The Installation Process applicable for new buildings

Preview:

Citation preview

The Installation Processapplicable for new buildings

Removal of dead mortar from the roof slab

Removal of dead mortar from the roof slab

Removal of dead mortar from the roof slab

Cleaning work in progress

Cleaning work in progress

Dead mortar removed from the surface of the roof slab

Roof slab after cleaning

Exposed reinforcements on the roof slab

Opening up of the floor-wall junction of parapet wall

Opening up of the floor-wall junction

Exposed floor-wall junction of column

Exposed floor-wall junction of parapet wall

Spraying of crystallization product on the roof slab towards waterproofing

Spraying of crystallization product on the roof slab towards waterproofing

Sealing of floor-wall junctions using polymer modified sealant

Sealing of floor-wall junctions using elastomeric compounds

Mixing concrete for slope making

Slope making in progress

Curing after slope making

Curing after slope making

Curing after slope making

Laying of bed mortar for fixing THERMATEK® Heat Resistant Terrace Tiles

Fixing of THERMATEK® Heat Resistant Terrace Tiles on the bed mortar

Laying of THERMATEK® Heat Resistant Terrace Tiles in progress

Tiling completed - before polishing

Cutting of tiles for skirting

45° cutting of skirting tiles

Skirting tiles ready for fixing

Skirting tiles ready for fixing

Fixing of skirting tiles

Polishing of THERMATEK® Heat Resistant Terrace Tiles in progress

Polishing of THERMATEK® Heat Resistant Terrace Tiles in progress

THERMATEK® tiled terrace

THERMATEK® tiled terrace

Skirting

Skylight opening

The final look

The final look

Thank you!

Manufacturer:ISHAAN INDUSTRIES

"An Associate of Parashuram Pottery Works Co. Ltd.Gandevi Road, Bilimora - 396 380

Dist. Navsari, Gujarat.

Contact Person: Mr. Amit Ganpule Tel: 02634 284416 Mobile: +91-9426117277

Website: http://www.thermatek.co.inE-mail: info@thermatek.co.in