SMA Solar Technology

1

Sunny Boy 1Webinar en Español28 de Marzo 20118 am a 4 pm (hora de San Francisco, CA)Presentador : Antonio Gomez , Solar Academy, SMA AmericaRocklin, CaliforniaUSAAntonio.Gomez@SMA-America.com

Sunny Boy 1 Agenda

2

> Brief introduction to SMA

> Course Content1. Components and operation of a Grid Tied Photovoltaic System2. Safety Basics3. SMA inverters4. System Design for a residential application5. Installation, commissioning and troubleshooting

What does SMA Solar Technology AG Stand For?

> It is a German acronym that describes 3 different technology disciplines:

System Mess Anlagentechnik

AktienGesellschaft

System – Computer Control

Mess – Instrumentation or Measuring technology

Anlagentechnik – Plant System technology

3

SMA Around the World

4

SMA America HQ Rocklin, CA

SMA Manufacturing Plant , Denver, CO

Toronto, Canada

SMA HQ main entrance , Kassel, Germany

5

SMA America, LLC

> Founded in Grass Valley 2000

> Moved to Rocklin in May 2008

> 200,000+ inverters installed in the U.S.

6

New SMA America Headquarters in Rocklin, CA

7

New SMA America Headquarters in Rocklin, CA

8

9

Solar Academy Course Structure

Non-Technical -------------------------------------------------Expert Technical

Sales & MarketingSales Focus

Sunny Boy 1Grid Tied Single Phase

Intro to SMA ProductsProduct Focus

Intro to PVBasic Technical

Sunny Central 1Central Inverter

Sunny Island 1Grid-Tie Backup

Sunny Boy 2Grid Tied 3-Phase Focus

Revenue GradeMeteringAdvanced Comms

WebBoxMonitoring & DataLogging (Advanced)

CommunicationsMonitoring & Data Logging (Basic)

Sunny Central 2Utility Scale Applications

Sunny Island 2Off Grid

US Production Facility

> Manufacturing Plant in Denver, CO

> Production capacity up to1GW in the first stage

> 100s of US jobs created

> American Reinvestment & Recovery Act compliant

10

Grid Tie Photovoltaic Systems

11

Oregon State Capitol, Salem, USA

Parts of a Grid Tie PV system

Question:

What is the largest component of any

grid tied solar system?

12

1. The Sun

13

> Produces 386 billion billion Megawatts of energy every second

> 15 minutes of sunlight > total consumption of all other forms of energy usedin 1 year by all mankind

> 5 billion year warranty

2. Solar Cell – The Smallest Component

14

Solar Cell Cross Section

15

ThicknessOf

HumanHair

[P]

[B]

From Cell to Array

16

Cell

String

Module

Array

3. Inverter

17

AC

Inverter

+

-

DCL1

L2

Irradiance, Current and Voltage

18

Am

ps

Volts

Irradiance in W/m2

19

Impact of temperature on voltage

P(W) = E(V) x I(A)

Voltage depends on temperature

Current Depends

on Irradiance

20

Maximum Power Point Tracking (MPPT)

MPPT on Shaded vs. Partially Shaded Strings

21

Pow

er

Voltage

Not Shaded

Partially Shaded

22

SMA OptiTrac

Other MPPT systems

4. Bi-Directional Meter – Net Meter kWh

23

24

Components of a Grid Tied PV

PVArray

DCDisconnect

ACDisconnect

ACDistribution

Panel

Meter

25

Grid Tied PV Components in Operation

2 pole40A

26

Inverter Topologies

Low Frequency Transformer

27

MPPT Bridge Transformer Grid

Extracts maximumPower from the PV

Converts DC to AC

Provides insulation between

DC and AC

28

IGBT Bridge of a Sunny Boy 7000 US

LF Transformers

29

SB 3000 USSB 3800 US SB 4000 US

SB 5000 USSB 6000 USSB 7000 USSB 8000 US

30

High Frequency Transformer

DC AC DC AC

Sunny Boy 2000HF-US, 2500HF-US, 3000HF-US

31

Transformerless Inverter

32

Sunny Boy TL-US Series 8000, 9000, 10000

DC and AC Inputs to SB 7000US

34

DC AC

Solar Modules

Grid

Sunny Boy Inverters are Current Sources

35

L

N

AC Voltage

ANSI Grid Voltage Ranges and Tripping Voltages

36

240V

Inverter Tripping (-12 %)

ANSI Range A (+5%)

ANSI Range A (-5%)

228.6 252

252228.6

254

254.4208.8

Inverter Operating Voltage(Vac – Min)

Inverter Operating Voltage(Vac – Max)

ANSI Range B (-13%)

ANSI Range B(+ 6 %)

211 264

Inverter Tripping (+ 10 %)

264

37

LooseContact

Insufficient Wire Size

LooseContact

LooseContact

Bad Breaker

Likely Spots for High Impedance

Tighten AC connections at 18 in-lb

www.SMA-America.com

38

www.SMA-America.com

39

Voltage Drop Calculator

40

Grid Protective Functions

1. Anti Islanding

> Required by UL 1741 (IEEE 929)

> Protects people and property

2. Over / Under Voltage

3. Over / Under Frequency

41

Protects quality of grid

42

T1 T2

Anti-Islanding : Grid Guard Monitoring

Grid Voltage

Inverter Current

43

Inverter response to grid Failure

Inverter disconnects from the grid within 160ms

Loss of Grid

Inverter Current

Grid Voltage

Connecting Grid tied inverters to Generators

44

240 VAC

45

Over and Under Voltage Monitoring

ANSI Grid Voltage Ranges and Tripping Voltages

46

240V

Inverter Tripping (-12 %)

ANSI Range A (+5%)

ANSI Range A (-5%)

228.6 252

252228.6

254

254.4208.8

Inverter Operating Voltage(Vac – Min)

Inverter Operating Voltage(Vac – Max)

ANSI Range B (-13%)

ANSI Range B(+ 6 %)

211 264

Inverter Tripping (+ 10 %)

264

Over / Under Voltage Monitoring

47

Front Panel LEDs

48

BLINKING YELLOW INDICATES A FAILURE

Practices to avoid premature tripping

> Size the AC wiring for a 1% voltage drop (raise)

> Tighten all AC connections

> Use wet location rated wire nuts

49

Over / Under Frequency Monitoring

50

Required by UL and IEEE

59.3 to 60.5

> AC Disconnect or Breaker is OFF

> Grid is Down

> Frequency of the grid is 0Hz because the grid voltage is 0V AC

51

Most common reasons for Fac error code

PV array Go - No Go test measurements

53

1) Open Circuit Voltage has to be higher than the inverter PV start Voltage (For example 228VDCfor SB 3000 and 285VDC for SB 4000 US).

2) Voltage between positive and ground and negative and ground has to be zero or less than ~12 volts bleeding down to zero.

Insufficient Voc for SB 3000US (228V DC)

54

40 V 40 V

Voc = 200 VDC

40 V

40 V

40 V

+ - Voc = 350 VDC

Acceptable Open Circuit Voltage

No Ground Fault

56

70 V 70V 70 V 70 V 70 V

0 V

+ -

140 V 210 V

Ground Fault

57

Disconnecting a PV array under load at 600 VDC 20 Amp

Bi-directional Battery Inverter: Grid Tied Back Up

58

Sunny Island 5048U

59

> Creates micro grid when utility grid is lost

> Requires 48V DC battery bank

> Sunny Boys, if used, are AC coupled to the Sunny Island

> Solar modules cannot be directly connected to the Sunny Island!

Grid-Tied Back up with Sunny Boy: Grid is Present

60

L2

120 VAC

61

Grid-Tied Back up with Sunny Boy: Loss of Grid

62

L1

L2

120 VAC

120 VAC

Grid-Tied Back up with Sunny Boy: Grid Returns

Safety Basics: PV, Hazards, Practices, PPE

> Non Electrical Hazards:

> Exposure to Mother Nature- hydrate, sunscreen, protective clothing

> Snakes, bugs and rodents

> Cuts and bumps

> Falls, strains and sprains

> Burns- thermal and chemical

> Repetition

63

Safety Hazards

64

> Electrical Hazards

> Shock- DC and AC

> Arc- could cause burns

> Blast- vapors, impact injury, hearing loss

Electrical Shock Thresholds

65

Reaction 60 Hz AC Amps

DCAmps

Tingle, warmth .001 .006

Shock; reflex may cause injury

.002 .009

Severe Shock; cannot let go

.02 .09

Ventricular Fibrillation

.1 .5

Heart Frozen >1 >1

Electrical Safety Practices

> Good work habits

> Clean working area

> Awareness of hazards

> CPR certification

> Adherence to company safety practices

> Knowledge, compliance and proper execution of Code

> Article 240 – Overcurrent protection

> Article 250 – Grounding

> Article 300 – Wiring methods

> Article 339 – Underground feeders

> Article 690 – Solar Photovoltaic Systems

> Article 705 – Interconnected power sources

66

Electrical Safety: Tools

67

> Multimeter

> Megger

> Hot Stick

> Cell Phone

> Fire Extinguisher (Class C)

> Listed Torque Drivers

Electrical Safety: Personal Protective Equipment

68

> Helmet

> Gloves

> Footwear

> Eye Protection

UL Listing

69

> All SMA inverters sold in the US and Canada are listed under the UL 1741 standard

UL.com

70

Enter SMA’s UL NumberE210376

SMA Inverter UL Listing

71

Sunny Boy 3000 US

> 3000 Watts

> DC Switch Included

> 208V AC and 240V AC

> Auto voltage sensing

> 96.6% Max 95.5% CEC

> Compatible with Positive and Negative to ground modules

72

Sunny Boy 4000 US

> 4000 Watts

> DC Switch Included

> 208V AC and 240V AC

> Auto voltage sensing

> 96.6% Max 95.5% CEC

> 10 year warranty

> Compatible with Positive and Negative to ground modules

> SB 3800US (3800W Max output)

> Uses 2 pole 20A breaker

> Ideal for 100A panels

73

Sunny Boy 5000US

74

> 5000 Watts

> DC Switch Included

> 208/ 240 / 277 VAC

> Manually selected

> 96.8% Max 95.5% CEC

> 10 year warranty

> MPPT: 250 - 480V DC

> Compatible with Positive and Negative to ground modules

Sunny Boy 6000US

75

> 6000 Watts

> DC Switch Included

> 208/ 240 / 277 VAC

> Manually selected

> 97% Max 95.5% CEC

> 10 year warranty

> MPPT: 250 - 480V DC

> Compatible with Positive and Negative to ground modules

Sunny Boy 7000US

76

> 7000 Watts

> DC Switch Included

> 208/ 240 / 277 VAC

> Manually selected

> 97.1% Max 96% CEC

> 10 year warranty

> MPPT: 250 - 480V DC

> Compatible with Positive and Negative to ground modules

Sunny Boy 8000US

77

> 8000 Watts

> DC Switch Included

> 240 or 277 VAC only

> Manually selected

> 97.1% Max 96% CEC

> 10 year warranty

> Positive/Negative to Ground modules

> MPPT: 250 - 480V DC

> PV start: 365V DC

Inverter models and AC operating voltages

78

SB 3000 US SB 4000 US

208V / 240V

Automatic Voltage Sensing

SB 5000 USSB 6000 USSB 7000 US

208V / 240V / 277V

Manual Voltage Selection

SB 8000 US

240V / 277V

Manual Voltage Selection

Sunny Boys in Single and Three Phase Systems

79

> Sunny Boys are single phase inverters but can operate in either Single Phase or Three Phase systems

Utility Transformers

80

Commercial Residential

CommercialAgricultural

Commercial Commercial

Commercial

81

Inverter Configuration

Default Inverter Settings

82

1. Jumper Configuration: Look for Neutral

2. Ground Fault Detection Interrupt (GFDI) Fuse: Negative to Ground

3. Voltage Selection: 240V AC (SB 5,6, 7, & 8000 US only)

Neutral Configuration Jumpers

83

Neutral Configuration Jumper

84

Look for a Neutral

If the jumpers are incorrectly configured

the inverter will flag the error:

Disturbance: Grid Time Out

85

Positive to Ground Module Compatibility

86

ALL Sunny Boy Inverters are

UL Listed for use with

POSITIVE to GROUND Modules

Default Negative to Ground

87

1. GFDI Fuse on top2. Jumper on top

Color of Grounded Conductor

> NEC 200.6(A)

> An insulated grounded conductor of 6 AWG or smaller shall be identified by a continuous white or gray outer finish or by three continuous white stripes on other than green insulation along its entire length.

88

Negative to Ground DC Disconnect Connections

89

Negative to Ground Inverter DC Connections

90

Field Programmable to Positive to Ground

91

1. GFDI Fuse on bottom2. Jumper on bottom

Positive to Ground DC Disconnect Connections

92

Positive to Ground Inverter DC Connections

93

SB 5,6,7,8000 US: Pull both fuse holders

94

Swap fuse holders and reinsert

95

Swap jumper to left position

96

> Negative to Ground:Fuse / Jumper on Right

> Positive to Ground:Fuse / Jumper on Left

Grid Voltage Selector: Default 240 V

97

Incorrect Voltage Selection

98

Sunny Boy AC Terminal Blocks

99

SB 3000US, 3800US & 4000US

100

SB 5000US, 6000US & 7000US

101

Grounding

102

103

Grounding

> Several Articles cover grounding system [NEC 250 & 690]

> Equipment Grounding

> DC Grounding Electrode and GEC

> Grounding Single Sunny Boy

> Grounding Multiple Sunny Boys

104

Equipment Ground

> The Protected Earth (PE) terminal of the inverter is for the termination of the equipment grounding conductor [NEC 690.43 – 46]

> All DC and AC equipment is grounded including:

> PV module frames

> DC disconnect

> Inverter Chassis

> AC disconnect

> AC ground bus in AC distribution panel

Grounding Electrode

105

> Required by NEC 690.47

> The Grounding Electrode (GE) and Grounding Electrode Conductor (GCE) are used to bond the grounded conductor to Earth Ground.

> Use NEC 250.66 (AC) & 250.166 (DC) to correctly size the GEC based on the GE system being used.

PE Terminal vs.Grounding Electrode Terminal

106

Equipment Ground GEC Terminal

107

Grounding

> For a Single SMA Inverter

> DC Ground Rod is not required

> Use continuous #8 AWG bare or insulated conductor

> Connect Ground Terminal to AC ground rod

> You can route with the AC conductors, but do not attach or splice at the service panel(s)

> If the ground rod is unavailable, irreversibly splice to the AC GEC

> If you have a non-rod AC GE, use appropriate size conductor

> See [NEC 250.166] for alternate size requirements

108

Single Inverter Grounding Method 1

PVArray

DCDisconnects

ACDisconnects

ExistingAC

ServiceEquipment

PV Inverter

690.47(C)(1) 690.47(C)(2)

Optional 250.54SupplementaryGrounding Electrode(Lightning Protection)

NewDC GroundingElectrode

ExistingAC GroundingElectrode

109

Single Inverter Grounding Method 2

PVArray

DCDisconnects

ACDisconnects

ExistingAC

ServiceEquipment

PV Inverter

Optional 250.54SupplementaryGrounding Electrode(Lightning Protection)

ExistingAC GroundingElectrode

Unspliced8 AWGConductor

Serves asAC and DC

GEC

110

Grounding

> For Multiple Sunny Boy Inverters

> Use a DC Grounding Electrode (ground rod)

> Run a #6 AWG from the DC GE to the AC GE

> This line will become a GEC for the inverters

> Run a short #6 AWG jumper to each inverter

> This line must be irreversibly spliced to the GEC

> If the AC or DC Grounding Electrode is not a rod type increase the GEC to the appropriate size

> [NEC 250.66 & 250.166] will determine the correct size

111

Multiple Inverter Grounding Method

Inverter 1 Inverter 2 Inverter 4Inverter 3

Connection ofGEC taps IAW250.6(C) and (D)

Irreversible Splices

112

Grounded PV Arrays

> NEC 690.41-45 describes the requirements for system grounding of PV arrays.

> Sunny Boy Inverters comply and include the GFDI circuitry required by [NEC 690.5 or NEC 690.35(C)]

> Intentionally grounding the PV grounded or ungrounded conductors outside the inverter will blow the GFDI fuse.

113

Ungrounded PV Arrays: NEC 2005 [690.35]

> The DC disconnect must break all conductors

> Overcurrent protection, when required, must be installed on all source circuit conductors

> Ground Fault Protection is still required

> PV source and output circuit conductors must be multi-conductor and double insulated ; labeled PV Wire

> Red and Black color coding

As of August 2008

114

All Sunny Boy inverters ship with a DC ONLY disconnect.

This DC disconnect model is used for all Sunny Boy US Series.

(SB TL-US inverters have their own specific disconnect)

Large Field Wiring Area

115

Knockouts on sides, bottom and back panel of disconnect

(6 total)

Handle Removal

116

Handle must be in the OFF position to remove handle

Screw slot coveredin the ON position

117

Handle Removal

Standard #2 Philips screwdriver

Handle retains screw

118

Equipment Ground Wire to the Inverter

L1 L2 N PE

Dedicated Equipment Ground wire to the Inverter.

3 grounding terminals total

119

Fuse Number matches the Terminal Number

Removing a blown fuse shows the string number that caused the fault

DC Terminal Labels

120

Direct connection to string terminals

121

20 AmpMaximumFuse Rating

1

2

3

4

SB US Series DC Disconnect Schematic

122

Frequently Asked Question

123

What can I do if I have more strings on my array

than terminals in the SMA DC Disconnect?

SMA Combiner Boxes

124

36 Amp Combined input from a Combiner Box

125

SMA DC Disconnect

To grounded conductor terminal

Combined DC Input Terminal up to 36 Amps

126

Combiner Box Ungrounded

Wire

Combiner Box Grounded

Wire

Wire size10 to 6 AWG

3 Grounding Terminals

127

Equipment Ground

Ground Rod at the inverter

Photovoltaic Modules and Array Design

128

Courtesy: Freedom Power, LLC; Shreveport, LA

27 Sharp 235 modules2 SB 3000US

SolarHot 4' x 10‘Platinum collector

Solid Green LED

129

Solid Green

MPP MODE

Laboratory Conditions vs. Reality

130

1 Module = 100 watts (STC) at 25°C (78°F)

1 Module = ~80 Watts at 50°C

*GEPV-100

STC Watts vs. AC Watts

131

3 strings of 10 modules = 3000 Peak DC Watts (STC)

Reality:

3000 DC Watts

– ~20% (temp variations)

2400 DC Watts

– ~4% (inverter inefficiency)

2304 Peak AC Watts

Caution: Do not sell STC Watts!

132

System Design

Sunny Design Solar Design Tool Software

133

Download Software and Meteorological data

134

135

Step 1 PV Plant

136

Select Location Data

137

> Select Region, Country> Select city closest to installation site

PV Module Temperatures

138

Lowest Record Low

Highest Record High

Temps in Celcius

PV (Cell) Temperature Entry Rule of Thumb

> Free field installation: +22°C> Roof-top installation with large distance between roof and module: +28°C> Roof-top installation with room for airflow: +29°C> Roof-top installation with little room for airflow: +32°C> Facade with room for airflow: +35°C> Facade with little room for airflow: +39°C> Roof-top integrated with no room for airflow: +43°C> Facade integrated with no room for airflow: +55°C

> Version 2.0 will offer module temperature OR ambient temperature option

> Version 2.0 will offer temperatures in either °F or °C

139

Average Temperatures from Weather.com

141

Atlanta, GA

Highest Record High = 32°C

Lowest Record Low = 1°C

142

Mounted Flat Against The Roof

+39º C

143

Tilt Angle or Ground Mount

+28º C

144

Tilt Angle or Ground Mount

Courtesy: David Monniaux, Réunion Islands

+22º C

Solar Trees

145

+22º C

146

Tracker Mount

Courtesy : Katcha Sanderson

+22º C

Select Module Information

147

Unlisted Module Entry

148

Use if module is not listed

Manual Data Entry

149

Select and Tilt and Azimuth angles

150

True South is 0 degreesEnter offset of installation orientation

Step 2 Inverter

151

Select Inverter type

Inverter Page

152

> Select inverter with appropriate grid voltage

> System selects number of inverters

> Verify Grid voltage

String Configuration Output

153

Number of Strings

Number of Modules(Min & Max)

Wire Size Calculator

154

Step 3 Results

155

Value Descriptions

156

> Inverter effectiveness> AC Power / DC Power> MPP tracker, inverter

> Nominal Power Ratio> DC nominal power / PV peak power

> Yearly energy Yield (approx)> Estimated annual yield in kWh

Compatibility Check

157

> Green = PV and Inverter are within the nominal power ratio standard range > 80-120%

> Energy Usability> % of DC power converted /

effective DC power produced

> Performance ratio> Deviation of power effectively fed into

the grid compared to STC PV yields> Includes power losses of entire plant

> PV efficiency, cable losses, mismatchand inverter efficiency

Yield Loss Warning

158

> Reduced # modules from 18 to 12

> Nominal Power ratio went up from 107% to 161%> Indicates inverter is oversized

Result Page with PV Mismatch

159

Sunny Design Layout Options

160

Page Setup

161

Output Page Values Selection

162

Select which values will be printed on the Output Sheet

Output Page Top Half

163

Output Page Bottom Half

164

165

DC Wiring

> Basic DC wiring design has these 6 elements:

> Conductor Sizing

> Overcurrent Protection Sizes

> Series Fusing

> DC Disconnect

> DC Combiners

> Grounding the PV- Conductor

DC Conductor and Device Sizing

166

> Based on the Rated Short Circuit Current (Isc) of the solar panel

> [NEC 690.8(A)(1)]

> First, find the PV Source Circuit Current (PVscc)

PV scc = Isc x 1.25

For example : Isc = 7.9 Amps

PV scc = 7.9 A x 1.25 = 9.8 A

> Then, size devices and conductors for 125% of PVscc

-- [NEC 690.8(B)(1)]

9.8 A x 1.25 = 12.25 A

-- Can also multiply Isc x 156% and get the same answer

Fuse Sizing

167

> Overcurrent Protection (Series Fusing) is required by [NEC 240] for all source circuits to protect from backfeed under fault conditions.

> To properly size protective devices, round up to next whole number

> For example: 125% * PVscc = 12.25A → 15A fuse

> Maximum Series Fuse Rating on the module manufacturer’s spec sheet.

DC Wiring- Overcurrent Protection

168

> Overcurrent protection is required by [NEC 690.9].

Series Fusing required for more than 2 strings

169

+

-

Combiner boxes are fused

170

SMA SCCB - 6

DC Disconnect

172

> [NEC 690.13] through [NEC 690.17] provides details

> The Disconnect should only switch the ungrounded conductors.

> The Disconnect is not rated as serviceable equipment

> The Disconnect shall be located in a readily accessible location outside a building or inside nearest the point of penetration of the building.

> Note: Disconnects shall not be installed in bathrooms.

> PV circuit conductors can be run inside a building to a DC disconnect provided they are contained in metallic raceway [NEC 690.31(E)].

NEC 690.17 Requirements

173

> Manually operable switch(es) or circuit breaker(s) which comply with the following requirements:

1) Located where readily accessible.

2) Externally operable without exposing the operator to contact with live parts.

3) Plainly indicating whether in the open or closed position

4) Having an interrupt rating sufficient for the nominal circuit voltage and the current that is available at the line terminals of the equipment.

AC Wiring

174

> Basic AC Design meets 6 requirements

> Proper Circuit Routing

> Overcurrent Protection Sizing

> Voltage Drop and Conductor Sizing

> Line/Supply-Side or Load-Side Point of Connection

> AC Panel Sizing

> AC Disconnect

AC Circuit Routing [NEC 690.64(B)(1)]

175

> Each inverter must have a dedicated circuit with one Over Current Protection Disconnecting Means

> This can be a dedicated circuit to an AC breaker.

OR

> A dedicated circuit to a fused AC disconnect

AC Wiring

176

> Overcurrent Protection Sizing

> The independent overcurrent protection size is 125% of the maximum output current of the inverter

SB 7000US29.1A @ 240Vac

=

2 pole40 AmpBreaker

AC Breaker Size SB 3000US & SB 4000US

177

SB 3000 USMax Output

Current125% of

Max OutputBreaker

Size Poles

240Vac 12.5 A 15.25 20A 2

SB 4000 USMax Output

Current125% of

Max OutputBreaker

Size Poles

240Vac 16.6 A 20.75 25A or 30A 2

The full consequence of NEC 2005 [690.64(B)(2)]

178

> The sum of the ampere ratings of overcurrent devices in circuits supplying power to a busbar or conductor shall not exceed the rating of the busbar or conductor.

> Exception is 120% for dwelling units

> NEC 2008 [690.64(B)(2)]

> The sum of the ampere ratings of overcurrent devices in circuits supplying power to a busbar or conductor shall not exceed 120% of the rating of the busbar or conductor.

Main Breaker Sizing

179

Main Circuit Breaker and Busbar =125A

Empty Slot for SB4000US breaker2 Pole 25/30 Amp

Will this installationcomply with NEC?

NEC 690.64(B)(2) 120% Rule

180

PV + Main ≤ 120% of Bus Bar or Conductor

30 A (PV) + 125A (Main) ≤ 150 A (1.2 x 125A)

155 > 150

Main Breaker and Bus bar rating: 125 A

Now What?

181

> Upgrade the Bus Bar (new distribution panel) = $$$$

> Downgrade the Main Breaker to 100A = $$

> Supply side connection (Line side tap) = $$

AC Voltage Drop and Conductor Sizing

182

> NEC 210.19(A)(1) FPN No. 4 recommends less than 3% voltage drop in branch circuits.

> SMA recommends between 1 % and 1.5% voltage drop.

> Feedback from the field shows fewer AC related calls when this small tolerance is used.

> Use the Voltage Drop Calculator on SMA website

AC Voltage Drop and Conductor Sizing

183

> Branch circuit conductors are sized based on the maximum output current of the inverter [NEC 210.19(A)(1)]

> Equipment grounding conductor is sized by Table 250.122

> Note: if the branch circuit conductors are increased for voltage drop then the equipment grounding conductor must be increased proportionally [NEC 250.122(B)].

Line Side Connections

184

> NEC 690.64(A) allows for connection to the supply side of the service disconnection means.

> This creates a second service entrance

> Must comply with the requirements of NEC 230.82(6)

185

Is an AC side visible indicator disconnect required?

> NEC 690.64 does not specifically require one.

> Check with your local utility about this requirement.

> Some utilities are beginning to phase this out.

> November 21st 2006, PG & E dropped AC disconnect requirement.

> Can be unfused unless it is the primary disconnect for a utility side connection.

DC Ground Current Messages

186

> Three Levels of Ground Current

> 0 to 100 mA (0.1A): Normal

> 100 to 1000 mA (1A): Earth_Cur_max

> > 1000 mA: GFDI Open

> Indicates a problem on the DC side of the installation

Earth Current Max

187

> Earth_Cur_max

> Usually caused by improper installation.

> Pinched or chaffed wires; insulation perforated by rodents.

> Lightning arrestors that do not reset after T- storm.

> Recommended Fix

> Treat this like a ground fault.

NEC 690.5 GFDI

188

> Required roof mounted systems .

> Designed to prevent building fires.

> Requires a label indicating consequences of a ground fault (NEC 690.5 (C))

> Sunny Boy inverters have integrated GFDI.

> Although the GFDI fuse is located inside the inverter, a blown fuse indicates a fault outside the inverter.

INVERTERS DO NOT CAUSE GROUND FAULTS!

Ground Fault Detection

189

GFDI Fuse Open

191

> Indicates a true ground fault> Can appear during initial installation or develop in an existing installation

> Rodents chewing through wires> Mounting screw through the back of a module> Condensation in a junction box> Bonding PV ground outside the inverter> Lightning strike

Busy Squirrels

192

Indication of PV Array Ground Fault

193

Where is the Ground Fault?

194

Positive to Ground

42 Volts

Negative to Ground

63 Volts

42 / 21 = 2 or 2nd

module from the positive home run.

+ -

63/21 = 3 or 3rd module from the negative home run.

Where is the ground fault?

195

+

_

Open Circuit = 400V DC

+ to G = 120V DC

-- to G = 280V DC

400 V / # of Modules ~ 40V per Module

Where is the ground fault?

196

+

_

Open Circuit = 400V DC

+ to G = 360V DC

-- to G = 40V DC

400 V / # of Modules ~ 40V per Module

Where is the ground fault?

197

+

_

Open Circuit = 400V DC

+ to G = 0V DC

-- to G = 400V DC

400 V / # of Modules ~ 40V per Module

Ground Fault Localization

198

> Check to ensure modules & strings are wired correctly

> Check for pinched wires between panels or in conduit

> Check for damage to PV modules.

> Check junction boxes for loose connections or water (especially if wire nuts are used!)

> Check to ensure grounded conductor is not bonded to equipment ground

Required Information for Permitting

> Site plan showing location of major components on the property.

> Not necessarily to scale.

> Should represent relative location of components.

> PV arrays on dwellings with a 3’ perimeter space at ridge and sides do not need fire service approval.

> Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects, required signs, and AC connection to building

> Specification sheets and installation manuals (if available) for all manufactured components including, but not limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system.

199

Code Organizer Diagram Form

200

http://www.solarabcs.org/permitting/Expermitprocess.pdf

Installation, Commissioning and Maintenance

201

Sunny Boy Mounting

202

> Do not mount in direct sunlight (Ambient temp < 45ºC).> Mount in vertical position only.> Recommended minimum clearance is 8” on all sides; at least 3 feet

between the floor/ground and the DC disconnect.> Do not mount inverters on bedroom walls because they vibrate.

> 3 feet

Indoor Installation

203

> Ensure adequate ventilation

Courtesy: Vincent Endter, Clark Electric

Evidence of Improper Ventilation

204

Avoid Direct Exposure to Sunlight

205

206

1 String of18 Kyocera 170GT(deliberately undersized)

1 SB 6000US

Inverter receives a few hours of sun in the afternoon.

Recommend Sunny Shade!

Sunny Shade?

207

208

OptiCool®: Cooling System

Improper Mounting

209

Preventive maintenance

210

> The Sunny Boy inverters contain no user-serviceable parts except for the fans on the bottom of the enclosure and the handle covers on the sides of the unit.

> For all repair and maintenance always return the unit to an authorized SMA Service Center.

Maintenance – Fan Cleaning

211

1. Periodicity: Every 6 months; sooner depending on environment.2. Turn off DC and AC power to inverter.3. Wait 5 min. for capacitors to discharge.4. Remove fan screen(s)

Remove fan and disconnect from power cable

212

Latch holes

Jumpers configured for fan test

213

Inverter Commissioning

1. Remove covering from PV array (if used).

2. Turn on AC breaker and/or disconnect.

3. Turn on DC disconnect.

4. Inverter will be in “Waiting Mode” for approximately 10 seconds. Green light will be blinking.

5. If there is no fault the inverter will tie to the grid and the green light will change from blinking to solid.

214

SUNNY BOY HF-US : Benefits

Easy Installation

> Light weight: less than 50 pounds

>Fits between wall studs

> No special tools required

> Plug in selector of positive or negative ground

Simple Communication

> Bluetooth® interface

> Graphic display

> Preconfigurable settings

SUNNY BOY HF-US

Maximum Performance

> World class efficiency (95%CEC)

> Maximum module selection

Versatile

> Flexible system design with:

> Voltage input window 175 to 600V

> Maximum DC input current 15 A

> 2 DC terminals expandable to 3 terminals

> Integrated DC disconnect

Graphic Display and Data Logging

Graphic Display available 24 hours

SD card can store inverter data forup to 25 years

Current Power

kWh today

Total kWh

Grid voltage

PV array voltage

Daily power curve

Wireless Bluetooth® Technology

Wireless data logging and monitoring with free Sunny Explorer software

Wireless data logging and monitoring with Sunny Beam Bluetooth®

Fan release

Spring loaded terminals for AC connection

Field configurable for positive ground systems

2 spring loaded DC terminals

DC disconnect switch

Configuration and communication module

3000HF US Disconnect

DIN rail allows expansion for 3 terminals

Stud Mount Installation

> Optional recessed installation

> New or retrofit homes with limited space

> “PV ready“ new home construction

> Available Q1 2011 (no, really)

Introduction to Data Logging and Monitoring

221

222

Solar Plant Tool

> Worldwide system access with web browser

> Cyclic reporting of system yield

> Remote plant diagnosis and configuration

> Data Storage and display via Internet

> Compatible with all SMA inverters

Inverter communication requires:

223

1) One RS- 485 Piggy Back Card2) One RS-485 Cable

3) One Web Box

26 Kyocera KD205 Panels (5.33KW) Scottsdale, AZ

224

Additional Monitoring

> Sunny Beam

> Sunny Portal iPhone app (Free)

> SunnyPortal.mobi (Blackberry, etc)

> Flashview Software (Free)

> Solar Checker app (Free)