Test Infrastructure and Accelerator Research Area
TIARA-FAMhttp://www.eu-tiara.eu Final Annual Meeting
R. AleksanNov. 25th, 2013
1. Meeting Objectives2. General Information3. Deliverables/milestones4. Conclusion
Thanks!
Heartily thanks to
Prof. Swapan Chattopadhyay Director CI
and
Prof. Peter McIntoshDeputy Director ASTeC
Prof. Susan SmithDirector ASTeC
and
for hosting TIARA
Meeting Objectives
Provide general information on TIARA Review and Finalize the Work
Deliverables, Achievements and Highlights Prepare the TIARA Final Report Exchange our views on how to strengthen further
accelerator R&D in Europe
Main objectives
Define the Strategy and Prepare the work for Implementing TIARA
1st day 2nd day 3rd day
Monday 25 Nov. Tuesday 26 Nov. Wed. 27 Nov.08:30
or 9:00
Plenary sessionHighlight talks
Plenary sessionGeneral interest talks
10:30 Break Break11:00
Plenary sessionHighlight talks
Plenary sessionWPs status
12:30Lunch Lunch
13:00 WP parallel sessions(only WP2, WP3, WP4)14:00
Plenary sessionHighlight talks
Plenary sessionWPs status
14:30 Break (14:30-15:00)15:00 Plenary session
Welcome and General Interest
Talks
Break (15:30-16:00) Adjourn (16:00)16:00 WP parallel sessions
end 18:15(only WP2,
WP3+WP4, WP5, WP7)
TGC meeting(16:15-19:30)16:30
TGC meeting
19:00 Adjourn (18:15) Adjourn19:30 Adjourn 19:30 Welcome coktail Social dinner TGC dinner
Lab Visit:Today at
16:30
FAM Agenda
Milestones
TIARA general activities
TIARA-Industry workshop : past June 17-19 in Uppsala
Other information
Result of consultation very positive as infrastructure for AS&T is identified by the EC as a priority item for IA (ranked A)
Estimated Work programme 2014-2015 Budget: ~580 M€
Finalization of the H2020 work programme 2014-2015, first call publication end 2013
Calls id. Type DeadlineINFRADEV-1-2014
andINFRADEV-4-2014/2015
Design Study
Cluster of infra. ESFRI+others
02/09/2014
INFRADEV-2-2015 and
INFRADEV-3-2015
Prep. Phase
Impl. ESFRI14/01/2015
Calls 2014 (M€)
2015 (M€)
Max. EC contr. (M€)
INFRADEV-1-2014 15 3INFRADEV-2-2015 14 5 (2)INFRADEV-3-2015 90 15INFRADEV-4-2014/2015 55 25 15
Horizon 2020: INFRADEV calls
Expected publication date 11 Dec. 2013
Developing new world-class research infrastructures
The 4 Technical WPs in good shape
WP6: SVET Very low emittance achieved at SLS <1pm (world record) Improved diagnostics being installed a even better ey
WP7: ICTF Nominal RF amplifier power reached (2MW) @Daresbury Being installed in ICTF hall @RAL for MICE operation New DiacrodeAmplifier developed and tested successfully at Los
Alamos (3 MW)
WP8: HGA 2 New C-Band structures successfully constructed Being installed for high power tests on SPARC @LNF
WP9: TIHPAC Design of Multi-MW test Irradiation Facility completed Design of the versatile SC Cavity test Cryostat close to completion
Work Status
b
Excellent Infrastructure showcase
Final WP Reports n
eed to be done
Organizational 4 WPs
WP3: Infrastructures Survey and RI database established Finalization of the list of Infrastructures being part of TIARA Needs vs resources comparison and upgrades/ construction of new RI
being finalized
WP4: R&D programme Key Accel. Research Area and Key Tech. Issues been identified Final plan of the collaborative R&D Programme being finalized
WP5: Education and Training E&T Survey and resource database established Survey of Needs for Accel. Scientists done Recommendations for promoting Accel. Science and Tech. in Europe
done
Work Status
bb
b
WP2: Governance Legal statutes of TIARA are being drafted
Excellent studies highlighting TIARA
potential to str
engthen Accel. R&D
Final WP Reports n
eed to be done
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 360
5
10
15
20
25
30
35
40
Scheduled Milestones vs months
Integral scheduled Milestonescumulative achieved
Month
Num
ber o
f Mile
ston
es
Milestones
2 Milestones missing
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 360
5
10
15
20
25
30
35
40
45Scheduled deliverables vs months
Integral scheduled deliv-erables
Integral achieved
Month
num
ber o
f del
iver
able
s
15 deliverables needed(out of which 9 are late)
Deliverables
I am trustful that a large majority will come by the end but a few need careful attention
Num Nat Short name Description Due month
Dissemination level
D8.1 O SPARC-C Construction of accelerating structures 29 PUD3.5 R RUC Report on potential Upgrades and/or Construction of New R&D
Infrastructures in Europe.30 PU
D6.4 R FINAL_R Final report 30 PUD2.6 O MoA-ITI Memorandum of Agreement on Initial TIARA Infrastructures 33 COD3.6 R JTI Joining the TIARA distributed accelerator R&D Infrastructure
and defining structures for sustaining and maintaining the Infrastructure data base.
33 PU
D4.3 R TTR “Toward TIARA”. Final plan of the collaborative R&D Program. 33 PUD5.4 R PAR Recommendations for Promoting Accelerator Science and
Technology in Europe Report33 PU
D7.2 R RFAmp1-Test Report on commissioning of the first RF amplifier system in the ICTF Hall.
33 PU
D9.2 R TDCC Technical Design Report on the SC Cavity test Cryostat 33 PUD2.7 R MoU-FIE MoU on Financial Model and Engineering 34 COD2.8 R MoU-LID MoU on Legal Issues and Documents 34 COD8.2 R SPARC-T Installation, commissioning and test report of the C-band Linac at
SPARC 35 PU
D1.7 R FTR Final Report 36 COD2.9 O F-MoA Final Memorandum of Agreement 36 COD7.3 R RFSysVI-Spec Report on the design and specification of ICTF RF power
distribution system for MICE Step VI (full ICTF implementation)36 PU
D7.4 R RF_Ampl-DR Design report of a 3 MW power amplifier 36 PUD9.1 R TDIF Technical Design Report of the Multi-MW test Irradiation Facility 36 PU
6
Deliverables
Documentation
60 documents so far in databaseNote : Acknowledgements of the EC have to be included in all TIARA documentsParticularly important for conference papers and publications
Any conference papers and/or publications foreseen?
reports notes conference papers
publicationsWP1 5 2 0 0 WP2 9 0 0 0 WP3 5 1 0 0 WP4 5 0 0 0 WP5 4 0 0 0 WP6 4 3 6 1 WP7 4 0 0 0 WP8 4 2 3 0 WP9 2 0 0 0
Communication, Dissemination and Outreach
Many successful activities on CD&O TIARA Website Databases (infrastructure, education and training) Newsletter (with growing subscribers) Brochure and “Accelerator for Society” website (increasing
consultations) Workshops with industry …
… and also advertising material
Important to use them to promote TIARA
FCC (TLEP/VHE-LHC)
Recommendations from European Strategy Group
Recommendation #2
High-priority large-scale scientific activities
d) To stay at the forefront of particle physics, Europe needs to be in a position to propose an ambitious post-LHC accelerator project at CERN by the time of the next Strategy update, when physics results from the LHC running at 14 TeV will be available.
CERN should undertake design studies for accelerator projects in a global context, with emphasis on proton-proton and electron-positron high-energy frontier machines. These design studies should be coupled to a vigorous accelerator R&D programme, including high-field magnets and high-gradient accelerating structures, in collaboration with national institutes, laboratories and universities worldwide.
Conclusions
Accelerator science; a powerful mean toward scientific, technical
and industrial breakthroughs…
TIARA will strengthen further
The objectives of TIARA are very ambitious and challenging
The last 2 months are vital as we have to come to a concrete proposal for implementation
Overall Work is progressing very well, but there is still a lot to do for this endeavor to be successful