View
217
Download
0
Category
Tags:
Preview:
Citation preview
Team Legado’s Detailed Design PresentationTeam members:•Mohammed Sharara 3488•Amir Almazrouei 3529•Mohammed Abdullah 3633•Fahad Altamimi 3464
Outline
•Introduction•Aim and scope of the project•Objectives•Modifications•Surfacing•Maintenance•Estimated cost of materials•Summary
Introduction
•Client statement: The requested to conceive a design for a
playground for the ( SNC ) that is:1. Safe2. Affordable 3. Reliable
Aim and scope of the project
•Aim of the project:
Designing a device for a playground that satisfies the objectives and obey the restrictions.
•Scope of the project:
Designing at least 2 devices for the playground that will be used by children in ( SNC ).
Objectives
•Objectives:SafeAffordable ReliableEasy to maintainEasy to assemble
Evaluation and generation of alternatives•Identifying the objectives using metrics.
•Identifying the functions using requirements.
•Building a Morph Chart using means.
•Choosing the design using Numerical Evaluation Matrices.
Modifications
•Design 1: ( before modification )
Modifications
•Design 1 ( after modification )
Modifications
Modifications
Modifications
Modifications
Modifications
•Changes and modifications: Adding of mind challenging gamesAlternating some of the features of the
original designChanging the design of the climbing ropesModification of the design to accommodate
with the different symptoms of the childrenExtra safety measures to ensure safety
Modifications
•Design 2: ( before modification )
Modifications
•Design 2 ( after modification )
Modifications
•Changes and modifications: Changing the design to an assembly based see-
sawAddition of safety meansInstalling barriers to the springs to restrict it’s
movementModification of the design to accommodate with
the different symptoms of the children
Surfacing
•safety zones:For both the playhouse and see-saw
•Materials used and why:1. Pea gravel2. Shredded/recycled rubber mulch
Maintenance
•Aim is to decrease maintenance rate by using :
Materials with available spare parts.Materials with low maintenance rate.Materials with no need for specialist to
assemble.Materials that takes short time to assemble.
• Decrease maintenance rate Decrease cost.
Estimated cost of materialsMaterial Amount Total cost
(AED)Rubber mulch 72 square ft 1100
Plastic 260 square ft 1600
Metal sheets 8 square ft 5300
Metal poles (15) 1125 kg 4000
Ropes 8.4 m 100
The total cost of the equipments add up to 12100 (AED)
Summary
•Team Legado’s assignment.•Most important features of the detailed
design:Extra safety measures.Changing the designs to reduce the cost. Improving the design to suit different
children with different symptoms.•Testing the detailed design.•Getting approval to start building device.
Recommended