View
223
Download
0
Category
Preview:
Citation preview
MCR-P 24/BS 80 MCR-P 24/BS 130
MCR-P… BIC, BS or MIHeating and domestic hot water by independent calorifier or micro-accumulated
MCR-P 24:for heating only
Condensing
MCR-P 24: from 6.3 to 25.0 kW, for heating only
MCR-P 24/BS 80 and MCR-P 24/BS 130: from
6.3 to 25.0 kW, for heating and domestic hot
water production by 80 or 130 litre independent
calorifier
MCR-P 24/28 BIC: from 6.3 to 25.0 kW, for
heating and domestic hot water production by
integrated calorifier
MCR-P… MI: from 6.3 to 35.5 kW, for heating
and instant domestic hot water production for
chimney or forced flue connection
All of these boilers are factory fitted with a control panel which can be complemented by a control system offering 2 comfort levels:- Either by room thermostat- Or by remote control according to the outside temperature with the
possibility of controlling a circuit with mixing valve in addition to a direct circuit
Various air/flue gas connection configurations are possible:we offer solutions for connection by horizontal or vertical forced flue, to a chimney, in bi-flow.
CONDITIONS OF USEBoiler:
Max. operating temperature: 90°CMax. operating pressure: 3barsSafety thermostat: 110°CPower supply: 230V/50HzProtection index: IPX4D
BMR 80 and SR 130 DHW calorifiers:Max. operating pressure primaryand secondary circuits: 10barsMax. operating temperature primary and secondary circuits: 95°C
HOMOLOGATIONB23P - C13x - C33x - C93x -C53 - C43x - C83x*
GAS CATEGORYII2H3P, Classe NOx: 5
*to be adapted according to the country for which the boilers are intended
All natural gasesPropane
EC identification No.:0063BQ3009
★★★★
VIVADENS MCR-PW A L L - H U N G G A S C O N D E N S I N G B O I L E R S
MCR-P 24MCR-P … MI
MCR-P 24/28 BIC
EASYLIFEEASYLIFE
2
Model Boiler Calorifier Boiler/calorifier connection kit DHW sensor
MCR-P 24For heating only
HG 119
- - -
MCR-P 24/28 BICFor heating and domestic hot water production by integrated 40-litre calorifier
HG 123
- - -
MCR-P 24/BS 80For heating and domestic hot water by independent 80-litre calorifier
HG 119 EE 53 HG 56 AD 226
MCR-P 24/BS 130For heating and domestic hot water by independent 130-litre calorifier
HG 119 EE 22 HG 57 AD 226
MCR-P 24/28 MIMCR-P 30/35 MIMCR-P 34/39 MIFor heating and instant domestic hot water production
HG 120HG 121HG 122
- - -
PRESENTATION
MODELS AVAILABLE
MCR-P 24, MCR-P 24/28 BIC and MCR-P…MI boilers are delivered fully assembled and factory tested. They come ready to operate on natural gases; operation on propane is possible by simple adjustment or by conversion kit (available as optional equipment).MCR-P 24 boilers are factory fitted with a heating/DHW reversal valve for connection to an independent hot water calorifier: 2 types of optional DHW calorifiers are available:- 80-litre BMR 80 calorifier to be juxtaposed to the right or left of
the boiler: version MCR-P 24/BS 80;- 130-litre SR 130 calorifier to be placed on the floor under the
boiler: version MCR-P 24/BS 130.The MCR-P 24/28 BIC version is particularly compact (900x600x450mm) and efficient: DHW production, with *** performance in accordance with EN 13203, is handled by a 40-litre storage calorifier integrated into the boiler, combined with an external plate exchanger with a large exchange surface, a DHW pump and a heating/DHW reversal valve.MCR-P…MI boilers are combi boilers and produce large quantities of domestic hot water (*** classification in accordance with the standard EN 13203) thanks to an oversized plate exchanger and very reactive electronics.
THEY OFFER HIGH LEVELS OF PERFORMANCE
- Efficiency at 40/30°C up to 109%- Efficiency class ★★★★ CE- NOx < 70mg/kWh- NOx classification: 5 in accordance with PR EN 15420- Very low noise level (see page 5)
STRONG POINTS
- Particularly compact, light boilers- Perfect adaptation of boiler output to actual needs thanks
to the stainless steel gas burner with complete premixing, modulating from 25 to 100% output, fitted with a silencer on the air intake.
- Stainless steel exchanger with double external envelope in composite material.
- Electronic ignition and ionisation flame check.- Delivered with a 8-litre expansion vessel (no vessel on MCR-P
34/39 MI), automatic air vent, water pressure switch. The MCR-P 24/28 BIC is also fitted with the 7-bar DHW safety valve.
- Simple, functional control panel with optional control system offering 3 comfort levels:• By room thermostat On/Off• By modulating programmable room thermostat.• By room thermostat or modulating room thermostat according
to the outside temperature.- The module AD 290 (option) combined with a modulating room
thermostat (AD 266/AD 265/AD 288 or AD 289) allows the controlling of 2 additional circuits (direct, with mixing valve or for DHW production).
- For the various air/flue gas connection options, see page 11.
MC
R_Q
0001
MC
R_Q
0031
MC
R_Q
0002
MC
R_Q
0008
MC
R_Q
0001
++ +
++ +
3
TECHNICAL SPECIFICATIONS
DESCRIPTION
MCR-P… MI*
MCR-P 24/28 BIC*
Heating body and burner
MC
R_Q
0005
MC
R_Q
0011
MC
R_Q
0030
Stainless steel exchangerwith low inertia and considerable resistance to corrosion with double exterior envelope in composite material used for thermal and phonic insulation
Stainless steel burnerwith total premix modulating from 25 to 100% of the output, with low NOx and CO emissions, with silencer on the air intake
Automaticair vent
Heating body and burner
Gas valve unit2-speed circulator pump
Control panel see p. 6
Expansion vessel(8 litres)
40-litre DHW storage calorifier protected by a magnesium anode
7-bar DHW safety valve
Calorifier drainage
Control panel (see p. 6)
* Our boiler are equiped with a water pressure switch
3-bar safety valve
Plate exchanger for instant DHW (MCR-P…MI)
Ionisation and ignition electrodes
Expansion vessel (8 litres – initial pressure 1bar (no vessel on MCR-P 34/39 MI)
Air/flue gas connection Ø 60/100mmwith measuring point
Air/flue gas connectionwith measuring pointAutomatic
air vent
Heating body and burner
2-speed heating circulator pump
DHWpump
Plate exchanger with large exchange surface
3-bar heating safety valve
4
TECHNICAL SPECIFICATIONS
MAIN DIMENSIONS (IN MM AND INCHES)
670 690
741
2
12
122 3 4 5 6
34 5 6
132,5300
9
329379 21
400
160
114
148
181248
313
7121
49
30,513
13
94
142
147
17194
670
690
209
680
880
741
210 11
10
11
4 6
9
329379
400
7121
132,5300
444
12
123
1481313
160
260Ø 427
Ø 422
176,5
32
142
14730,5
2 10 4 11 62 10 4 11 6
9
972
900
49 65 67
255
67 65
102
600128
446
85 8545 340 45
160
85
1227
13 1213149
220
670
690
741
2
10 11
4 6
9
329379400
7121 132,5
300
153110
48
305
590
Ø 570
912
446
1980
160
12 13
MCR-P 24/BS 80: boiler MCR-P 24 (package HG 119) + calorifier BMR 80 (package EE 53) + Connection kit (package HG 56) + DHW sensor (package AD 226)
MCR-P 24/ BS 130: Boiler (package HG 119) + Calorifier SR 130 (package EE 22) + Connection kit (package HG 57) + DHW sensor (package AD 226)
MC
R_F0
025A
MC
R_F0
027A
MC
R_F0
026A
MC
R_F0
028A
� Heating outlet G 3/4"*� MCR-P 24: Primary calorifier outlet G 1/2"
MCR-P…MI: Domestic hot water outlet G 1/2"� Gas inlet G 1/2"� MCR-P 24: Primary calorifier return G 1/2"
MCR-P…MI: Domestic cold water inlet G 1/2"� Heating return G 3/4"*� Evacuation of combustion products and air inlet pipe
Ø 60/100mm� Domestic hot water outlet
- MCR-P 24/28 BIC: G 1/2"- MCR-P 24/BS…: R 3/4"
Domestic cold water inlet- MCR-P 24/28 BIC: G 1/2"- MCR-P 24/BS…: R 3/4"
Condensates drain Ø 21.5mm� Safety valve Ø 15mm
R: threadingG: external cylindrical threading (watertightness by flat gasket)
* With adapting parts supplied with the boiler
➩ MCR-P 24 and MCR-P…MI ➩ MCR-P 24/28 BIC
5
TECHNICAL SPECIFICATIONS
SPECIFICATIONS TABLE
Boiler type: condensingMCR-P 24:
For heating only
MCR-P…MI:For heating and for heating and instant domestic hot water production
MCR-P 24/BS 80 and /BS 130:For heating and hot water production with independant calorifier
MCR-P 24/28 BIC:For heating and domestic hot water production by integrated calorifier
Burner: modulating with complete premixingEnergy used: natural gas or propaneCombustion evacuation: chimney or sealedMin. flow temperature: 20°CMin. return temperature: 20°CRef. CE certificate: 0063BQ3009
Model MCR-P 24 24/28 BIC 24/BS 8024/BS 130 24/28 MI 30/35 MI 34/39 MI
Useful output at 50/30°C Pn (heating mode) min.-max. kW 6.3-25.0 6.3-25.0 6.3-25.0 6.3-25.0 6.6-31.3 6.8-35.5
Nominal output at 80/60°C (DHW mode) kW - 27.4 - 27.4 34.3 38.2Efficiency in % oflow calorific powerat load …% Pn and water temp. …°C
100% Pn at ave. temp. 70°C % 98.3 98.3 98.3 98.3 98.2 98.0
100% Pn at return temp. 30°C % 104.4 104.4 104.4 104.4 104.4 104.4
30% Pn at return temp. 30°C % 108.7 108.7 108.7 108.7 109.7 110.5
Nominal water output at Pn, Δt = 20 K m3/h 1.03 0.93 1.03 1.03 1.29 1.47
Loss when not in use at Δt = 30 K W 57 86 57 57 57 57
Auxiliary electrical power at Pn (without circul.) W 25 25 25 25 25 25
Circulator pump output W 90 90 90 90 125 135
Useful output at 80/60°C min.-max. kW 5.5-23.6 5.5-23.6 5.5-23.6 5.5-23.6 5.7-29.5 5.9-33.3
Manometric height avail. heating circuit mbar > 250 > 250 > 250 > 250 > 200 > 200
Water capacity l 1.7 1.8 1.7 1.8 2.0 2.2
Gas flow at Pn - gas H m3/h 2.33 2.96 2.33 2.96 3.70 4.13
(15°C, 1013 mbar) - propane m3/h 0.9 1.15 0.9 1.15 1.44 1.60
NOx emissions in accordance with EN 297 mg/kWh 65 65 65 65 43 39
Condensation water pH 1-7 1-7 1-7 1-7 1-7 1-7
Max. flue gas temperature at 80/60°C °C 80 95 80 95 93 95
Min./max. mass flue gas output kg/h 9.8/37.0 9.8/47.1 9.8/37.0 9.8/47.1 10.3/58.9 10/62
Pressure available at the boiler outlet Pa 50 100 50 100 100 140
Total weighted min./max. noise output in accordance with NF EN ISO 3741 dB (A) 43.1-49.3 36.1-47.3 43.1-49.3 43.1-49.3 45.0-47.9 44.1-49.5
Net weight kg 29 61 97/105 31 32 34
Model MCR-P 24/28 BIC 24/BS 80 24/BS 130 24/28 MI 30/35 MI 34/39 MI
DHW calorifier capacity l 40 80 130 - - -
Exchanged power kW 27.4 22.6 22.6 27.4 34.3 38.2
Flow over 10 min at Δt = 30 K l/10 min 180 165 200 - - -
Flow over 10 min at Δt = 35 K l/h 670 555 555 - - -
Spec. output at Δt = 30 K (1) l/min 18.0 16.5 20.0 14.0 16.0 19.0
Min. pressure for a flow of 11l/min bar - - - 0.4 0.4 0.4
DHW losses through the outer casing at Δt = 45 K W - 73 - - -
Aux. elec. output in DHW mode W 115 115 115 115 150 180
Cooling constant kWh/24hl.K. - - 0.27 - - -Domestic performance at room temp. 20°C, cold water temp. 10°C, primary hot water temp. 85°C(1) in accordance with EN 13203-1 for MCR-P 24/BS… and MCR-P 24/28 BIC
in accordance with EN 625 for MCR-P…MI
Specifications domestic hot water
6
CONTROL PANEL
CONTROL PANEL ON MCR-P BOILERS
CONTROL PANEL OPTIONS
MCR-P boilers are fitted with a very simple control panel. This allows the continuous adaptation of “heating” and “DHW” output to needs. It incorporates functions for antifreeze protection
and cleaning the circulator pump every 25 hours and a troubleshooting assistance system with alarm code display.
Programmable wire-controlled room thermostat - Package AD 137Programmable wireless room thermostat - Package AD 200Non-programmable room thermostat - Package AD 140
AD 140
AD 200The programmable thermostats handle the regulation and weekly programming of heating by activating the burner in accordance with the various operating modes: “Automatic” depending on programming, “Permanent” at a set temperature or “Holidays”. The “wireless” version is delivered
with a receiver box to be affixed to the wall close to the boiler.The non-programmable thermostat is used to regulate the room temperature according to the instruction given by activation of the burner.
8801
Q00
386
66Q
120A
Control module for 2 additional circuits - Package AD 290AD 290This module is used in combination with a modulating thermostat and allows the management of two additional circuits. Each of these additional
circuits can be a direct circuit, a circuit with mixing valve or a DHW circuit.
CM
IX_Q
0001
Programmable room thermostat modulating “OpenTherm” (wire) - Package AD 265Programmable room thermostat modulating “OpenTherm” (wireless) for eastern Europa - Package AD 288Programmable room thermostat modulating “OpenTherm” (wireless) - Package AD 266Programmable room thermostat modulating “OpenTherm” (wire) for eastern Europa - Package AD 289
AD 265 / AD 289
AD 266 / AD 288
This thermostat handles the regulation and programming of the heating and of DHW.The regulator adapts the power boiler to the needs 3 modes of operating are possible:AUTOMATIC: according the weekly programming used: for each programmed period, we can indicate the set temperature.PERMANENT: maintains the set temperature chosen for the day, night or antifreeze.
VACATION: intended for absences of long duration. Allows to bring in the dates of beginning and end of the vacation as well as the desired temperature.For operation according to the outside temperature, a outside sensor (package AD 225) can be added.
isens
e_Q
0003
isens
e_Q
0004
MC
R_Q
0004
“Menu” keyManometer
On/Offswitch
Large LCD display
“Sweep” key
“Space” or “reset” key Maintenance key or validation key
Heating temp. adjustment key or “–” key DHW temp. adjustment key or “+” key
7
BOILERS OPTIONS
Outside sensor - Package AD 225The outside sensor can be used alone or in combination with room thermostats or communicating remote controls for heating
regulation dependent on the outside temperature. It is essential if using an installation with a mixing valve circuit.M
CR_
Q00
21
Domestic hot water sensor - Package AD 226
Piping kit for passage behind - Package HG 43
The domestic hot water sensor is used to apply priority regulation to DHW production by an independent calorifier. It is necessary, particularly
if connecting a BMR 80 or SR 130 calorifier, presented as optional equipment for these boilers.
This kit comprises the 5 water and gas connecting pipes to be connected to the plumbing fixtures on the MCR-P mounting frames to be passed behind
the top rear section of the boiler through the stand-off frame (option above).
MC
R_Q
0018
MC
X_F0
005A
MC
R_Q
0006
MC
A_F
0015
Mounting frame with disconnector for MCR-P 24 - Package HG 58Mounting frame with disconnector for MCR-P…MI - Package HG 59Mounting frame with disconnector for MCR-P 24/28 BIC - Package HG 114
Stand-off frame for MCR-P 24 and MCRP-…MI - Package HG 19Stand-off frame for MCR-P 24/28 BIC - Package HG 75
Is delivered in a separate package to be prefitted and thus enable the fitter to make all the hydraulic
connections in advance and install the boiler only at the last minute.
This frame make it possible to pass the water and gas connection pipes behind the boiler (upwards). The plumbing fixtures are taken from the frame
HG 58, HG 59 or HG 114 and fitted to the stand-off frame.
MC
R_Q
0020
MC
X_Q
0006
Pipe cover - MCR-P 24 and MCR-P…MI - Package HG 21- MCR-P 24/28 BIC - Package HG 76- MCR-P 24 and MCR-P… MI - Package HG 94
Provides a neat finish underneath the boiler.
HG 21
HG 19
HG 94
HG 76
HG 75
8531
Q05
0
DHW expansion vessel for MCR-P 24/28 BIC - Package HG 77This prevents water losses due to expansion during reheating of the domestic hot water calorifier.
Capacity: 2 litres
Condensates neutralisation calorifier - Package HC 33Wall bracket for neutralisation calorifier - Package HC 34Granule refill for neutralisation - Package HC 35The materials used for the condensates flow pipes must be appropriate; otherwise the condensates must be neutralised. A regular check of the neutralisation system and particularly the
effectiveness of the granules by measuring the pH is necessary. If need be, the granules should be replaced.
HC 33
HC 34
8531
Q02
785
31Q
028A
BMR 80 domestic hot water calorifier - Package EE 53BMR 80/MCR-P 24 connection kit - Package HG 56SR 130 domestic hot water calorifier - Package EE 22SR 130/MCR-P 24 connection kit - Package HG 57
MC
R_Q
0010
MC
R_Q
0016
SR 130
BMR 80
MC
R_Q
0017
HG 57
HG 56
8666
Q04
3
BMR 80 and SR 130 domestic hot water calorifiers are high performance calorifiers. They are protected inside by food quality standard high quartz content vitrified enamel and by a magnesium anode.
The specifications of these calorifiers combined with MCR-P boilers are given on pages 2 and 3.The boiler/water calorifier connection kits available include rigid and/or flexible connection pipes between the boiler and the calorifier.
8
BOILERS OPTIONS
Conversion kit - Package DY 884Conversion kit for connection to a collective 3 CEP conduit (classification C43X).
SPECIFIC FLUE SYSTEM ACCESSORIES FOR VIVADENS MCR-P...
LOCATION
GAS CONNECTION AND ELECTRICAL CONNECTION
MCR-P condensing boilers must be installed in premises protected from frost, which can also be ventilated. The IPX4D protection index enables them to be installed in kitchens and bathrooms, excluding protection volumes 1 and 2, however.In order to ensure adequate accessibility around the boiler, we recommend that you respect the minimum dimensions given opposite.
VentilationThis must comply with prevailing regulations.
Comply with prevailing national or even local instructions and regulations.
MC
R_F0
005B
INFORMATION REQUIRED FOR INSTALLATION
Boiler connection kit for 3 CEP conduit - Package DY 887If connected to a 3 CEP duct, the adapter Ø 60/100mm delivered with the boiler should be removed and replaced by package DY 887
presented opposite, which incorporates the adapter Ø 80/125mm as standard.
Adapter bi-flow Ø 60/100mm to 2 x 80mm - Package DY 868
MC
35E_
F005
3M
CX_
F000
8FU
M_F
0028
ADB
_Q00
04
Solar kit - Reference S101439This kit allows to link on the models MCR-P… MI/BIC a solar DHW tank. If the DHW temperature resulting from the solar tank is > 58°C, then this water is available via the manual thermostatic mixing valve.
If the DHW temperature resulting from the solar tank is < 58°C, this water is injected in the system of the DHW preparation of the boiler to reach the booster temperature.
* MCR-P 24/28 BIC
Connection-set for MCR-P…MI and BIC - Reference S100996Connection-set for MCR-P 24 - Reference S100995These kits contain retaining valves to screw directly on the boiler.
MC
R_Q
0032
MC
R_Q
0033S100996
S100995
*Option: to be adapted according to the country for wich the boilers are intended
Propane conversion kit (for all boilers except MCR-P 34/39 MI) - Package HG 44Propane burner for MCR-P 34/39 MI - Package HG 31Compact module for 1 direct circuit and 1 circuit with valve - Package EA 104This module is fully assembled, insulated, tested and fitted with 4 isolating valves with thermometers, a 3-speed pump and a motorized 3-way valve (valve circuit side), as well as 1 manual air vent
per circuit. It is connected directly under the boiler to the hydraulic connection kit; if a DHW tank is fitted under the boiler, it can also be relocated to the side.85
31Q
068
Flow collector - Package HG 28*Used to collect the run-off from the condensates flow siphon, the safety valve and the disconnector.
MC
R_F0
010
9
INFORMATION REQUIRED FOR INSTALLATION
HYDRAULIC CONNECTIONSImportant: The principle of a condensing boiler is to recycle the energy contained in the water vapour in the combustion gases (latent vaporisation heat). Consequently, to achieve an annual operating efficiency in the order of 109%, it is necessary to size the heating surfaces in such a way as to obtain low return temperatures, below the dew point (e.g. underfloor heating, low temperature radiators, etc.) during the entire heating period.
MCR-P boilers must only be used in closed-circuit heating installations, previously cleaned to eliminate residues and deposits caused by commissioning the installation. Furthermore, it is important to protect central heating installations against the risk of corrosion, scaling and microbiological growth: the water treatment products used must comply with regulations.
Condensates dischargeThe siphon provided must be connected to the waste water discharge system. The connection must be removable and the flow of condensates visible. The connections and pipes must be in corrosion-resistant material.
An optional condensates neutralisation system is available (package HC 33 see page 7).
The examples presented below cannot cover the full range of installation scenarios which may be encountered. Their purpose is to draw the attention to the basic rules to be followed. A certain number of control and safety devices (some of which are already integrated as standard in MCR-P boilers) are represented but it is ultimately up to installers, experts, consultant engineers and design departments to take the final decision on the safety and control devices to be used in the boiler room according to its specificities.
In all cases, it is necessary to abide by the codes of practice and prevailing regulations.
Attention: For the connection of domestic hot water, a sleeve made of steel, cast iron or any other insulating material must be interposed between the hot water outlet and these pipes to prevent any corrosion to the connections, if the distribution pipes are made of copper.
MCR-P 24, MCR-P 24/28 MI:(with Grundfos UPR 15-60 type pump)
MCR-P 30/35 MI, MCR-P 34/39 MI:(with Grundfos UPR 15-70 type pump)
MC
R_F0
009A
Manometric height of the heating circulator pump fitted to the MCR-P:
STANDARD INSTALLATION DIAGRAMS
MCR-P 24/28 BIC:(with Grundfos UPR 15-55 type pump)
� High speed� Low speed
MC
R_F0
009A
T 20°C 18kW
Flow rate in (l/h)
Man
om
etri
c h
eig
ht
in m
bar
Flow rate in (l/h)
0
100
200
300
400
500
600
700
0 200 400 600 800 1000 1200
Man
om
etri
c h
eig
ht
in m
bar
T 20°C 18kW
T 20°C 28kW
Flow rate in (l/h)
Man
om
etri
c h
eig
ht
in m
bar
10
STANDARD INSTALLATION DIAGRAMS
MCR-P 24/BS 80 with 1 direct circuit + 1 domestic hot water circuit, controlled by a wire-controlled programmable room thermostat + outside sensor
MCR-P…MI with 1 direct circuit controlled by an communica-ting wireless remote control and outside sensor
230V50Hz
230V50Hz
27
329
9
Externalclock
9 2928
30
33
68
51
64
8
AD 137
AD 225
27
21
230V50Hz
9 2928
30
68
65
44
21
27
AD 266
20.013.00
c
AD 225
MC
RP_F
0001
MC
RP_F
0002
MCR-P 24/28 BIC with 1 direct circuit + 1 circuit with mixing valve, controlled by a communicating wireless remote control
MCR-P 24/28 BIC with 1 “radiator” circuit, controlled by a pro-grammable wire connection room thermostat + outside sensor
1 Heating outlet 2 Heating return 3 3-bar heating safety valve1a Heating outlet direct circuit1b Heating outlet valve circuit2a Heating return direct circuit2b Heating return valve circuit8 Manual bleed valve9 Isolation valve10 3-way mixing valve11 Heating pump11b Heating pump for circuit with mixing valve16 Expansion vessel
21 Outside sensor23 Outlet temperature sensor after mixing valve 26 Domestic water load pump27 Non-return valve28 Domestic cold water inlet29 Pressure reducer30 Sealed safety device calibrated to 7bars*32 (Optional) DHW loop pump33 DHW temperature sensor44 65°C limiter thermostat with manual reset for
underfloor heating46 2-position 3-way directional valve50 Disconnector
51 Thermostat valve55 DHW safety valve calibrated and sealed to
7bars64 Radiator circuit (gentle heat radiators, for
example)65 Low temperature circuit (underfloor heating, for
example)68 Condensates neutralisation system72 Hydraulic bypass75 Domestic water pump
30
50
BUS21
9 4
4
AD 266
AD 290
HG 114
20.013.00
c
11/26
4616
75
355
21
50Hz230V
11/26
4616
75
355
AD 265
AD 225
BUS51
64
8
92928
20.013.00
c
MC
RP_F
0006
MC
RP_F
0004
* mandatory, in compliance with safety directives
Legend
11
AIR/FLUE GAS CONNECTION
For the use of the air/flue gas connection pipes and the rules on installation, see details of the various configurations in the current product catalogue.
4 26
2
2
1
5 312
12
12
C33xC93xB23P C93x
C33x
C33xC13x
C53
L1
L1
Lmax = L1+L2
Lmax = L1+L2
Lmax
Lmax
Lmax
Lmax
max max max 1m 1m 1m
Lmax L2
L2 Lmax
Lmax
C43x
C43x
C43x
MC
R_F0
011C
� Configuration C13x: Air/flue gas connection by means of concentric pipes to a horizontal terminal (so-called forced flue)
� Configuration C33x: Air/flue gas connection by means of concentric pipes to a vertical terminal (roof outlet)
� Configuration C93x: Air/flue gas connection using concentric pipes in the boiler room and single pipes in the chimney (combustive air with counter current in the chimney)or
� Air/flue gas connection using concentric pipes in the boiler room and single “flex” pipes in the chimney (combustive air with counter current in the chimney)
� Configuration C53: Separate air and flue gas connection using a bi-flow adapter and single pipes (combustive air taken from outside)
� Configuration B23p: Connection to a chimney (combustive air taken from the boiler room)
� Configuration C43x: Connection to a collective 3 CEP conduit
Table of maximum air/flue gas pipe lengths admissible according to boiler type
(1) �: Max. height in the flue pipe (C93x, B23P configurations) from the support elbow to the outlet mustn’t exceed:- 25m for flex PPs- 30m for rigid PPsIn case of higher lengths, hoding collars must be added by slices of 25 or 30m.
Type of air/flue gas connection Maximum length (Lmax) of the connecting pipes in m
MCR-P 24 MCR-P 24/28 MIMCR-P 24/28 BIC
MCR-P 30/35 MI
MCR-P 34/39 MI
Concentric pipes connected to a horizontalterminal (PPS) C13x Ø 60/100mm 6 7 4 6
Concentric pipes connected to a vertical terminal (PPS) C33x Ø 80/125mm 20 20 20 20
Pipes- concentric in the boiler room,- single in the chimney (combustive air with
counter current) (PPS)
C93x
Ø 60/100mmØ 80mm 18 20 10 12
Ø 80/125mmØ 80mm - - 20 20
Pipes- concentric in the boiler room,- “flex” in the chimney (combustive air with
counter current) (PPS)
C93xØ 80/125mmØ 80mm 15.5 19 18 20
Bi-flow adapter and separate single air/flue gas pipes (combustive air taken from outside) (Alu) C53
Ø 60/100mmon 2x80mm 40 40 30 32.5
In the chimney (rigid or flex) (combustive airtaken from the premises) (PPS) B23P
Ø 80mm (rigid) 33 (1) 37 (1) 19 33 (1)
Ø 80mm (flex) 23 27 (1) 22.5 24.5
Collective 3 CEP conduit for sealed boiler C43x To size such a system, contact the supplier of the 3 CEP duct.
DESCRIPTION
VIVADENS MCR-P…WALL-HUNG GAS CONDENSING BOILER FOR CONNECTION TO A CHIMNEY OR A FORCED FLUE
Brand: De DietrichClassification: **** In accordance with the European efficiency directive, NOx classification: 5Model: MCR-P 24: for heating only,MCR-P…MI: for heating and production of instant DHW,MCR-P 24/28 BIC: for heating and production of instant DHW
with 40 litres calorifier,Homologation: B23P - C13x - C33x - C93x - C53 - C43x - C83x,Gas category: II2H3P,Protection index: IPX4D,
Power supply: 230V/50Hz,Useful output in heating mode at 40/30°C: _____kW,Useful output in DHW mode at 80/60°C: _____kW,Specific flow in DHW mode (MCR-P…MI): _____l/min,Specific flow in DHW mode (MCR-P 24/28 BIC): 18l/min,Max. operating temperature: 90°C,Max. operating pressure: 3bar,Safety thermostat: 110°C,Dimensions: 670 x 400 x 300mm,Weight empty: _____kg.
- Complies with the requirements of European Directives- Stainless steel exchanger with low inertia and considerable
resistance to corrosion, with double exterior envelope in composite material used for thermal and phonic insulation
- Stainless steel burner with total premix modulating from 25 to 100% of output, with low NOx and CO emissions and a silencer on the air intake
- Control panel facilitating the ongoing adaptation of “heating” and “DHW” output to needs, which can be complemented by various options to regulate heating according to the room or outside temperature
- Fully fitted boilers: 2-speed circulating pump, 8-litre expansion vessel (except MCR-P 34/39 MI), automatic bleed valves, 3-bar safety valve, plate exchanger for instant DHW on MCR-P…MI or heating/DHW reversal valve on MCR-P 24, air/flue gas connection in diameters Ø 60/100mm with measuring outlet
- MCR-P 24/28 BIC: MCR-P 24 with 40-litre DHW calorifier integrated into the boiler combined with a plate exchanger, a DHW pump, a heating/DHW reversal valve. Boiler/calorifier connecting pipes and DHW sensor provided.
Options for control panel- Programmable wire-controlled room thermostat- Programmable wireless room thermostat- Non programmable room thermostat- Outside sensor- Domestic hot water sensor- "OpenTherm" modulating room thermostat- "OpenTherm" radio modulation room thermostat- Control module 2 circuits.
Boiler options- Pipe cover for MCR-P 24 and MCR-P…MI- Pipe cover for MCR-P 24/28 BIC- DHW expansion vessel for MCR-P 24/28 BIC- Flow collector- Mounting frame with disconnector for MCR-P 24- Mounting frame with disconnector for MCR-P…MI- Mounting frame with disconnector for MCR-P…BIC- Condensates neutralisation calorifier- Wall bracket for neutralisation calorifier- Granule refill for neutralisation- BMR 80 domestic hot water calorifier- BMR 80/MCR-P 24 connecting kit- SR 130 domestic hot water calorifier- SR 130/MCR-P 24 connection kit- Propane conversion kit- Propane burner for MCR-P 34/39 MI- Boiler connection kit for 3 CEP conduit- Connection with separate air and flue gas pipes (bi-flow)- Solar kit- Connection set.
DESCRIPTION
01/2
012
– 30
0028
045
– 34
7.55
5.55
9 R.
C.S
Stra
sbou
rg –
Doc
umen
t not
bin
ding
. - P
rinte
d in
Fra
nce
– O
TT-Im
prim
eurs
Was
selo
nne
- 113
623
De Dietrich ThermiqueS.A.S. with corporate capital of 22 487 610 €57, rue de la Gare - F - 67580 MertzwillerTel. +33 3 88 80 27 00 - Fax +33 3 88 80 27 99www.dedietrich-heating.com
Recommended