities at CERN and in particular EAST
HALL FACILITIES in light of last Chamonix Meeting outcome • New plans for upgrade of injector complexes: no PS2; PS to be used for another 25 years, ….• New timing for LHC upgrade: more time to set up proper irradiation facilities (??)
Activities - Upgrade of Hadron Facilities
Vortex coolingtested….
to be continuedin 2010
New installations 2009/2010: Irradiation Tables and Irradiation boxes
New installations 2009/2010: Irradiation Tables and Irradiation boxes
Table support system inside facility
Table with ATLAS Tracker cold box
mounted
Table with ATLAS Pixel cold box mounted
inside area(Vortex cooling test)
IRRAD 3
IRRAD 7
M.Glaser & M.Moll, 6th LHC Radiation Workshop, 31.11.2007 -9-
Proposal for facility upgrade
· Present limitations and drawbacks· Irradiation tables are located inside the beam line complex (primary zone)
Access to primary zone needed to enter
Very restricted space, Backscattered particles superimpose primary beam
Personnel exposed to radiation (activated material around irradiation tables – e.g. magnets)
· Neutron facility parasitic to DIRAC
Parasitic operation strongly limits flexibility
· Proton & Neutron facilities located in different beam lines
Parallel operation of two facilities difficult
Proton and Neutron facility ‘competing’ for beam
· Proposal: Proprietary beam line for irradiations· Combine proton and neutron irradiation facilities in one beam line
· Increase space for irradiation areas (less background, less exposure to radiation of personnel)
· Place facility in secondary zone (outside beam line complex)
· Allow access with big objects to the neutron irradiation facility
· Requires termination of DIRAC experiment in T8 beam line
slide from 2007
M.Glaser & M.Moll, 6th LHC Radiation Workshop, 31.11.2007 -10-
PS East Hall – Proposal for facility upgrade
Protons (Shuttle)
Protons (Tables, Boxes)
Neutron field with rail system
for heavy objects and remote access
Neutrons (shuttle)
slide from 2007
Restructuring of the East AreaLau Gatignon
IEFC Workshop – Feb. 2010
Restructuring of the East AreaLau Gatignon
IEFC Workshop – Feb. 2010
What happened to IRRAD1 ?
Restructuring of the East AreaLau Gatignon
IEFC Workshop – Feb. 2010
Remarks for discussion
· PS will be consolidated and continue to operate for many years · Long term investments into irradiation facilities are justified again
· No visible end to operation of DIRAC· Need to wait for DIRAC to stop dating data and dismantle (maybe years ahead to wait …?)· Write a counter proposal to take over the DIRAC area ?
· East area will be restructured· What will happen to the irradiation facilities ?· Are we missing the opportunity for a proper planning of the facilities upgrade?
· Some funding might become available through the AIDA proposal· Requested funds for the facilities: 0.5 Meuros (EU) + 1.5 Meuros (partners)· Need to better communicated with EN to understand what kind of measures
could be taken to increase the proton intensity in the irradiation facility … … How to do? … to be discussed today …
· Needs re-enforcement of man-power (and commitment) on PH side (for facilities operation or upgrade activities)
Recommended