The travel solution for our time 1 High-Speed Rail at Amtrak Frank Vacca, Chief Engineer June 24,...

Preview:

Citation preview

1The travel solution for our time

High-Speed Railat

Amtrak

Frank Vacca, Chief EngineerJune 24, 2011

2The travel solution for our time

Rail Resurgence

• Record ridership

• Record revenues

• 19 months of month over month improvement

• Fuel costs climbing

• Favorable transportation and energy policies

• HSR excitement

3The travel solution for our time

HSR Opportunities in America

• Florida – Project Cancelled

• California– 220 mph – 800 mile network

– $3.5B in HSIPR grants – ($45B investment)

• Midwest (Midwest Regional Rail Initiative)– $1.1B grant - St. Louis-Chicago line (110 mph)

• Northeast Corridor (NEC) Operating Today– Next Gen-HSR plan

– Stair-step approach

4The travel solution for our time

• 2nd largest mega-region in the world

• Economic and political capital of the Americas

• Population density =/> Europe and 12 times US average

• 457 route miles 12 states, DC

• 8 commuter operators

• Class 1 and regional freight

• Amtrak high speed, regional, long-distance

• 8 airports

• 12 ports

50 million people

(Northeast megaregion)

Northeast Corridor – Regional Overview

5The travel solution for our time

NEC Master Plan

• NEC Commission sponsored:

• NEC Master Plan ($52 Billion) - Goals– Corridor to state-of-good repair

– 2030 planning horizon

– Maximize capacity and travel times in corridor

– Continued shared-use railway operation (freight, commuter, regular and high-speed)

Existing Master Plan (2030)

2:422:15

3:353:08

NYC - DC

NYC - BOS

• Travel Times

6The travel solution for our time

Northeast Corridor - 2030

16

Amtrak Ridership Growth Under Master Plan

+35%

+33%

+10%+8%

Capacity-Constrained

Growth

• By 2030 Under NEC Master Plan– Capacity exceeded

– Limited ability to:

◦ Increase service

◦Lower travel times

◦Attract New Riders

• NEC intercity travel demand will double by 2050

• Other NEC modes have limited growth potential

• Corridor needs new capacity to compete in worldwide economy

7The travel solution for our time

Amtrak Next Gen HSR Vision

• World-Class High-Speed Network– Dedicated 2-track alignment

– 220 mph equipment

– 40% - 60% travel-time reductions in key markets

– Boston–Washington DC: from 6:30 to 3:20

NYC - DC

NYC - BOS

Existing Master Plan (2030)

2:422:15

3:35

3:08

1:36

1:24

Next-Gen HSR Plan

8The travel solution for our time

Amtrak Next Gen HSR Vision

• Rolling Stock– Similar to Acela but 8 vs. 6 cars

– 400-passenger capacity

– Speeds up to 350 kph

– EMU-style distributed power, bi-level consists also possible

• Infrastructure– Dedicated 2-track system

– Minimum 4 tracks at stations (turns & passing moves)

– Heavy use of tunnels & structures to meet alignment requirements, minimize impacts

9The travel solution for our time

Potential Alignments: NY to BOS

Challenges• Boston to New York

alignment poses difficult challenges

• Capacity limits on New Haven Line

• Curvature, capacity and environmental concerns on Shore Line (New Haven to MA state line)

Analyzed Alignment

• Diverges north of New Rochelle to serve CT and RI

• Converges with NEC alignment at Rt. 128 station in MA

“Analyzed Alignment’ used for costing and analysis purposes, subject to further analysis in next phase

10The travel solution for our time

Challenges• Utilize existing NEC corridor where possible

• Providing service to built-up CBD areas in key cities

Analyzed Alignment

• Substantially parallels NEC

• New stations in Baltimore and Philadelphia more centrally located“Analyzed Alignment’ used for costing and analysis purposes,

subject to further analysis in next phase

Potential Alignments: DC to NY

11The travel solution for our time

• $117 Billion (in $2010)– Equivalent of $4.7 Billion annually

over 25 years of construction

– $275 million/mile for infrastructure, stations, facilities

– 55 train sets @ $51 million each

Capital Investment Costs

• Phasing of Construction– Four phases over the 2015 to 2040

period

– Phases 1-3 (2015–2030): New York to Washington

– Phase 4 (2024–2040): New York to Boston

12The travel solution for our time

40% Increase in Acela Capacity

Acela II Fleet Doubles Capacity

160 mph Service South of NYC

NEC Gateway: Newark to NYC

Next Gen HSR MOS: NYC to PHL

Next Gen HSR South to Wash D.C.

Next Gen HSR North to Hartford

Next Gen HSR to Boston

NEC Stair-Steps to Next-Gen HSR Vision

Fa

st-Tra

ck

HS

R P

rog

ram

Fu

ll Ne

xt-Ge

n H

SR

Ne

two

rk

13The travel solution for our time

• Initial “Fast-Track” (2022)–“Gateway” Project from NJ into Moynihan Station

–Next-Gen HSR segment Newark to Frankford Junction

–Master Plan improvements Philadelphia to Washington, DC

“Fast-Track” Segment

14The travel solution for our time

Gateway Project

15The travel solution for our time

NEC Gateway: Penn Station & Network Expansion

16The travel solution for our time

NEC Stair-Step Approach

• Additional ACELA cars 40% capacity increase

• Purchase of ACELA II’s

17The travel solution for our time

Other NEC Approved Projects

• Maryland Bridge replacement

• Harold Interlocking – Amtrak bypass track

• Kingston, RI - passing track construction

• B&P Tunnel replacement

18The travel solution for our time

• Safer• Fast, safe and secure rail travel• Fewer highway accidents

• Greener• Reduces energy use, emissions• Supports dense, smart urban

development patterns• Strengthens existing commuter

and transit systems and riders

Healthier • Comfortable, convenient travel

supports affordable, livable & sustainable communities

• Minimize land area needed to meet future travel demand

HSR Advantages

19The travel solution for our time

• NEC HSR System Capacity– Up to 50 million annual

passengers

– Up to 8,000 passengers/hr. in each direction

– 2040 service plan = ~25% of capacity

• Highway Equivalent– 8,000 travelers/hr. = 5,300 cars

– Requires 3 highway lanes in each direction

• Difference– Speed

– Direct downtown-to-downtown connection

– Less energy and emissions

HSR Advantages

20The travel solution for our time

HSR Factors

• Market

• Competition

• Trip Time– Top speed vs Average speed

• Service Frequency

• Incremental vs Greenfield

• Funding

21The travel solution for our time

Amtrak HSR Factors

• Market – One of the most populated corridors in the World

• Competition – Airlines– Presently have 70% NY to DC and 55% NY to Bos

• Trip Time– Very sensitive – NY to DC 2hrs / NY to Bos 3hrs– High top speed necessary to meet trip time

• Frequency – Critical

• Incremental/Greenfield– Mixed

• Funding– Varies

22The travel solution for our time

How Does Speed Influence Cost

• Up to 110 mph– Wood ties– Cab signal systems/PTC– Grade crossing acceptable– Diesel acceptable

• 111 to 186 mph– Concrete ties– Catenary – No grade crossings– ROW fencing– No movable bridges -/fixed high level bridges

• 187 to 220+ mph– Slab Track?– Intrusion systems– Noise mitigation

* Higher the speeds the tighter maintenance tolerances leading to higher maintenance costs

HSR Funding

23The travel solution for our time

Thank You