The Key of Installation and Commissioning

Preview:

Citation preview

7/25/2019 The Key of Installation and Commissioning

http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 1/25

HUAWEI TECHNOLOGIES CO., LTD.

www.huawei.com

Huawei Confidential

Security Level:02/06/16

Net work product Introduction

Dept

Xing Zibin/59397

!e "ey o# In$t%ll%tion%nd &o''i$$ioning

7/25/2019 The Key of Installation and Commissioning

http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 2/25

Contents

• The Key of Installation

• The Key of Commissioning

• Precautions for Dangerous Handling

7/25/2019 The Key of Installation and Commissioning

http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 3/25

HUAWEI TECHNOLOGIES CO., LTD.Page 3

Huawei Confidential

(e#ore 'ount t!e %ntenn%) *r$t to 'ount t!e +nti,

#%ll &l%'p

 The key of Installation

7/25/2019 The Key of Installation and Commissioning

http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 4/25

HUAWEI TECHNOLOGIES CO., LTD.Page 4

Huawei Confidential

 The key of Installation

 In$t%ll%tion o# %ntenn%

Note: Remove the rubber plugs of the two air holes on the bottom

of the antenna, as shown in gure with red circles.

7/25/2019 The Key of Installation and Commissioning

http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 5/25

HUAWEI TECHNOLOGIES CO., LTD.Page 5

Huawei Confidential

Note: Remove the rust and anti-rust paint from the iron tower

when xing the grounding clip.

 The key of Installation

 -D. %nd I c%ble grounding

7/25/2019 The Key of Installation and Commissioning

http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 6/25

HUAWEI TECHNOLOGIES CO., LTD.Page 6

Huawei Confidential

 The key of Installation

 !e 0u%lity o# I connector

Note: Rotate the lock nut instead of the connector shell to tightenthe connector. Use proper force to rotate the lock nut to preventdamaging the outer covering of the connector.

 After making the IF connector, we must to check it is ashort circuit or not!

7/25/2019 The Key of Installation and Commissioning

http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 7/25

HUAWEI TECHNOLOGIES CO., LTD.Page 7

Huawei Confidential

I c%ble l%bel

Before the IF cables are hoisted, take roer rotection

measures and dustroof measures for the IF cable connectors.

!abel the cables so that the main cables can be distin"uished

from the standby cables, and there is no confusion when IF

cables are connected. 

 The key of Installation

7/25/2019 The Key of Installation and Commissioning

http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 8/25

HUAWEI TECHNOLOGIES CO., LTD.Page 8

Huawei Confidential

 The key of Installation

!e in$t%ll%tion o# -D.12%y 'ore %ttention to t!e pol%ri4%tion

o# t!e -D./%ntenn% %nd coupler

62 !e '%in -D. 'u$t be in$t%lled on t!e '%in

inter#%ce o# t!e coupler) %nd t!e $t%ndby

-D. 'u$t be in$t%lled on t!e $t%ndby

inter#%ce o# t!e coupler

%in

7/25/2019 The Key of Installation and Commissioning

http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 9/25

HUAWEI TECHNOLOGIES CO., LTD.Page 9

Huawei Confidential

8n$ure t!%t t!e I inter#%ce on t!e -D. #%ce$ le#t or rig!t)

downw%rd$) %#ter t!e -D. in$t%ll%tion i$ co'plete

 The key of Installation

#nsure that the IF interface on the $%& faces left or ri"ht, downwards, after the $%& installation

7/25/2019 The Key of Installation and Commissioning

http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 10/25

HUAWEI TECHNOLOGIES CO., LTD.Page 10

Huawei Confidential

 The key of Installation  %ter proo# o# t!e I inter#%ce on -D. %nd I c%ble grounding

Note: hen wrapping the connector with the waterproof tape and !"# tape, $ou should

stretch the tape to %&' of its original width. (n addition, the upper la$er should cover

about )&* of the lower la$er.

7/25/2019 The Key of Installation and Commissioning

http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 11/25

HUAWEI TECHNOLOGIES CO., LTD.Page 11

Huawei Confidential

 The key of Installation  %ter proo# o# I c%ble grounding

Note: +trip the sheath o the ( cable according to the length of the

grounding clip. o not strip an$ shielding la$er of the ( cable.

Note: o not ground the ( cable at the point where the cable is bent.

7/25/2019 The Key of Installation and Commissioning

http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 12/25

HUAWEI TECHNOLOGIES CO., LTD.Page 12

Huawei Confidential

 The key of Installation +#ter t!e %lign'ent o# %ntenn%) you 'u$t be $ure t!e

%ntenn% i$ locked

e !%ve to c!eck t!e volt%ge o# input power

(nstall the black cable to the working ground busbar, and

install the blue cable to the air breaker 

(f the standard voltage of the input power is /'0 ", the tested value of the

voltage should range from /%0.' " to -12.3 ".

7/25/2019 The Key of Installation and Commissioning

http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 13/25

HUAWEI TECHNOLOGIES CO., LTD.Page 13

Huawei Confidential

&ontent$

!e "ey o# In$t%ll%tion

!e "ey o# &o''i$$ioning

rec%ution$ #or D%ngerou$ %ndling

7/25/2019 The Key of Installation and Commissioning

http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 14/25

HUAWEI TECHNOLOGIES CO., LTD.Page 14

Huawei Confidential

 The key of 'ommissionin"

1/ !e con*gur%tion o# I 1;1 $y$te' <S( %nd D212 !e '%in I bo%rd 'u$t be connected to t!e '%in -D. %nd

t!e $t%ndby I bo%rd 'u$t be connected to t!e $t%ndby -D.

62 !e 'et!od o# c!ecking I 1;1 $y$te' <S( %nd D2

&!eck t!e receive power o# t!e '%in %nd $t%ndby -D. !e

receive power o# '%in -D. $!ould be l%rger t!%n $t%ndby

-D.

I# cu$to'er %$k u$ to open t!e +&) ple%$e p%y 'ore

%ttention to t!e +& lower t!re$!old It 'u$t be l%ger

1=d(' t!%n t!e receive t!re$!old o# t!e -D. I# t!e

cu$to'er !%ve no t!e re0uire'ent) no need to open t!e

+&

7/25/2019 The Key of Installation and Commissioning

http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 15/25

HUAWEI TECHNOLOGIES CO., LTD.Page 15

Huawei Confidential

 The key of 'ommissionin"

I# it i$ % 1;1 $y$te') turn o> t!e $t%ndby -D. %nd

'%ke $ure t!e +& i$ di$%bled w!en %ligning t!e

%ntenn%$

I# t!e bot! o# I bo%rd$ %nd -D.$ %re nor'%l) butt!e receive power o# %in -D. i$ le$$ %bout ?d('

t!%n $t%ndby -D.) '%ybe t!e '%in -D. connect$

to t!e $t%ndby I bo%rd @ou c%n *r$tly turn o> t!e

'%in %nd $t%ndby -D.A$ power) %nd t!en eBc!%nge

t!e I Cu'per$ o# '%in %nd $t%ndby I bo%rd$

7/25/2019 The Key of Installation and Commissioning

http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 16/25

HUAWEI TECHNOLOGIES CO., LTD.Page 16

Huawei Confidential

&ontent$

!e "ey o# In$t%ll%tion

!e "ey o# &o''i$$ioning

rec%ution$ #or D%ngerou$ %ndling

7/25/2019 The Key of Installation and Commissioning

http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 17/25

HUAWEI TECHNOLOGIES CO., LTD.Page 17

Huawei Confidential

(recautions for %an"erous)andlin" rec%ution$ #or %ndling #or t!e oggle Lever

Switc!

!ocation and (ositions of the To""le !e*er +witch

7/25/2019 The Key of Installation and Commissioning

http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 18/25

HUAWEI TECHNOLOGIES CO., LTD.Page 18

Huawei Confidential

(recautions for %an"erous)andlin" rec%ution$ #or %ndling #or t!e oggle Lever Switc!

Before turnin" the to""le le*er switch, you must ull i t out sli"htly.  Turn on the ower switch

 Turn on the ower switch

7/25/2019 The Key of Installation and Commissioning

http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 19/25

HUAWEI TECHNOLOGIES CO., LTD.Page 19

Huawei Confidential

(recautions for %an"erous)andlin" rec%ution$ #or %ndling t!e I u'per

Before remo*in" or insertin" the IF umer, you must owero- the $%&.

7/25/2019 The Key of Installation and Commissioning

http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 20/25

HUAWEI TECHNOLOGIES CO., LTD.Page 20

Huawei Confidential

(recautions for %an"erous)andlin"

rec%ution$ #or %ndling t!e I u'per %o not remo*e or insert the IF umer when the $%& is

owered on.

7/25/2019 The Key of Installation and Commissioning

http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 21/25

HUAWEI TECHNOLOGIES CO., LTD.Page 21

Huawei Confidential

(recautions for %an"erous)andlin" rec%ution$ #or %ndling t!e I &%ble

Before remo*in" or insertin" the IF cable, you must owero- the $%&.

7/25/2019 The Key of Installation and Commissioning

http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 22/25

HUAWEI TECHNOLOGIES CO., LTD.Page 22

Huawei Confidential

(recautions for %an"erous)andlin" rec%ution$ #or %ndling t!e I &%ble %o not remo*e or insert the IF cable when the $%& is

owered on.

7/25/2019 The Key of Installation and Commissioning

http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 23/25

HUAWEI TECHNOLOGIES CO., LTD.Page 23

Huawei Confidential

(recautions for %an"erous)andlin" rec%ution$ #or %ndling t!e I (o%rd

Before remo*in" or insertin" the IF board, you must owero- the $%&.

7/25/2019 The Key of Installation and Commissioning

http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 24/25

HUAWEI TECHNOLOGIES CO., LTD.Page 24

Huawei Confidential

(recautions for %an"erous)andlin" rec%ution$ #or %ndling t!e I (o%rd %o not remo*e or insert the IF board when the $%& is

owered on.

7/25/2019 The Key of Installation and Commissioning

http://slidepdf.com/reader/full/the-key-of-installation-and-commissioning 25/25

Thank youwww.huawei.com