GEORGIA DOME RENOVATION PHASE 2

August 16, 2007

General Admission Concourse Lower Level

Option A

Option B

Option C

Score Board Upgrade

Seating Bowl Color Study – All Red Option

Seating Bowl Color Study – Red & Black Option

Seating Bowl Color Study

Seating Bowl Color Study – All Red Option

Seating Bowl Color Study – Red & Black Option

General Admissions Seating Club Seating Suite Seating

Exterior Painting Study Option D

Exterior Painting Study Option D

Seating Bowl w/ Window

$1,376,000

Remove existing metal panels at the drum and add back new curtain wall glazing system with motorized blackout shades.

EXTERIOR GLAZING

Recommended