TERMINAL FOUR WHARF, WAREHOUSE, AND DEBRIS REMOVAL PROJECTANNIKEN LYDONSEPTEMBER 2, 2021 COMMISSION MEETINGAPPLICANT: CITY OF RICHMOND WITH SUPPORT FROM THE STATE COASTAL CONSERVANCY

2

PROJECT LOCATION

September 2, 2021

3

PROJECT SITE PLAN

September 2, 2021

4

RELEVANT MCATEER-PETRIS ACT SECTIONS

• Section 66632• Permit required for fill and extraction

of materials• Section 66605

• Water-oriented use• No alternative upland location• Minimum fill necessary• Minimize harmful effect on Bay

resources• Fill is constructed accordance with

sound safety standards• Valid title to the property

September 2, 2021

5

PROPOSED REGULATION SECTIONS

• Work in the Bay• 10601(a)(6) – removal that involves no

substantial enlargement or change in use.• 10601(a)(2) – installation of new

shoreline protection

• 100-foot Shoreline Band• 10601(b)(5) – removal that involves no

substantial enlargement or change in use.• 10601(b)(1) – placement of fill that

does not have significant adverse impacts on future public access.

September 2, 2021

RELEVANT BAY PLAN POLICIES• Fish, Other Aquatic

Organisms and Wildlife• Subtidal Areas• Water Quality• Shoreline Protection• Safety of Fills• Climate Change• Public Access

6September 2, 2021

Terminal Four

Pt. Molate

Pt. San Pablo

San Francisco Bay

Recommended