General Studies Workshop GSP / CDF Concurrent Design Facility Activity Report and Plans ESTEC - 14 September 2006 M. Bandecchi - TEC-SYE Concurrent Engineering section. The Concurrent Design Facility was an initiative of and sponsored by the General Study Program in 1998 - PowerPoint PPT Presentation
Citation preview
ESTEC, 14 September 2006 GSP workshop 1
CDF
General Studies Workshop
GSP / CDFConcurrent Design FacilityActivity Report and Plans
ESTEC - 14 September 2006
M. Bandecchi - TEC-SYEConcurrent Engineering section
ESTEC, 14 September 2006 GSP workshop 2
CDF
The Concurrent Design Facility was an initiative of and sponsored by the General Study Program in 1998 It became a TEC operational facilityin 2000.
ESTEC, 14 September 2006 GSP workshop 3
CDFAchievements
Activities performed• 60+ (potential) future missions studied and designed internally at pre-Phase A,
conceptual, system level
• 3 new launcher concept design
• 8 complex payload instrument design (IDA), incl. Platform, system, mission
• 10 reviews of Industrial Phase A studies (internal + Industry)
• 5 ISS on-board facilities/experiments accommodation studies; teaming with/supporting Industry in Phase A
• Joint studies (Distributed Concurrent Engineering) with NASA/JPL/PDC-Team X, CNES CIC, Industry
• Educational, training, promotion and standardisation activities
Other figures:• 270 currently registered users
• 497 ESA specialists, scientists, study/project managers have used the CDF
• 55000 hours of CDF server desk-top provided in 1 year (Sept.05-Aug.06)
• Hundreds of visitors every year (e.g. 800 in 2004)
ESTEC, 14 September 2006 GSP workshop 4
CDF
ESTEC, 14 September 2006 GSP workshop 5
CDFSpin-off
• Request to transfer CDF know-how and software to national Agencies, Industry, Academia.
• Core CDF model (IDM) delivered to CNES, ASI, CSA, various industries, being subject of an ECSS standardisation exercise: ECSS E-10-01 (“TM”)
How influential have we been?
Based on the CDF model, the following facilities have been (are being) created: CNES CIC 2005 ASI CEF 2006 pl. AAS (F) “Cannes” CDF 2006 pl. Un. Sapienza Rome CDF 2006 EPFL (CH) CDF 2006 pl. VSSEC (Aus) CDF 2006
ESTEC, 14 September 2006 GSP workshop 6
CDF
CDF Customer Distribution2001 - 2005
Overall activity 80% GSP funded
Science31%
GSP (*) 17%
Aurora / Exploration27%
MSM / ISS13%
Earth Observation6%
Launchers6%
Science
GSP
Aurora / Exploration
MSM / ISS
Earth Observation
Launchers
(*) GSP direct
ESTEC, 14 September 2006 GSP workshop 7
CDF
• EOP: – XMWR: modelling activity for a LEO cross track MicroWave
Radiometer• SCI:
– REIS: Review of Europa Industrial Study– WFI: Wide Field Imager– FIM: Far Infrared Mission
• LAU:– Socrates 2
• GSP:– DCP: Dual cryogenic propulsion study– SOC: System on Chip– FBW: fly by wireless– DMA5: A5 Dual mission launches– RamELEC: Ram Electric propulsion thrusters for very low orbit
observation satellites and planetary exploration• HME:
– Phobos Sample return
Studies planned in 2006
ESTEC, 14 September 2006 GSP workshop 8
CDFLooking for new applications of CDF and CE
Application of CEto later phases
and to a large community
Model technologiesdevelopment
New technologiesImplementation
for future missions
- GSP contracton application of CEto anomaly treatment- GSP CDF study: NEO review of phase A
GSP contracton instrumentmodelling
GSP CDF studies:- Fly by wirelessin flight demonstration- Combined long termcryogenic propulsionfor interplanetary mission
ESTEC, 14 September 2006 GSP workshop 9
CDF
Plans
• Consolidation of the CDF Integrated Design Model (IDM) – creation of a ‘product’ IDM - to be able to distribute it to the institutional partners
• Extension of the CDF service to other Customers / Programmes (e.g Telecom), developing/integrating related tools and competences
• Application to new mission and system concepts (e.g. system on chip), developing new specific models and architectures
• Creation of an European distributed concurrent / collaborative environment to favourite the application of Concurrent Engineering to later phases of the project life-cycle.
• “GRID-based Distributed Concurrent Design” on-going TRP project for the study and prototype of a Virtual Distributed Design Facility, GRID based
ESTEC, 14 September 2006 GSP workshop 10