Testing:
Testing is the process of trying to discover every conceivable fault or weakness in a work product
Quality Control:
A set of activities designed to evaluate a developed working product.
Quality Assurance:
A set of activities designed to ensure that the development and/or maintenance process is
adequate to ensure a system will meet its objectives.In simple words
* QUALITY CONTROL measures the quality of a product
* QUALITY ASSURANCE measures the quality of processes used to create a quality product.
Testers Goal:
The Goal of a software tester is to find bugs, find them as early as possible , and make sure they
get fixed
Defect/Software bug :
A software bug (or just "bug") is an error, flaw, mistake, failure, or fault in a computer program
that prevents it from behaving as intended
Testing TermsTesting Terms
8/8/2019 Testing Fundmentals
3/35
3
SREE CORP
Cost ofDefectsCost ofDefects
Cost ofDefects :
The cost of Correcting an error in a software
product increases dramatically at each new
phase in the products development life
cycle
The cost is maximized if the error is
detected after the product is shipped to the
customer
The cost is minimized if the error is detectedin the phase where it is introduced
It is known as the 1:10:100 Rule: the cost tofix a defect increases exponentially thelater in the development lifecycle that it is
identified.
A defect caught in requirements phase costs
a factor of 1 (1x) to fix.
A defect caught in construction costs 10
times as much as in requirements.
A defect caught in production costs up to 100
times as much as in requirements.
8/8/2019 Testing Fundmentals
4/35
4
SREE CORP
Distribution ofDefectsDistribution ofDefects
Distribution ofDefects
Specifications are the largest defect
producer and the next largest source of
defects is design
As per the studies 56% of the defects can be
traced back to incorrect requirements. This
aspect lays stress on the need for exhaustive
verification of requirements.
8/8/2019 Testing Fundmentals
5/35
5
SREE CORP
Software Products go through several stages as they mature from Initial Concept to
finished Product
The sequence of Stages is called a Life Cycle
SDLC Systems Development Life Cycle also called as Software Development Life
Cycle
It is a framework that describes the activities performed at each stage of a software
development projectFew Important SDLC models are
Big Bang Model
Code and Fix Model
Waterfall Model
Spiral Model
Proto Type Model
Agile Methodologies*
SDLC MODELSSDLC MODELS
8/8/2019 Testing Fundmentals
6/35
6
SREE CORP
Big Bang ModelBig Bang Model
The big-bang model for software development follows much the same principle as
shown in Figure B. A huge amount of matter (people and money) is put together, a lot
of energy is expendedoften violentlyand out comes the perfect software productor
it doesn't..
The beauty of the big-bang method is that it's simple. There is little (if any) planning,
scheduling, or formal development process. All the effort is spent developing the
software and writing the code.
It's an ideal process if the product requirements aren't well understood and the final
release date is flexible. It's also important to have very flexible customers, too,
because they won't know what they're getting until the very end.
8/8/2019 Testing Fundmentals
7/35
7
SREE CORP
SDLCSDLC CodeCode andand -- FixFix
A team using this approach usually starts with a rough idea of what they want, does
some simple design, and then proceeds into a long repeating cycle of coding, testing,
and fixing bugs. At some point they decide that enough is enough and release the
product.
It is only suitable for Project works , Programming assignments , short project whichdoes not require maintenance
After several fixes the code becomes poorly structured and it wont fulfill the needs
8/8/2019 Testing Fundmentals
8/35
8
SREE CORP
SDLCSDLC Waterfall ModelWaterfall Model
The waterfall model is the classical model of
development for both hardware and software. This
model is frequently called the conventional model. The
project is expected to progress down the (primary) path
through each of the phases (requirements, design,
coding and unit test, integration, and maintenance) of
development, with deliverables (software requirementsspecification, design documents, actual code and test
cases, final product, product updates) at each stage.
Waterfall model moves down a series of steps starting
from an Initial idea to a final product
waterfall performs well for products with clearly
understood requirements or when working with wellunderstood technical tools, architectures and
infrastructures.
Waterfall model is simple but unworkable as each stage
can and must be completed before the next one occurs
(Backing up to address mistakes is difficult )
8/8/2019 Testing Fundmentals
9/35
9
SREE CORP
SDLCSDLC Waterfall Model (2)Waterfall Model (2)
StrengthsStrengths
Easy to understand, easy to useProvides structure to inexperienced staff
Milestones are well understood
Sets requirements stability
Good for management control (plan, staff,
track)
Works well when quality is more important
than cost or schedule
WeaknessesWeaknesses
All requirements must be known upfrontDeliverables created for each phase are
considered frozen inhibits flexibility
Can give a false impression of progress
Does not reflect problem-solving nature of
software development iterations of phases
Integration is one big bang at the end
Little opportunity for customer to preview thesystem (until it may be too late)
When to Use :When to Use :
Requirements are very well knownProduct definition is stable
Technology is understood
New version of an existing product
Porting an existing product to a new platform
8/8/2019 Testing Fundmentals
10/35
10
SREE CORP
SDLCSDLC Spiral ModelSpiral Model
8/8/2019 Testing Fundmentals
11/35
11
SREE CORP
SDLCSDLC Spiral Model (2)Spiral Model (2)
Spiral model consists of iterative cycles
Spiral model can be considered a generalization of other process modelsEach cycle consists of four steps:
Step 1
Identify the objectives (for example: performance, functionality,
ability to accommodate change)
Identify the alternative means of implementing this portion of the
product (for example: different designs, reuse, buy)
Identify the constraints imposed on the application of the alternatives (for example: cost, schedule)
Step 2
Evaluate the alternatives relative to objectives and constraints.
Evaluate the risks involved with each alternative
Resolve the risks using prototyping, simulation, benchmarking, requirements analysis, etc.
Step 3
Develop and verify the product
Product could be the software requirements
specification, the design specification, etc.
Step 4
Plan the next phase
Depending on the next-phase this could be a requirements plan, an integration and test plan, etc.
8/8/2019 Testing Fundmentals
12/35
12
SREE CORP
SDLCSDLC Spiral Model (3)Spiral Model (3)
StrengthsStrengths
Provides early indication of insurmountablerisks, without much cost
Users see the system early because of rapid
prototyping tools
Critical high-risk functions are developed first
The design does not have to be perfect
Users can be closely tied to all lifecycle steps
Early and frequent feedback from usersCumulative costs assessed frequently
WeaknessesWeaknesses
Time spent for evaluating risks too large for smallor low-risk projects
Time spent planning, resetting objectives, doing
risk analysis and prototyping may be excessive
The model is complex
Risk assessment expertise is required
Spiral may continue indefinitely
Developers must be reassigned during non-development phase activities
May be hard to define objective, verifiable
milestones that indicate readiness to proceed
through the next iteration
When to Use :When to Use :
When creation of a prototype is appropriateWhen costs and risk evaluation is important
For medium to high-risk projects
Long-term project commitment unwise because of potential changes to economic priorities
Users are unsure of their needs
Requirements are complex
New product line
Significant changes are expected (research and exploration)
8/8/2019 Testing Fundmentals
13/35
13
SREE CORP
VV-- ModelModel
8/8/2019 Testing Fundmentals
14/35
14
SREE CORP
VV-- Model (2)Model (2)
StrengthsStrengths
Emphasize planning for verification and
validation of the product in early stages of
product development
Each deliverable must be testable
Project management can track progress by
milestonesEasy to use
WeaknessesWeaknesses
Does not easily handle concurrent events
Does not handle iterations or phases
Does not easily handle dynamic changes in
requirements
Does not contain risk analysis activities
When to Use :When to Use :
Excellent choice for systems requiring high reliability hospital patient control applicationsAll requirements are known up-front
When it can be modified to handle changing requirements beyond analysis phase
Solution and technology are known
8/8/2019 Testing Fundmentals
15/35
15
SREE CORP
Verification :
Verification is the process of evaluating a system or component to determine whether the
products of a given development phase satisfy the conditions imposed at the start of that
phase
Does not require execution of the code
Verification ensures the product is designed to deliver all functionality to the customer;
It typically involves reviews and meetings to evaluate documents, plans, code, requirements
and specifications; this can be done with checklists, issues lists, walk-through and inspection
meetings.
Validation :
Validation is the process of evaluating a system or component during or at the end of the
development process to determine whether it satisfies specified requirements
Involves executing the actual software or a simulated mockup
Validation ensures that functionality, as defined in requirements, is the intended behavior of
the product; validation typically involves actual testing and takes place after verifications are
completed.
Verification & ValidationVerification & Validation
8/8/2019 Testing Fundmentals
16/35
16
SREE CORP
Planning : Defining the system to be developed and scope of the project
(Note:In general Tester is not involved in this phase)
Requirements (Analysis) : Developing and analyzing the requirements
Requirements Verification
Test Strategy & Testing Estimates
Design : High & Low Level design
Design Verification
Test Plan & Test Scenarios
Environment Setup
Development : Coding
Test Script Creation & Verification
Requirements Mapping & Traceability
Testing
Deployment : Product Release
Production Checkout
Maintenance : Post Production support
Project Handover to Support
Post release analysis Report
SDLC PhasesSDLC Phases -- Tester InvolvementTester Involvement
8/8/2019 Testing Fundmentals
17/35
17
SREE CORP
Requirement : A requirement is a condition or capability needed by a user to solve a problem or achieve an
objective
Sometimes referred to as Spec , Product Spec
Software Requirements Specification (SRS): It defines the product they are creating , detailing what it will be , how it will act , what it
will do and what it wont do .
Requirement Verification : Requirement Verification is the activity to determine whether the Requirements are ready to
move forward into designProperties of Good Requirements Correct (match customer needs)
Possible (feasible)
Necessary (rather than nice-to-have)
Prioritized (very important, important, optional)
Unambiguous (users language )
Concise Verifiable (testable, measurable)
Complete have all significant requirements
Consistent all documents internally consistent
Changeable changes are a fact of life
Traceable a requirement can followed from its source to its fulfillment in design and code.
RequirementsRequirements
8/8/2019 Testing Fundmentals
18/35
18
SREE CORPTest Strategy :
The Test Strategy is the first document QA should prepare for any project. This is a living
document that should be maintained/updated throughout the project.
The Test Strategy is a high-level document that details how we are going to approach the testing in
terms of people, tools, procedures and support. This document can vary based on the project.
Components in the Test Strategy are as follows:
1. Scope and objective
2. Business issues
3. Roles and responsibilities
4. Communication and status reporting
5. Test deliverability
6. Test approach
7. Test automation and tools
8. Testing measurements and metrics
9. Risks and mitigation10.Defect reporting and tracking
11.Change and configuration management
12.Training plan
Requirements (2)Requirements (2) -- Test StrategyTest Strategy
8/8/2019 Testing Fundmentals
19/35
19
SREE CORP
Estimate : Estimate is the prediction of the effort associated with project scope given a set ofassumptions
- The answer to how long will it take to ? after thinking all possible scenarios and considering
realistic assumptions
Estimation approaches
Metrics-Based Approach:A useful approach is to track past experience of an organization's various projects and the
associated test effort that worked well for projects. Once there is a set of data covering
characteristics for a reasonable number of projects, then this 'past experience' information can beused for future test project planning. For each particular new project, the 'expected' required test
time can be adjusted based on whatever metrics or other information is available, such as function
point count, number of external system interfaces, risk levels of the project, etc.
Test Work Breakdown Approach:Another common approach is to decompose the expected testing tasks into a collection of small
tasks for which estimates can, at least in theory, be made with reasonable accuracy. This of course
assumes that an accurate and predictable breakdown of testing tasks and their estimated effort isfeasible. In many large projects, this is not the case. For example, if a large number of bugs are
being found in a project, this will add to the time required for testing, retesting, bug analysis and
reporting. It will also add to the time required for development, and if development schedules and
efforts do not go as planned, this will further impact testing.
Percentage-of-Development Approach:40 60% of Programming effort
Requirements (3)Requirements (3) Testing EstimatesTesting Estimates
8/8/2019 Testing Fundmentals
20/35
20
SREE CORP
FunctionalDesign /ExternalDesign/High LevelDesign :
Functional design is the process of translating user requirements into external Interfaces andthe output of the process is functional design specification
TechnicalDesign/ InternalDesign /Low LevelDesign Technical design is the process of translating the functional specification into a detailed set of
data structures, data flows, and algorithms. The output of the process is the technical designspecification
Design Verification : D
esignVerification is the process to verify the correctness and completeness of the
DesignComponents
Environment : Test Environments include hardware and software requirements including dependencies, stubs
and test drivers required for execution of testing cycles
Ultimate goal is to replicate the testing configuration and settings as close as possible to theProduction Environment
Types of Environments
1) Development Environment2) Test Environment
a) Integration Test Environment
b) End to End or System test Environment
c) Load test Environment
d) Pre Production Environment
3) Production Environment
DesignDesign
8/8/2019 Testing Fundmentals
21/35
8/8/2019 Testing Fundmentals
22/35
22
SREE CORP
Test Case (IEEE-610) - A set of test inputs, execution conditions, and expected results developed
for a particular objective
Test Plan: A detail of how the test will proceed, who will do the testing, what will be tested, in
how much time the test will take place, and to what quality level the test will be performed.
Test Design Specification: A detail of the test conditions and the expected outcome. This
document also includes details of how a successful test will be recognized.
Test Case Specification: A detail of the specific data that is necessary to run tests based on the
conditions identified in the previous stage.
Test Procedure Specification: A detail of how the tester will physically run the test, the physical
set-up required, and the procedure steps that need to be followed.
Test Item Transmittal Report: A detail of when specific tested items have been passed from one
stage of testing to another.
Test Log: A detail of what tests cases were run, who ran the tests, in what order they were run,
and whether or not individual tests were passed or failed.
Test Incident Report: A detail of the actual versus expected results of a test, when a test has
failed, and anything indicating why the test failed.
Some Testing DefinitionsSome Testing Definitions
Reference:
http://en.wikipedia.org/wiki/IEEE_829
8/8/2019 Testing Fundmentals
23/35
23
SREE CORP
Test Scenario : A set of test cases that ensure that the business process flows are tested from end
to end. They may be independent tests or a series of tests that follow each other, each dependent
on the output of the previous one
Test Script: Commonly used to refer to the instructions for a particular test that will be carriedout by an automated test tool.
Test suite: A collection of test scenarios and/or test cases that are related or that may cooperatewith each other
**** In simple words
Test Case : A set of test data, test programs and expected results.Test Scenario : A set of test cases.Test Suite : A collection of test cases and/or test scenarios.
Some Testing Definitions (2)Some Testing Definitions (2)
8/8/2019 Testing Fundmentals
24/35
24
SREE CORP
Coding : Coding is the process of Translating the detailed internal design specification into a
specific set of directions, code.Test case Creation : Requirement is the primary base for the test case Creation, Functional designand other documents will be referred for more clarity
Methods used for Test Case Creation :
- Equivalence Partitioning : A test case design technique for a component in which testcases are designed to execute representatives from equivalence classes.
(Equivalence Class:A portion of a component's input or output domains for which the
component's behavior is assumed to be the same from the component's specification)- Boundary Value analysis : In boundary value analysis, test cases are generated using the
extremes of the input domain, e.g. maximum, minimum, just inside/outside boundaries,
typical values, and error values. BVA is similar to Equivalence Partitioning but focuses on
"corner cases".
- Error Guessing : An approach , guided by Intuition and experience to identify tests which are
presumed likely to expose errors. The basic idea is to make a list of possible errors or error
prone situations
DevelopmentDevelopment
8/8/2019 Testing Fundmentals
25/35
25
SREE CORP
Test Script or Test Case Verification :Purpose of the Test Script Verification process is to ensure
the quality of TestScripts & satisfactory requirements coverage
Techniques followed for Test case verification
Test Coverage : Various ways in which we can measure the completeness of testing with respect torequirements & functionality , The primary method is Traceability matrix
(Traceability Matrix:A document showing the relationship between Test Requirements and testCases)
Peer Reviews: Each script is reviewed by one other Testing Team member
Walk thru : A walk-through is an informal meeting for evaluation or informational purposes. A
walk-through is also a process at an abstract level. It's the process of inspecting software code byfollowing paths through the code (as determined by input conditions and choices made along theway). The purpose of code walk-through is to ensure the code fits the purpose.
Inspection : An inspection is a formal meeting, more formalized than a walk-through and typicallyconsists of 3-10 people including a moderator, reader (the author of whatever is being reviewed)and a recorder (to make notes in the document). The subject of the inspection is typically adocument, such as a requirements document or a test plan. The purpose of an inspection is to findproblems and see what is missing, not to fix anything. The result of the meeting should bedocumented in a written report. Attendees should prepare for this type of meeting by readingthrough the document, before the meeting starts; most problems are found during thispreparation. Preparation for inspections is difficult, but is one of the most cost-effective methodsof ensuring quality, since bug prevention is more cost effective than bug detection
Note : Peer Reviews , Walk Thru , Inspection meetings are the common techniques for any kind ofverifications
DevelopmentDevelopment
8/8/2019 Testing Fundmentals
26/35
8/8/2019 Testing Fundmentals
27/35
27
SREE CORP
Testing Phases
These are the phases of testing life cycle in which test execution happens
These are phases of testing executed in parallel to the Development Phases and relate to the
level of testing with the unit of system/application under test
The Testing Phases are
Unit Testing
Integration Testing
System Testing
Load Testing
User Acceptance Testing
Testing Types
These are techniques/methods of testing the application in a typical phase of testing
One type of testing can happen across different phases
The Testing Types are Smoke Testing , Stability Testing , Break Testing etc ..
TestingTesting
8/8/2019 Testing Fundmentals
28/35
28
SREE CORP
Unit or Module or Component Testing :
Module or Unit Testing is the Process of testing individual components (sub programs orProcedures of a program)
Conducted by application developers
Logic Coverage : a) Statement Coverage
b) Decision (branch) coverage
c) Condition Coverage
d) Path Coverage
Driver :Driver module transmits test case
(in the form of Input arguments) to x and either prints or interprets the
- Result produced by x
Stub :Stub module simulates the function of a module called by x
Testing PhasesTesting Phases
Stub DriverUnit
UnderTest Call
Access to Non Local Variables
Call
Testing a Functional Unit under Test
8/8/2019 Testing Fundmentals
29/35
29
SREE CORP
Integration testing :
Integration testing : Integration testing is the Process of Combining and Testing multiplecomponents together
Non Incremental (Big Bang) Integration : Unit test each program independently andcombine all the components (at once) to form the program and test the integrated result
Incremental Integration : Unit test the next program component after combining it with theset of previously-tested components
- Bottom Up Integration : Integration begins with the terminal modules of the execution
hierarchy- Top Down Integration : Integration begins with the top module in the execution
hierarchy
System testing :
A type of testing to confirm that all code modules work as specified, and that the system as a
whole performs adequately on the platform on which it will be deployed..
Testing that attempts to discover defects that are properties of the entire system rather thanof its individual components.
It covers all combined parts of a system.
Testing Phases (2)Testing Phases (2)
8/8/2019 Testing Fundmentals
30/35
30
SREE CORP
Load Testing:
Load Testing : Testing an application under heavy but expected loads is known as loadtesting.
Performance Testing: Testing the system performance for response time of transactions
Stress Testing : Stress testing is subjecting a system to an unreasonable load while denying itthe resources (e.g., RAM, disc, mips, interrupts, etc.) needed to process that load. The idea
is to stress a system to the breaking point in order to find bugs that will make that break
potentially harmful. The system is not expected to process the overload without adequate
resources, but to behave (e.g., fail) in a decent manner (e.g., not corrupting or losing data).Bugs and failure modes discovered under stress testing may or may not be repaired depending
on the application, the failure mode, consequences, etc. The load (incoming transaction
stream) in stress testing is often deliberately distorted so as to force the system into resource
depletion.
Volume Testing: Volume testing is used to determine if the system under test can handle the
required amounts of data, user requests, etc
User Acceptance Testing : Acceptance testing is the Process of comparing the end product tothe current needs of its end users mainly validates that the system supports business or operation
needs from the user perspective agreed upon during the Definition Phase
Alpha Testing : Alpha test is usually performed by end users inside the developing company butoutside the development/testing organization
Beta Testing: Beta test is usually performed by a selected subset of actual customers outside thecompany, before the software is made available to all customers
Testing Phases (3)Testing Phases (3)
8/8/2019 Testing Fundmentals
31/35
31
SREE CORP
Functional testing:
Testing the features and operational behavior of a product to ensure they correspond to itsspecifications.
Testing that ignores the internal mechanism of a system or component and focuses solely onthe outputs generated in response to selected inputs and execution conditions.
End-to-end testing:Similar to system testing; the macro end of the test scale; involves testing of a completeapplication environment in a situation that mimics real-world use, such as interacting with adatabase, using network communications, or interacting with other hardware, applications, or
systems if appropriate.Sanity testing:Typically an initial testing effort to determine if a new software version is performing well enoughto accept it for a major testing effort. For example, if the new software is crashing systems every5 minutes, bogging down systems to a crawl, or destroying databases, the software may not be in asane enough condition to warrant further testing in its current state.
Regression testing:
Re-testing after fixes or modifications of the software or its environment. It can be difficult todetermine how much re-testing is needed, especially near the end of the development cycle.Automated testing tools can be especially useful for this type of testing.
Usability testing:Testing for user-friendliness. Clearly this is subjective, and will depend on the targeted end-useror customer. User interviews, surveys, video recording of user sessions, and other techniques canbe used. Programmers and testers are usually not appropriate as usability testers.
TestingTesting TypesTypes
8/8/2019 Testing Fundmentals
32/35
32
SREE CORP
Install/uninstall testing:
Testing of full, partial, or upgrade install/uninstall processes.
Recovery testing:
Testing how well a system recovers from crashes, hardware failures, or other catastrophic
problems.
Security testing:
Testing how well the system protects against unauthorized internal or external access, willful
damage, etc; may require sophisticated testing techniques.
Compatibility testing:
Testing how well software performs in a particular hardware/software/operating
system/network/etc. environment.
Exploratory testing:
Often taken to mean a creative, informal software test that is not based on formal test plans or
test cases; testers may be learning the software as they test it.
Ad-hoc testing:Similar to exploratory testing, but often taken to mean that the testers have significant
understanding of the software before testing it.
Comparison testing:
Comparing software weaknesses and strengths to competing products.
TestingTesting TypesTypes
8/8/2019 Testing Fundmentals
33/35
33
SREE CORP
Why standards ?:The use of standards simplifies communication , promotes consistency and
uniformity , and eliminates the need to invent yet another solution to the same problem
IEEE : Institute of Electrical and Electronics Engineers' - among other things, creates standardssuch as 'IEEE Standard for Software Test Documentation' (IEEE/ANSI Standard 829), 'IEEE Standard
of Software Unit Testing (IEEE/ANSI Standard 1008), 'IEEE Standard for Software Quality Assurance
Plans' (IEEE/ANSI Standard 730), and others.
ANSI : 'American National Standards Institute', the primary industrial standards body in the U.S.;publishes some software-related standards in conjunction with the IEEE and ASQ (American Society
for Quality). ISO 9000 : A set of international standards for both quality management and quality assurance
that has been adopted by over 90 countries worldwide. The ISO 9000 standards apply to all types of
organisations, large and small, and in many industries.
ISO 9001 covers design and development. ISO 9002 covers production, installation and
service, and ISO 9003 covers final testing and inspection. ISO 9000 certification does not
guarantee product quality. It ensures that the processes that develop the product are
documented and performed in a quality manner.
StandardsStandards
8/8/2019 Testing Fundmentals
34/35
34
SREE CORP
Capability Maturity Model : A process developed by SEI in 1986 to help improve, over time,
the application of an organization's supporting software technologies. The process is broken intofive levels of sequential development: Initial, Repeatable, Defined, Managed and Optimizing.
(SEI - SEI = 'Software Engineering Institute' at Carnegie-Mellon University; initiated by the U.S.
Defense Department to help improve software development processes. )
Level 1 Initial : Unpredictable and poorly controlled
Characterized by chaos, periodic panics, and heroic efforts required by individuals to successfully
complete projects. Few if any processes in place; successes may not be repeatable.
Level 2 Repeatable : Can repeat Previously mastered tasks
Software project tracking, requirements management, realistic planning, and configuration
management processes are in place; successful practices can be repeated.
Level 3 Defined : Process characterized , fairly well understood
Standard software development and maintenance processes are integrated throughout an
organization; Software Engineering Process Group is in place to oversee software processes, and
training programs are used to ensure understanding and compliance.
Level 4 Managed : Process measured and controlled
Metrics are used to track productivity, processes, and products. Project performance is
predictable, and quality is consistently high.
Level 5 Optimizing : Focus on process Improvement
The focus is on continuous process improvement. The impact of new processes and technologies
can be predicted and effectively implemented when required.
StandardsStandards
8/8/2019 Testing Fundmentals
35/35
35
SREE CORP
Testing Life CycleTesting Life Cycle
Test Requirements
Requirement Specification documents
Functional Specification documents
Design Specification documents (use cases, etc) Use case Documents
Test Trace-ability Matrix for identifying Test Coverage
Test Planning
Test Scope, Test Environment
Different Test phase and Test Methodologies
Manual and Automation Testing
Defect Mgmt, Configuration Mgmt, Risk Mgmt. Etc
Evaluation & identification Test, Defect tracking tools
Test Environment Setup
Test Bed installation and configuration
Network connectivitys
All the Software/ tools Installation and configuration
Coordination with Vendors and others
Test Design
Test Traceability Matrix and Test coverage
Test Scenarios Identification & Test Case preparation
Test data and Test scripts preparation
Test case reviews and Approval
Base lining under Configuration Management
Test Automation
Automation requirement identification
Tool Evaluation and Identification.
Designing or identifying Framework and scripting
Script Integration, Review and Approval
Base lining under Configuration Management
Test Execution andDefect Tracking
Executing Test cases
Testing Test Scripts
Capture, review and analyze Test Results
Raised the defects and tracking for its closure
Test Reportsand Acceptance
Test summary reports
Test Metrics and process Improvements made
Build release
Receiving acceptance
Recommended