Top Hat RainscreenTechnical Specification
February 2013 / New ZealaNd
2 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand
1 ApplicAtionAndscope 31.1 Application 31.2 Scope 31.3 Details 31.4 SpecificDesignandDetailing 2
2 design 32.1 Compliance 32.2 Responsibility 32.3 SiteandFoundation 42.4 Clearances 42.5 MoistureManagement 42.6 FramingandTopHatSections 42.7 WindPressure 42.8 FastenerSpacing 62.9 FireRatedWalls 6
3 substructureAndprepArAtion 6
3.1 Substructure 63.2 RABBoard 63.3 BuildingUnderlay 63.4 Flashing 6
4 eXotectopHAtAndpAnellAYout 7
4.1 General 74.2 PanelOrientationandLayout 7
5 FiXing 75.1 General 75.2 FastenerDurability 75.3 CountersunkFasteners 75.4 ExposedHeadFasteners 75.5 ExoTecTopHatFixing 8
Contents
6 Joints 86.1 PanelJoints 86.2 VerticalPanelJoints 86.3 HorizontalPanelJoints 86.4 JointinginVeryHighWindPressure 86.5 FlashingOverlaps 86.6 MovementJoints 86.6.1 VerticalStructuralJoints 86.6.2 HorizontalStructuralJoints 8
7 Junctions 97.1 SlabJunctions 97.2 Head 97.3 Base 97.4 SoffitJunction 97.5 Abutments 9
8 corners 9
9 WindoWs 9
10 SPECiALDETAiLS 910.1 CurvedFaçades 910.2 ParapetCapping 910.3 inspection 10
11 FinisHes 1011.1 General 1011.2 PanelsExposedtoDirectSunlight 10
12 storAgeAndHAndling 10
13 MAinTEnAnCE 10
14 PRODUCTinFORMATiOn 1114.1 ManufacturingandClassification 1114.2 ProductMass 1114.3 ExoTecFaçadePanel 1114.4 ExoTecTopHatSection 1114.5 RABBoard 1114.6 Durability 1114.7 ResistancetoMoisture/Rotting 1114.8 ResistancetoFire 1114.9 AlpineRegions 11
15 sAFeWorkingprActice 12
16 PRODUCTAnDACCESSORiES 13
17 DETAiLS 16
PRODUCTWARRAnTy 35
WeVAlueYourFeedbAckTocontinuewiththedevelopmentofourproductsandsystems,wevalueyourinput.Pleasesendanysuggestions,includingyourname,contactdetails,andrelevantsketchesto:
ask James Hardie™ Fax0800808988literaturefeedback@jameshardie.co.nz
2 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand 3
1.4 SpeciFic deSigN aNd detailiNgFortheuseofExoTecFaçadePanelandExoTecTopHatsoutsidethescopeofthistechnicalspecification,thedesigner,architectorengineermustundertaketherequiredspecificengineeringdesign.
Anyprojectspecificdetailnotincludedinthisliterature,mustbedevelopedbythedesignerandincludedontheprojectdrawings.
Foraguidanceonspecificengineeringdesigns,AskJamesHardieon0800808868.
2 Design2.1 compliaNceExoTecFaçadePanelinstalledoverExoTecTopHatsasperthistechnicalspecificationhasbeentestedinanATA(nationalAssociationofTestingAuthorities)accreditedlaboratoryandcomplieswithB1,B2andE2requirementsofthenewZealandBuildingCode(nZBC).AlldesignsoutsidethescopeofthisspecificationmustsatisfytherelevantclausesofthenZBCandotherrelevantstandardsandcurrentregulations.
2.2 reSpoNSibilityThespecifier/designeroranypartyresponsiblefortheprojectisresponsibleforensuringthattheinformationanddetailsincludedinthisspecificationaresuitablefortheintendedapplication.
ThespecifiershallaccommodatetheappropriateprovisionsrequiredbythenZBC.Carefuldetailingofallpenetrationsthroughtheairbarrierandrainscreenisrequiredandtheymustbeappropriatelyflashedandweatherproofed.Theothermaterialsandcomponentsthatareusedtomanagemoisturemustbeinstalledaspertheirmanufacturer’sinstructionsandcomplywiththerequirementsofrelevantStandardsandthenZBC.
Thedesigner/specifiermustensurethatallthereferencedocumentsandstandardsreferredtoduringthedesignandconstructionprocessarecurrent.Thedesignermustidentifythemoisturerelatedrisksassociatedwiththeparticularbuildingdesign.Thedesignandconstructionmusteffectivelymanagetheexternalmoisture.
ThewindowstobeusedwithExoTecFaçadePanelmustbespecificallydesignedconsideringthedesignwindpressuresanddeflectioninbuildingfaçade/structure.Refertothewindowmanufacturer/suppliersforinformationregardingtheirspecificationsandinstallationrequirements.Forthelatestinformationinrelationtodesigningforweathertightness,refertowww.branz.co.nzandwww.dbh.govt.nzwebsites.
JamesHardieconductsregularqualitycheckstoensurethatthemanufacturedproductsfallswithinourqualityspectrum.itistheresponsibilityofthebuilder/installertoensurethattheproductmeetstheiraestheticrequirementsbeforeinstallation.JamesHardiewillnotberesponsibleforrectifyingobviousaestheticsurfacevariationsfollowingtheinstallation.
1 Application and scope1.1 applicatioNJamesHardieExoTec®FaçadePanelfixedasperthistechnicalspecificationprovidesadurable,expressedjointpanelappearanceforbuildingfaçadesandfascias.Thisfixingmethodoffersversatilitytoarchitectsandbuilderswhichisdemonstratedbythevarietyofdesignstylesthatcanbeachievedincludingcurvedwalls,vertical/horizontalpanellayoutorbrickpatternlayout.Awiderangeofdecorativefinishescanbeused,fromsite-appliedacrylictextures,tofactory-appliedpolyurethaneplaincolourscanalsobeused.Metallicfinishesprovidedbysomespecialistapplicators.
If you are a specifierOrotherresponsiblepartyforaproject,ensurethattheinformationinthisdocumentisappropriatefortheapplicationyouareplanningandthatyouundertakespecificdesignanddetailingforareaswhichfalloutsidethescopeofthesespecifications.
If you are an installerEnsurethatyoufollowthedesign,moisturemanagementandassociateddetailsandmaterialselectionprovidedbythedesigner.Allthedetailsprovidedinthisdocumentmustbereadinconjunctionwiththisspecificationmanualandtheprojectspecification.
Make sure your information is up to dateWhenspecifyingorinstallingJamesHardieproducts,ensureyouhavethecurrentmanual.ifyouarenotsureyoudo,oryouneedmoreinformation,visitwww.jameshardie.co.nzorAskJamesHardieon0800808868.
1.2 ScopeThistechnicalspecificationcoverstheinstallationofExoTecFaçadePanelonExoTecTopHatsuptoawindpressureof5kPa(ULS).Thisspecificationisintendedforusebyarchitects,designers/specifiersandinstallerswhomaybeinvolvedwiththespecificationofExoTecFaçadePanel,ExoTecTopHatsandtheirinstallation.
ThisspecificationcoverstheuseofExoTecFaçadePanelandExoTecTopHatsforcommercialfaçadeapplicationovertimberorsteelframe,masonryandconcretewalls.TheExoTecFaçadePanelandExoTecTopHatscanalsobeusedtoprovideanexpressedjointpanelappearanceinbuildingsoffits.
AlltheinformationanddetailswithinJamesHardieExoTecTopHatRainscreentechnicalspecificationonlyappliestotheinstallationExoTecFaçadePanel.Thesepanelsmaybeusedincurvedfaçadeapplicationsdependingonthecurveradius,refertoClause10.1formoreinformation.
1.3 detailSVariousExoTecFaçadePaneldetailsareprovidedintheDetailssectionofthisdocument.ThesedetailsareavailableinCADformatandareavailabletodownloadfromourwebsiteatwww.jameshardie.co.nz.
Alldimensionsshownareinmillimetersunlessnotedotherwise.AllnewZealandstandardsreferencedinthismanualarecurrenteditionandmustbecompliedwith.
4 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand
2.3 Site aNd FouNdatioNThesiteonwhichthebuildingissituatedmustcomplywithE1-‘SurfaceWater’clauseofnZBC.ThegradeofadjacentfinishedgroundmustslopeawayfromthebuildingtoavoidanypossibilityofwateraccumulationinaccordancewithnZBCrequirements.Thefoundationslaborfootingsofthestructuremustbebasedon‘GoodGround’asdefinedintheapproveddocumentofnZBCB1‘Structure’.Thefoundationmustbedesignedbyaqualifiedstructuralengineerinaccordancetorelevantcodes,regulationsandstandards.
2.4 clearaNceSExoTecFaçadePanelmustalwayshaveaminimumclearanceof100mmfrompavedgroundand175mmfromunpavedground.Ontheroofsanddecksa50mmminimumclearancemustbeprovidedandthismustalwaysbemaintained.ExoTecFaçadePanelmustoverhangby50mmminimumbelowthebottomplates.
Donotinstallexternalcladdingsuchthatitmayremainincontactwithstandingwater.
2.5 moiSture maNagemeNtTheExoTecFaçadePanelinstalledoverExoTecTopHatsactsasarainscreen.Toachieveaparticularlevelofweathertightness,thedesignermustdeterminetheappropriatemoisturemanagingdetailsfortheproject.Thedesignershouldconsiderthefollowingmatterswhenmakingthisdecision:
• itistheresponsibilityofthebuildersanddesignerstoidentifymoisturerelatedrisksassociatedwithanyparticularbuildingdesign.itistheresponsibilityofabuildertoensurethatappropriatelevelofmoisturemanagementisachievedbyproperuseofflashings,sealantsandvapourpermeablemembranesetc.Beforeinstallingpanels,allwallopenings,penetrations,intersections,connections,windowsills,headsandjambsmustincorporateappropriateflashingsformoisturemanagement.Materials,componentsandtheinstallationpracticesrequiredtomanagemoisturemust,ataminimum,complywiththerequirementsofnZBC,relevantstandardsandthemanufacturer’sspecifications.
• ExpressedjointsinExoTecFaçadePanelmustbeprovidedasdetailedinthisliterature,seeClauses6.2and6.3.Forwindpressuresabove4.0kPa,bothverticalandhorizontaljointsmustbefilledwithasuitablepaintableflexiblesealant.RefertoClause6.4forsuitablejointsealant.Refertothesealantmanufacturerforsealantdurabilityinformation.
• Forwallshigherthan10m,ahorizontaldrainagejointmustbeprovided.RefertoFigure24.
• Theinstallationofverminproofing/basemouldatthebaseofacavitymustnotrestrictventilationordrainageofthecavity.RefertoFigure4.
ForinformationonRAB®BoardandbuildingunderlaysrefertoClause3.2and3.3ofthistechnicalspecification.
2.6 FramiNg aNd top Hat SectioNSExoTecTopHatsarefixedverticallyovertimber,steelgirtormasonrysubstrates.TheframingtosupporttheExoTecTopHatsectionsmustbeprovidedinaccordancewithspecificengineeringdesignrequirementsoftheprojectandmustbesuitabletofixExoTecTopHatsectionsoverit.ThespecificengineeringdesignmustbeinaccordancewithAS/nZS1170.Theflatnessofframingmustcomplywiththeexpectedaestheticrequirementsetfortheproject.StraighteningorpackingoutbetweenthesubstructureandExoTecTopHatsmustbelimitedto20mmmaximumandmustbedonebehindtheExoTecTopHatsections.ExoTecFaçadePanelsmustonlybefixedtoExoTecTopHatsandExoTecintermediateTopHatsandExoTecaccessoriesasshownindetails.RefertoFigure3.ExoTecTopHatandintermediateTopHatsectionsmustnotbeinstalledhorizontally.
ExoTecTopHatsarerequiredatpaneledgesandExoTecintermediateTopHatsinthemiddleofpanels.TheExoTecTopHatsfixedatpaneledgeshavetheflatsurfacesittingontheframingandtheExoTecintermediateTopHathastheflatsurfacefacingtowardstherearfaceofpanels.RefertoFigure5.
ThemaximumspansandnominalspacingforfixingExoTecTopHatsandExoTecintermediateTopHatsforwallandsoffitapplicationsareprovidedinTable1and2respectively.Forwallapplications,themaximumcantileverdistancetheExoTecTopHatcanspanuptois1/4ofthesinglespangiveninTable1.
2.7 wiNd preSSureitisaresponsibilityoftheprojectengineertodeterminetheappropriatewindpressuresfortheprojectandselectsuitablefixingoftheExoTecTopHatsandExoTecintermediateTopHatstothestructure.ThecalculatedwindpressureforafaçademustincludethelocalisedcoefficientsasdefinedinAS/nZS1170.Theengineermustlimitthedeflectionofthesupportingstructuretospan/250forserviceabilitywindload.
ExoTecFaçadePanelinstalledoverExoTecTopHatshasbeentestedtowithstandwindpressuresupto5kPa(ULS).
Table1and2specifythespansforExoTecFaçadePanelsandExoTecTopHatSectionsdependinguponthedesignwindpressures.
Table4specifiesthefixingspacingforinstallingExoTecFaçadePaneltoExoTecTopHatsections.
Table3specifiesthedesigncapacityrequiredforthefastenersthatshouldbeusedtofixExoTecTopHatsectionstotheframingsubstrates.
4 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand 5
Table1Walls—maximumExoTecTopHatandExoTecintermediateTopHatspans(mm)forultimatedesignwindpressures
Span Type Nominal Top Hat Spacing
Design Wind Pressure (kPa)
(mm) 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0
SingleSpan400
600
1750
1530
1530
1330
1390
1210
1290
1120
1210
1060
1150
1010
1100
960
1060
930
1020
890
2SpanContinuous
400
600
2340
2050
2050
1790
1860
1620
1720
1400
1620
1250
1470
1140
1350
1030
1260
960
1160
880
3SpanContinuous
400
600
2160
1890
1890
1650
1710
1500
1590
1390
1500
1250
1420
1140
1350
1030
1260
960
1160
880
Table2Soffits—maximumExoTecTopHatandExoTecintermediateTopHatspans(mm)forultimatedesignwindpressures
Span Type Nominal Top Hat Spacing
Design Wind Pressure (kPa)
(mm) 1.0 1.5 2.0 2.5 3.0 3.5 4.0 5.0
SingleSpan400
600
1660
1450
1470
1290
1350
1180
1260
1100
1190
1040
1130
990
1080
950
1010
880
2SpanContinuous
400
600
2220
1950
1970
1730
1810
1530
1690
1100
1550
1200
1410
1090
1300
1000
1130
860
3SpanContinuous
400
600
2050
1800
1820
1590
1670
1460
1560
1340
1470
1200
1400
1090
1300
1000
1130
860
Table3FastenerselectiontofixExoTecTopHatsectionintoframing
Span Type Nominal Top Hat Spacing
Design Wind Pressure (kPa)
(mm) 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0
SingleSpan400
600
Type1
Type1
Type1
Type1
Type1
Type1
Type1
Type2
Type1
Type2
Type1
Type2
Type1
Type2
Type2
Type2
Type2
Type2
2SpanContinuous
400
600
Type2
Type2
Type2
Type3
Type3
Type3
Type3
Type4
Type3
Type4
Type3
Type4
Type3
Type4
Type4
Type4
Type4
Type4
3SpanContinuous
400
600
Type2
Type2
Type2
Type2
Type2
Type3
Type2
Type3
Type3
Type4
Type3
Type4
Type3
Type4
Type3
Type4
Type3
Type4
note:n Type1fastenertohaveadesigncapacityupto1kn.Type2fastenertohaveadesigncapacityupto2kn.Type3fastenertohaveadesigncapacity
upto3kn.Type4fastenertohaveadesigncapacityupto4.2kn.
n FastenerspacingtofixTopHatsectionisasperTable1and2.
6 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand
Table4Fastenerspacingsforwallandsoffitapplications
Design Wind Pressure(Ultimate)
(kPa)
Nominal Top Hat Spacing
(mm)
Max Fasteners Spacing at Sheet Edges(mm)
Max Fasteners Spacing at Intermediate Top Hats(mm)
1.0-1.5600 600 600
400 600 600
1.5-2.5600 400 400
400 600 600
2.5-3.0 400 450 450
3.0-3.5 400 400 400
3.5-5.0 400 300 300
notestoTables1,2,3and4:
1.ExoTecTopHatspansmayberestrictedtoframingspansrequiredtofixRABBoard,whenfixingExoTecTopHatsectionsintothesameframingasusedtofixRABBoard.
2.ExoTecTopHatdeflectionforserviceabilitylimitstatedesigntoAS/nZS1170.2islimitedtospan/250.
3.DesignWindPressurestobeinaccordancewithAS/nZS1170.2forultimatestrengthdesign.
4.Forpermissibledesignwindpressure,dividetheultimatestrengthdesignwindpressuresby1.5.
2.8 FaSteNer SpaciNgTable4indicatesthemaximumfastenerspacingtofixExoTecFaçadePanelsintoExoTecTopHatsectionsforwallandsoffitapplications.
2.9 Fire rated wallSFireratedwallcanbeconstructedwhenusingrigidairbarriers.AfireratingcanbeachievedwhenusingRABBoardasrigidairbarrierupto60minutes.Theotherfireratedsystemrequirementsmustbeincludedinthewallconstructiontoachievetherequiredfireratings.Formoreinformation,refertoJamesHardieFireandAcousticDesignManualavailableatwww.jameshardie.co.nzorAskJamesHardieon0800808868foracopy.
3 Substructure and preparation
3.1 SubStructureTheExoTecTopHatandExoTecintermediateTopHatsectionsareinstalledverticallyoversteelgirtsornogs.Whenusingtimberframing,thenoggingsbetweenstudscanbeusedtosupportExoTecTopHatandExoTecintermediateTopHatsections.TheframingtowhichtheExoTecTopHatsectionsarefixedmustbestructurallyadequatetoresistthefaçadeloading.Thetimberframingusedmustbetreatedandhavethemoisturecontentwithinthe20%limitasspecifiedinnZS3602.
Aqualifiedpersonmustdesignthesubstructuretosuitthedesignwindpressuresandloadingtransferredfromthefaçadetothesubstructure.
3.2 rab boardRABBoardisinstalledoverthemainframingtoactasarigidairbarriertowithstandhighwindpressuresandtomanagemoistureinthecavity.RABBoardinstalledasarigidairbarrierhasbeentestedtowithstandwindpressuresspecifiedinTable1.
RABBoardmustbeusedwithExoTecFaçadePanelTopHatRainscreenwheretheprojectsareexposedtowindpressureshigherthan1.5kPa(ULS).TheRABBoardmustbefixedusing40x2.8mmHardieFlex™nailsat200mmc/ctotheentiretimberframing.
RefertotheJamesHardieRigidAirBarriersinstallationManualorAskJamesHardieon0800808868forfurtherinformationaboutfixingRABBoard.
note:TheframingrequirementforfixingtheRABBoardmayrestricttheExoTecTopHatspangiveninTable1whenfixingExoTecTopHatsectionsintothesameframing.
3.3 buildiNg uNderlayBuildingunderlayissuitabletowithstandalimitedwindpressureandisgenerallyuseduptoawindpressureof1.5kPa(ULS).Abuildingunderlaymaynotperformasdesiredwhenexposedtohigherwindpressuresforprolongeddurations.Thereforewhendealingwithprojectsexposedtowindpressureshigherthan1.5kPa,aRABBoardmustbeused.
Whenconsideringtheuseofabuildingunderlayforaspecificdesignproject,checkwiththebuildingunderlaymanufacturertoconfirmitssuitabilityfortheproposedproject.ThebuildingunderlayisinstalledbetweentheExoTecTopHatsandthesupportingstructure.RefertoFigure5.Buildingunderlaymustbelappedwhenrequiredsoastodrainmoisturetowardstheexteriorofabuilding.
ThebuildingunderlaymustbeinstalledinaccordancewiththeAS/nZS4200.2‘PliableBuildingMembranesandUnderlays–installation’andthemanufacturer’sspecifications.
BuildingunderlaymustcomplywithTable23ofClauseE2ofnZBC.
3.4 FlaSHiNgAllwallopenings,penetrations,intersections,connections,windowsills,headsandjambsmustbeflashedpriortoExoTecTopHatandExoTecFaçadePanelinstallation.RefertoClause2.5formoisturemanagementrequirements.
6 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand 7
ThebuildingunderlayorRABBoardmustbeappropriatelytapedaroundthepenetrationsandlapped/tapedtoflashings.Materialsmustbelappedinsuchawaythatwatertracksdowntotheexteriorofthebuilding.JamesHardiewillassumenoresponsibilityforwaterinfiltrationwithinthewallduetopoorinstallationofflashingsorbuildingunderlay.TheselectedflashingmaterialmustcomplywiththedurabilityrequirementsofnZBC.ForinformationrefertoTable20ofE2ofnZBC.
WhenusingRABBoardtheentiretimberframingaroundtheopeningmustbesealedwithaflashingtape.ThetapemustbelappedoverthefaceofRABBoard.TheflashingtapeslikeProtectotapebyProtectoWrap®orAlubandbyThermakraft®arerecommendedforusewithRABBoard.Refertotapemanufacturer’sliteratureforfurtherinformationregardingtheirinstallation.
4 ExoTec Top Hat and panel layout
4.1 geNeralTheExoTecFaçadePanellayoutmustbeconsideredinconjunctionwiththeExoTecTopHatspacingandsubstructureframingsetout.ExoTecTopHatspacingmustbesuitableforjointingthepanelsandthedesignwindpressures.RefertoFigure3.Whereconstructionjointsoccurinthestructure,thesemustbecarriedthroughExoTecTopHatsandpanels.RefertoFigure25.
4.2 paNel orieNtatioN aNd layoutExoTecFaçadePanelmustbeinstalledwithdistinctivewhitesidefacingtheexteriorofstructurewhereastheclearsealedsideisfacingtowardsthecavity.RefertoClause11.2forspecificrequirements.
Panelsaregenerallyinstalledwitha10mmnominalexpressedverticaljointbetweenadjacentpanels,i.e.for1190mmwidepanelsanda10mmwidejoint,thegriddimensionis1200mmc/c.RefertoFigure3.Verticaljointsupto20mmwidecanbeformedwithadditionalcarerequiredduringinstallationtoensurethepaneledgescovertherubberfixedonbothsidesofExoTecGasketSnapStrip.Averticaljointupto6mmminimumwidthcanalsobeformedwithcare.
Thehorizontalandverticalexpressedjointsbetweendifferentpanelsmayeitherbealignedoroffsettoformabricklayoutpattern.
notes:
• Wherefeasibleusestockpanelsizestominimisesitecuttingandwastage.SeeSection16forpanelsizes.
• AllsitecutpaneledgesmustbesealedwithDulux®Acraprime501/1orasimilarsealer.
5 Fixing
5.1 geNeralExoTecFaçadePanelisfixedtoExoTecTopHatsectionsusingthefollowingfixings;
1.Countersunkscrewsfixed2mmbelowthepanelsurfaceandflushfinishedusingtwopartepoxyfillerandsandedsmooth.Thepanelsarefinishedusingasite-appliedacryliccoating.RefertoClause5.3.
2.Exposedheadscrews,e.g.pan,waferheadhexscrewalongwithExoTecFaçadewasher.Exposedheadfastenerscanalsobecolourcoatedtomatchthepre-paintedpanels.RefertoClause5.4
5.2 FaSteNer durabilityFastenersmusthavetheappropriatelevelofdurabilityrequiredfortheintendedproject.Thisisofparticularimportanceincoastalareas,subjecttosaltsprayandothercorrosiveenvironments.
Fastenersmustbefullycompatiblewithallothermaterialsthattheyaretobeincontactwithtoensurethedurabilityandintegrityoftheassembly.
innon-coastalareasaClass3coatedscrewandincoastalareaaClass4coatedscrewmustbeused.Contactfastenermanufacturersformoreinformation.
SeeTable4andFigure3formaximumfastenerspacingrequiredforfixingpanelstoExoTecTopHats.
5.3 couNterSuNk FaSteNerSFastener type:10gx30mmcountersunkheadmetalscrewwithrequiredClass3orClass4coating.Thecountersunkscrewholesareflushfinishedwithatwopartepoxyfillerwhichissandedtoasmoothfinish.
note:Panelsmustbepre-drilledusinga9mmTungstenCarbideDrillBitsuppliedbyJamesHardie.Screwheadmustbecountersunktoamaximumdepthof2mmbelowthepanelsurface.RefertoFigure6.
Flush Sealing Screw Holes:• Useonlyproventwopartepoxiesforsealingholesafterfixing
thescrews.HiltiCA273,nuplexFairingCreamorasimilarepoxyshouldbeused.
• Mixcorrectratioandamountofepoxyforimmediateuseasperthemanufacturer’sinstructions.
• Blowdustoutofholestoachieveadhesionofepoxy.
• Coverthecountersunkfastenerswithtwopartepoxy,finishitflushwiththepanelsurfaceandsandittoarequiredleveloffinish.
5.4 expoSed Head FaSteNerSFastener types:10gx25mmpan,waferorhexheadmetalscrewwithrequiredClass3orClass4coating.RefertoFigure9.
ExoTecFaçadeWashersmustbeinsertedinthepredrillscrewholesbeforefixingthescrews.
note:Panelsmustbepre-drilledwitha6mmmasonrytitaniumdrillbit,whichprovidesa6.2to6.3mmdiameterholebeforefixing.
8 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand
5.5 exotec top Hat FixiNgForfixingtheExoTecTopHatsectionintotheframingsubstrate,thedesignermustspecifythetypeoffastenertobeusedtowithstandthedesignwindpressures.RefertoTable3foraguidancetocheckthedesigncapacityofthefastenerrequired.
Themaximumfixingc/cdistancewillbeaspertheExoTecTopHatspansprovidedinTable1and2asthesectionscanonlybefixedatsupportpoints.
6 Joints6.1 paNel JoiNtSExoTecFaçadePanelsaregenerallyinstalledwithanominal10mmwideexpressedjointbetweenadjacentpanels,verticallyandhorizontally.
6.2 Vertical paNel JoiNtSAtverticalpaneljoints,priortofixingpanels,theExoTecGasketSnapStripisfittedintoExoTecTopHatsbystartingononesideofthetophatsectionandpushingitintotheothersidealongitslength.ThesnaponstripsarebuttedtogethertoformajointinExoTecTopHatsectionwithoutanysealant.
TheExoTecGasketSnapStripisahi-tensileroll-formedsteelsectionwithrubbergasketsfittedinitonbothsides.itgetscompressedunderthepaneledgesandprovidesaprimaryweathertightnessattheverticaljoint.SeeFigure7.
Averticaljointupto20mminwidthcanbeformed.itmustbeensuredthatthepaneledgescovertherubbergasketfittedoneithersideofExoTecGasketSnapStrip.Theverticaljointscanbestaggeredtoachieveabricklayoutpattern.SeeFigures1and2.
note:TheverticaljointmustalwaysbeformedovertheExoTecTopHatsection.
6.3 HoriZoNtal paNel JoiNtSHorizontaljointsareformedusingAluminium‘T’socketora‘Z’flashing.TheAluminium‘T’Socketisbondedtothereartopedgeofpanelsusingapolyurethaneadhesivesealante.g.Seal‘n’Flex-1byBostik,Sikaflex11FCbySikaorsimilar.TheloweredgeofupperpanelabovethejointisalsosealedandlapsovertheupstandofAluminium‘T’Socket.RefertoFigure19and20.The‘T’Socketisa1.2mmthickaluminiumextrudedsection.
ThefixingsalongthehorizontalpaneledgesmustnotpenetratethroughtheAluminium‘T’Socket.
Aluminium‘T’SocketmustbesealedtotheExoTecTopHatsectionattheirintersectionpointasshowninFigures20and21tostopmoisturepenetrationbehindthe‘T’Socket.
Whereaverticalpaneljointterminatesoverthehorizontaljoint,the‘T’SocketisalsosealedtothefaceofExoTecGasketSnapStrip.RefertoFigures22and23.
6.4 JoiNtiNg iN Very HigH wiNd preSSure Fordesignwindpressuresincludingandabove4.0kPa,horizontalandverticaljointsmustbecontinuouslysealedwithasuitableflexibleandpaintablejointsealante.g.FosrocSilaFlexMS,Seal‘n’Flex-1orsimilar.RefertoFigure8.
note:Whenusingahorizontal‘Z’flashing,thehorizontaljointsmustnotbesealed.Sealthebuttjoint.
Refertosealantmanufacturersinstructionsforapplicationandpainting.
6.5 FlaSHiNg oVerlapSWhenusing‘Z’flashingsathorizontaljointsorcapflashingsontopofwallsetc.RefertoTable5fortheminimumlaprequiredoverthecladding.RefertoFigure22.
Table5Minimumflashingoverlaps
MaximumDesignWindPressure(kPaULS)upto
1.5 2.5 5.0
MinimumFlashingCover(mm) 35 50 75
6.6 moVemeNt JoiNtSMovementjointsarerequiredtolimitorremovestressestransferredtopanelsduetothemovement/deflectionsexperiencedinframing.
6.6.1 Vertical Structural JoiNtSWhereverticalstructuraljointsareprovidedinabuildingtoaccommodateforstructuralmovement,theverticaljointsinExoTecFaçadePanelmustcoincidewiththesestructuralverticaljoints.TheverticalstructuraljointisconstructedasshowninFigure25.Theprojectengineerisresponsibleforspecifyingthelocationsofverticalstructuraljoints
Forpanelabuttingintomasonry/concretewallseeFigures26and27.
6.6.2 HoriZoNtal Structural JoiNtS Horizontalstructuraljointsarerequiredatfloor/slablevelwheretheframingsupportingtheExoTecTopHatcanmoveduetocreep/deflectionintheslab.RefertoFigure24forasuitabledetailforhorizontaldeflection.SeeTable5fortheflashingoverlapsrequired.
note:Theprojectengineerisresponsibleforspecifyingtheamountofanticipatedmovement/deflection.
8 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand 9
7 Junctions
7.1 Slab JuNctioNSWhenjointingtwodifferentbuildingmaterialsthedifferentexpansionandcontractionratesofthematerialsmustbeconsidered.
7.2 HeadWhereExoTecFaçadePanelbuttsintoanexposedslab,thedetailmustallowforsufficientcreep/deflectionexpectedintheslab.RefertoClause6.6.2forcreep/deflectionwhereExoTecTopHatcrossesinfrontoftheslab.
RefertoFigure27fortypicaldetail,whichcancaterforthisdeflection.
7.3 baSeExoTecBaseMouldisfittedattherainscreencavitybasetoallowformoisturedrainageandventilationrequiredforthecavity.inasoffitapplicationthebasemouldmustlapundertheRABBoard/buildingunderlayorthebasemouldupstandmustbetapedtotheRABBoard/buildingunderlaytotransferthemoisturetotheexterior.RefertoFigure18.
note:itisessentialthatacontinuousbasemouldflashingisprovidedbehindtheExoTecFaçadePanelatthebaseofthefaçadetoallowfordrainage/ventilationandtoformverminproofing.
7.4 SoFFit JuNctioNTherearemanywaysofdetailingthesoffitjunctionanditisimportanttoensurethat15mmminimumdripedgeisformed.
AtypicalmethodtoinstallasoffitfasciajunctionisshowninFigure18.EnsuretheExoTecBaseMouldisfittedatthebottomoffaçadecavity.
7.5 abutmeNtSTherearedifferentmethodsoffinishingpanelsagainstanothercladdingsystem.AtypicaldetailisshowninFigure26.
8 CornersAnexternal/internalcornerisconstructedusingExoTecTopHatCornerFlashinginthecornerfittedoverExoTecintermediateTopHatsectionononesideandtoExoTecFaçadePanelontheotherside.RefertoFigures11,12and13.
Whenacornerwithasmallradiusisrequired,itcanbemadeusingapurposemademetalflashingoraGlassReinforcementCement(GRC)tosuitthesiterequirementsandissuppliedbyothermanufacturers.
note:TheExoTecintermediateTopHatsectionbehindthecornerflashingcanbeomittedwhensuitableframingisnotavailableinthecornertofixTopHatsection.
9 Windows
TheExoTecFaçadePanelTopHatRainscreensystemprovidesanopportunitytoconsiderawiderangeofalternativewindowopeningtreatments.Thespecifier/designer,inconjunctionwiththewindowmanufacturer,mustconsidertoachieveaneffectiveweatherproofingofthewindow/dooropenings.Also,refertomoisturemanagementrequirementsinClause2.5forfurtherinformation.
ThetypicalgenericwindowdetailsareshowninFigures14,15,16and17.
10 Special details
10.1 curVed FaçadeSWherethecurveradiusis10morgreater,ExoTecFaçadePanelcanbebenttosuitthecurveoftheframing.RefertoTable6formaximumExoTecTopHatspacing.
Table6MaximumExoTecTopHatspacingforcurvedapplications
Radii(m)
Max ExoTec Top Hat Spacing(mm)
10to15 400
>15 600max.ortosuitwindpressuresasperTable1
notes:
1.ExoTecFaçadePanelmustbefixedhorizontallytotheExoTecTopHatsections.
2.ThecloserthespacingofExoTecTopHats,thelesslikelytheywillreadthroughthepanels,particularlyatsmallradii.
3.incurvedapplications,alwayscommencefixingofpanelsfromthecentreandworkoutwardstoavoid“drumminess”.
10.2 parapet cappiNgThedesignofthemetalparapetcappingshouldaimtoprovideweathertightnessandminimisethestainingofcladding.Followthefollowingrecommendations;
1.TheflashingmustoverlapthecladdingbyaminimumdistanceasspecifiedinTable5.
2.Ensuretheparapetcappinghasaslopetowardstheroof.
3.Provideadripedgeawayfromthecladdingface.
4.inaddition,cappingsmustbelappedatajunctionaspertheTable7belowandalljointsincappingshouldbesealed.RefertoTable7fortherequiredjointoverlap,
10 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand
Table7Parapetcappingjointoverlap
Max.DesignWindPressureUpto(kPaULS)
2.0 3.5 5.0
Min.CappingOverlap(mm) 50 100 150
note:Forpermissibledesignwindpressure,divideULSwindpressureby1.5.
10.3 iNSpectioNAftertheinstallationofExoTecFaçadePanelsandbeforethepainting,thefaçade/fasciashouldbeinspectedtoensure:
1.Requirednumberandlocationoffixingsarecorrect.
2.Sealantisappliedwherespecified.
3.Theepoxyfillersisfilledinthescrewholesandsandedsmoothtofinishflushwithpanelsurface.
4.Minordamagetopaneledgescanbefilledwithepoxy,sandedsmoothandpainted,seeSection11.
11 Finishes11.1 geNeralToensurethedurabilityofExoTecFaçadePanelsasperClause14.5isachieved,thepanelsmustbepaintedwithin90daysofinstallation.
ExoTecFaçadePanelswillreadilyacceptawidevarietyofappliedfinishes,includingsiteappliedcoatingsandthefactoryappliedspecialfinishes.
Forsite-appliedfinishes(acryliccoatings),followthepaintmanufacturer’srecommendations.itisrecommendedthatthepaintswithaminimumdft150micronbeused.
Allsitecutedgesorsandedpatchesonpanelsurfacemustbeprimedaftercuttingorsanding.Thefaceandedgesofthepanelsmustbecoatedinaccordancewiththepaintmanufacturer’srecommendations.AlsorefertoClause5.3.
Forfurtherinformation,contactthecustomerservicecentreoftherelevantpaintcompany.
Polyurethanepaintsarenotsuitableasasite-appliedfinishbutcanbefactorycoatedpriortoinstallation.Pre-finishedpanelsaregenerallyinstalledusingexposedheadfastenerscoatedinthesamecolour.
11.2 paNelS expoSed to direct SuNligHt Thefrontprimedorrearsealedfaceofthepanelsmustnotbeexposedtodirectsunlightforanyperiodgreaterthan90days.Thefacemustbeover-coatedwithasuitableprimerasrecommendedbythepaintmanufacturerwhenexposedtodurationsmorethan90days.However,iftherearclearsealeristobeexposedtodirectsunlightbyitsapplication,e.g.useinfascias,plantrooms,etc.thentheclearsealermustbecoatedwithaminimumofonecoatofanexteriorgradeacrylic,pigmentedwhite.
12 Storage and handling
Allmaterialsshouldbestoredtoavoiddamage,withedgesandcornersofthepanelsprotectedfromchipping.
ExoTecFaçadePanelsmustbeprotectedfromrainduringtransportandstorage.ThepanelsandExoTecTopHatsectionsmustbelaidflatundercoveronasmoothlevelsurfaceclearofthegroundtoavoidexposuretowaterormoistureetc.ExoTecFaçadePanelsandExoTecTopHatsectionsareresistanttopermanentwaterdamagewheninstalledasdirected.Thepanelsmustonlybeinstalledinadrystate.
WhenhandlingExoTecFaçadePanels,carrypanelsontheedgetakingcarenottochipedgesandcorners.
RefertotheClause15forrecommendedSafeWorkingPractices.
ExoTecTopHatsectionsandothermetalaccessoriesmustbehandledwithutmostcareduringtransportationandatsitestoavoidanypersonalinjuriesandtoachievethebestpossiblepanelflatness.
ExoTecTopHatsectionsandmetalaccessoriesmustbehandledwhilewearinggloves.
13 Maintenanceitistheresponsibilityofthespecifiertodeterminenormalmaintenancerequirementstomaintaintheeffectivenessofthecladding.Theextentandnatureofmaintenancerequiredwilldependonthegeographicallocationandexposureofthebuilding.
Asaguide,itisrecommendedthatthebasicnormalmaintenancetasksshallinclude,butnotbelimitedto:
• Washingdownexteriorsurfacesevery6-12months*.
• Re-coatingexteriorprotectivefinishes**.
• RegularinspectionandrepairifnecessaryofExoTecFaçadePanels,sealantsetc.
• Cleaningoutgutters,downpipesandoverflowpipesasrequired.
• PruningbackvegetationwhichisclosetoortouchingthebuildingaswellasensuringthenZBCgroundclearancerequirementsaremaintainedespeciallywheregardensareconcerned.
• TheclearancebetweenthebottomedgeofExoTecFaçadePanelandthefinished/unfinishedgroundmustalwaysbemaintained.
• Refillingthecountersunkholeswherethecracksstartappearingin the paint film around epoxy fillers or where fastener readthroughbecomessignificant.
*Donotuseawaterblastertowashdownthecladding.
**Refertothepaintmanufacturerforwashingdownandrecoatingrequirementsrelatedtoongoingpaintperformance.
10 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand 11
14 Product information
14.1 maNuFacturiNg aNd claSSiFicatioNExoTecFaçadePanelsarehighqualitycompressed,autoclaved,cementbasedbuildingpanelsmanufacturedbyJamesHardie.RABBoardisamediumdensityautoclavedcellulosefibrereinforcedcementbasedbuildingproduct.
ThebasiccompositionoftheseproductsisPortlandcement,sand,cellulosefibreandwater.Theseproductsareidentifiedbythenameprintedatregularintervalsonthebackface.
JamesHardiebuildingproductsaremanufacturedtoAustralian/newZealandStandardAS/nZS2908.2‘Cellulose-CementProducts’(iSO8336‘Fibre-CementFlatSheet’).JamesHardienewZealandisaniSO9001‘Telarc’certifiedmanufacturer.
ExoTecFaçadePanelisclassifiedTypeA,Category3inaccordancewithAS/nZS2908.2(iSO8336).
14.2 product maSSThenominaldensityofExoTecFaçadePanelis1552kg/m3atEMC.
ThenominaldensityofRABBoardis1300kg/m3.Forpanelsizes,seeClause14.3and14.4Section16.
14.3 exotec Façade paNel ExoTecFaçadePanelismanufacturedtohavethenominalsizesasoutlinedinTable8below.
Table8ExoTecFaçadePanelproperties
Properties Equilibrium Condition
Width 1190mm
Length 2400mmor3000mm
Approx.Mass 17kg/m2
14.4 exotec top Hat SectioNExoTecTopHatsectionsaremanufacturedofsteelgrade'G300'andiscoatedwithA2150coating.Thesectionsare1.15mmthick.
14.5 rab boardRABBoardismanufacturedtohavethepropertiesandsizesasoutlinedinTable9below.
Table9RABBoardproperties
Properties EMC Condition
Width 1200mm
Length 2400,3000mm
App.Mass 8.5kg/m2
14.6 durabilityExoTecFaçadePanelsandRABBoard,wheninstalledandmaintainedasperthistechnicalspecification,willmeetthedurabilityrequirementsof‘Durability’ClauseB2ofnZBC.
14.7 reSiStaNce to moiSture/rottiNg ExoTecFaçadePanelhasdemonstratedresistancetopermanentmoistureinduceddeterioration(rotting)andhaspassedthefollowingtestsinaccordancewithAS/nZS2908.2
• WaterPermeability(Clause8.2.2)
• WarmWater(Clause8.2.4)
• HeatRain(Clause6.5)
• SoakDry(Clause8.2.5)
14.8 reSiStaNce to FireExoTecFaçadePanelisdeemedtobeanon-combustiblematerialinaccordancewithAS1530Part1.ThepanelhasbeentestedbyCSiROandhasthefollowingEarlyFireHazardindices(testedtoAS1530Part3).
Earlyfirehazardindicies
Flammability(Fi) 0
SpreadofFlameindex(SFD) 0
HeatEvolvedindex 0
SmokeDevelopedindex(SDi) 0–1
14.9 alpiNe regioNSinregionssubjecttofreeze/thawconditions,ExoTecFaçadePanelmustnotbeindirectcontactwithsnowand/oricebuildup,e.g.externalwallsinalpineregionssubjecttosnowdriftsoverwinter.
ExoTecFaçadePanelandRABBoardhavebeentestedforresistancetofrostinaccordancewithAS/nZS2908.2Clause8.2.3.
12 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand
warNiNg — do Not breatHe duSt aNd cut oNly iN well VeNtilated areaJamesHardieproductscontainsand,asourceofrespirablecrystallinesilicawhichisconsideredbysomeinternationalauthoritiestobeacauseofcancerfromsomeoccupationalsources.Breathingexcessiveamountsofrespirablesilicadustcanalsocauseadisablingandpotentiallyfatallungdiseasecalledsilicosis,andhasbeenlinkedwithotherdiseases.Somestudiessuggestsmokingmayincreasetheserisks.Duringinstallationorhandling:(1)workinoutdoorareaswithampleventilation;(2)minimisedustwhencuttingbyusingeither‘ScoreandSnap’knife,fibrecementshearsor,wherenotfeasible,useaHardieBlade™SawBladeanddust-reducingcircularsawattachedtoaHEPAvacuum;(3)warnothersintheimmediateareatoavoidbreathingdust;(4)wearaproperly-fitted,approveddustmaskorrespirator(e.g.P1orP2)inaccordancewithapplicablegovernmentregulationsandmanufacturerinstructionstofurtherlimitrespirablesilicaexposures.Duringclean-up,useHEPAvacuumsorwetcleanupmethods—neverdrysweep.Forfurtherinformation,refertoourinstallationinstructionsandSafetyDataSheetsavailableatwww.jameshardie.co.nz
Failure to adHere to our warNiNgS, SaFety data SHeetS, aNd iNStallatioN iNStructioNS may lead to SeriouS perSoNal iNJury or deatH.
15 Safe working practice
JamesHardierecommendedsafeworkingpractices
Cutting Outdoors
1.Positioncuttingstationsothatwindwillblowdustawayfromuserorothersinworkingarea.
2.UseadustreducingcircularsawequippedwithHardieBlade™SawBladeandHEPAvacuumextraction
Sanding/Drilling/Other Machining
Whensanding,drillingormachiningyoushouldalwayswearaP1orP2dustmaskandwarnothersintheimmediatearea.
Important Notes:
1.nEVERuseapowersawindoors2.nEVERuseacircularsawbladethatdoesnotcarrythe
HardieBlade™logo3.nEVERdrysweep–UsewetsuppressionorHEPA
Vacuum4.nEVERusegrinders5.ALWAySfollowtoolmanufacturer’ssafety
recommendations
P1orP2respiratorscanbeusedinconjunctionwithabovecuttingpracticestofurtherreducedustexposures.Additionalexposureinformationisavailableatwww.jameshardie.co.nztohelpyoudeterminethemostappropriatecuttingmethodforyourjobrequirements.ifconcernstillexistsaboutexposurelevelsoryoudonotcomplywiththeabovepractices,youshouldalwaysconsultaqualifiedindustrialhygienistorcontactJamesHardieforfurtherinformation.
15.1.1 workiNg iNStructioNSRefertorecommendedSafeWorkingPracticesbeforestartinganycuttingormachiningofproduct.
15.1.2 Hardieblade™ Saw blade
TheHardieBlade™SawBladeusedwithadust-reducingsawfittedwithHEPAvacuumfilterisidealforfast,cleancuttingofJamesHardiefibrecementproducts.Adust-reducingsawusesadustdeflectororadustcollectorconnectedtoavacuumsystem.Whensawing,clampastraight-edgetothesheetasaguideandrunthesawbaseplatealongthestraightedgewhenmakingthecut.
15.1.3 Hole-FormiNgFor smooth clean cut circular holes:Markthecentreoftheholeonthepanel.Pre-drilla‘pilot’hole.
Usingthepilotholeasaguide,cuttheholetotheappropriatediameterwithaholesawfittedtoaheavydutyelectricdrill.
For irregular holes:Smallrectangularorcircularholescanbecutbydrillingaseriesofsmallholesaroundtheperimeteroftheholethentappingoutthewastepiecefromthesheetface.Tapcarefullytoavoiddamagetopanel,ensuringthatthepaneledgesareproperlysupported.
15.1.4 HaNdliNg aNd StorageAllmaterialsshouldbestoredtoavoiddamage,withedgesandcornersofthepanelsprotectedfromchipping.
ExoTecFaçadePanelsandExoTecTopHatsectionsmustbeprotectedfromrainduringtransportandstorage.Theymustbelaidflatundercoveronasmoothlevelsurfaceclearofthegroundtoavoidexposuretowaterormoistureetc.ExoTecFaçadePanelandRABBoardareresistanttopermanentwaterdamagewheninstalledasdirected,andmustonlybeinstalledinadrystate.WhenhandlingExoTecFaçadePanelandRABBoard,carrypanelsontheedgetakingcarenottochipedgesandcorners.
15.1.5 QualityJamesHardieconductsstringentqualitycheckstoensurethatanyproductmanufacturedfallswithinourqualityspectrum.itistheresponsibilityofthebuildertoensurethattheproductmeetsaestheticrequirementsbeforeinstallation.JamesHardiewillnotberesponsibleforrectifyingobviousaestheticsurfacevariationsfollowinginstallation.
12 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand 13
ExoTecFaçadePanelinformation
Product Description Size
ExoTecFaçadePanelDensecompressedpanel.Squareedge.Factorysealedonallsixsides.Eachpanelhasadistinctivewhiteface,whichacceptsawiderangeofpaintfinishes.Thepanelmustbeinstalledwiththewhitesidefacingtheexteriorofthestructure.
Length(mm)
ExoTec Façade Panel 9mm
1190mm Width Code
2400 ✓ 402282
3000 ✓ 402284
RABBoardUsedasrigidairbarrierbehindthebuildingfaçades.Thegreensurfaceisfixedfacingthecavity.
Length(mm)
RAB Board 6mm
1200mm Width Code
2450 ✓ 402980
3000 ✓ 402981
16 Product and accessories
14 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand
AccessoriessuppliedbyJamesHardie
Accessiories Description Quantity/Size(Approx)
ExoTecTopHatProprietaryrolledzincalumcoatedAZ150steelsections124mmwidex35mmdeepx1.15mmthick.Designedtospanverticallyacrossthebuildingstructuretosupportthepanelsalongverticalpaneljointsandisolatemovementofthepanelsfromthoseofthestructure.
4800mmlengthsCode:304580
ExoTecintermediateTopHatRolledzincalumcoatedAZ150steelsections50mmwidex35mmdeepx1.15mmthick,designedtospanverticallyacrossthebuildingsupportstructuresandtobeusedasintermediatesupporttothepanels.
4800mmlengthCode:304581
ExoTecGasketSnapStripBlacksealingneopreneGaskets.SpeciallydesignedtoclipintotheExoTecTopHatatverticalsheetjointstocoverfixingstothestructureandtoprovideaninitialweathersealanddrainage.
4800mmlengthCode:304582
ExoTecTopHatCornerFlashingPressedmetalzincalumcoatedSection0.95mmthick.Usedininternalandexternalcornerdetails.
3000mmlengthCode:304661
ExoTecTopHatJMouldUsedatbuttjointswithothermaterialslikeconcreteormasonry.
3000mmlengthCode:304662
ExoTecTopHatBaseMouldTobeusedtocloseoffthecavityatthebase
3000mmlengthCode:304663
Aluminium‘T’Socket1.2mmthickaluminiumextrudedetchprimedhorizontaljointflashing.
2400mmlengthsCode:3041053000mmlengthsCode:304103
ExoTecFaçadeWasherOpaquenylonwasherfitsbeneaththeappropriateexposedheadfastenersandExoTecFaçadePanels.TheExoTecFaçadeWashersarefittedintheholesmadeforfixingtheexposedheadfasteners.
Packof1000Code:302761
Tools
HardieBlade™SawBladeDiamondtip185mmdiameterfibrecementcircularsawblade.Spacersnotincluded.
EachCode:300660
TungstenCarbideDrillBitUsedfordrillingholesforfixingthecountersunkfasteners.
EachCode:300567
14 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand 15
Accessories/toolsnotsuppliedbyJamesHardie
JamesHardierecommendsthefollowingproductsforuseinconjunctionwithExoTecFaçadePanelSystem.JamesHardiedoesnotsupplytheseproductsanddoesnotprovideawarrantyfortheiruse.Pleasecontactcomponentmanufacturerforinformationontheirwarrantiesandfurtherinformationontheirproducts.
Product Description
BuildingUnderlayMustcomplywithTable23ofE2/AS1ofnZBC.
JointSealingTapeUsedtosealtheverticaljointsofRABBoard.e.g.Protecto,ThermakraftorTyvek®
BondBreakerTapeUsedwhenfillingverticaljointstopreventsealantfrombondingtotophat.
6mmMasonryDrillUsedtopre-drillholesforexposedheadfasteners.
Bostik-‘SealnFlex-1’AdhesiveorSikaflex11FCAdhesivePolyurethaneadhesiverequiredtogluetheAluminium‘T’Sockettopanels.Canalsobeusedtofilltheexpressedjointsforwindpressuresabove4.0kPa.
EpoxyFlushSealing(2Part)CountersunkscrewholesareflushsealedusingHiltiCA273,nuplexFairingCreamorsimilarepoxy.
EpoxyApplicatorArecommendedmethodoffixingtheepoxyovercountersunkscrewheads.Thismethodminimisesthespreadingofepoxyoverpanelsurface.
FlexibleTapeAflexibleself-adhesivetapeusedinpreparationofawindow.Refertothewindowinstallationsectioninthismanualformoreinformation.e.g.Protecto,ThermakraftorTyvek®
Fasteners
CountersunkFasteners10gx30mmcountersunkheadselfdrillingscrews–Class4coatingFastenersmustbefullycompatiblewithallothermaterialthatitisincontactwithtoensurethedurabilityandintegrityofassembly.SuppliedbyEDLFasteners Code:34c101630cl4
WaferHead/PanheadFastener10gx30mmwafer/panheadscrew–Class4coatingSuppliedbyEDLFasteners Code:34w101630cl4
HexHeadScrewForfixingExoTecTopHatsectionsintotheframingsubstrate.ReferTable3tocheckdesigncapacityofthefastenerrequired.Choseafastenersuitabletowithstandwindpressures.SuppliedbyEDLFasteners Code:34621450Ncl4
PaintsandPrimers
UseDuluxAcraPrime501/1primerorDuluxPrimercryltosealthecutedgesofpanels.Usequalitypaintsonly.Refertomanufacturerforfurtherinformation.
TyVEK®FLEXWRAP™aretrademarksregisteredtoDupont
16 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand
17 Details
VariousdetailsoutlinedinthefollowingtableareavailableonPages17to31.
Details
Description Figure Page
HorizontalLayoutBrickGridPattern Figure1 17
VerticalLayoutBrickGridPattern Figure2 17
TypicalPanelandFramingLayout Figure3 18
WallBaseTypicalDetail Figure4 18
TopHatandPanelFixingDetail Figure5 19
CountersunkFastenerDetail Figure6 19
VerticalPanelJointDetail Figure7 20
PanelJointsinHighWindPressureAreasDetail Figure8 20
ExposedHeadFastenerDetail Figure9 21
ExoTecFaçadeWasherDetail Figure10 21
internalCornerDetail Figure11 22
ExternalCornerDetail Figure12 23
AngledExternalCornerDetail Figure13 24
CommercialWindowSillDetail Figure14 25
CommercialWindowJambDetail Figure15 25
CommercialWindowJambDetailUsing‘J’Mould Figure16 26
CommercialWindowHeadDetail Figure17 26
TypicalSoffitDetail Figure18 27
HorizontalPanelJointDetailatMidFloorHeight Figure19 27
installingUpperPanelOverAluminium‘T’Socket Figure20 28
SealingAluminium‘T’SockettoExoTecTopHatSection Figure21 28
VerticalJointTerminatingovertheHorizontalJoint Figure22 29
SealingAluminium‘T’SockettoExoTecTopHat Figure23 29
HorizontalStructuralJointDetail Figure24 30
VerticalStructuralJointDetail Figure25 30
ExoTecFaçadePanelandMasonryWallAbutmentDetail Figure26 31
WallJunctionUnderConcreteSlabDetail Figure27 31
16 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand 17ExoTec®FaçadePanel-TopHatRainscreen,Technical Specification February 2013newZealand17
Figure1:Horizontallayoutbrickgridpattern
Figure2:Verticallayoutbrickgridpattern
18 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand18 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand
Figure3:Typicalpanelandframinglayout
Figure4:Wallbasetypicaldetail
18 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand 1918 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand
Figure5:TopHatandpanelfixingdetail
Figure6:Countersunkfastenerdetail
20 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand
Figure8:Paneljointsinhighwindpressureareasdetail
Figure7:Verticalpaneljointdetail
20 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand 21
Figure9:Exposedheadfastenerdetail
Figure10:ExoTecFaçadewasherdetail
22 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand
Figure11:internalcornerdetail
22 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand 23
Figure12:Externalcornerdetail
24 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand24 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand
Figure13:Angledexternalcornerdetail
24 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand 2524 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand
Figure14:Commercialwindowsilldetail
Figure15:Commercialwindowjambdetail
26 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand
Figure17:Commercialwindowheaddetail
Figure16:Commercialwindowjambdetailusing‘J’mould
26 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand 27
Figure19:Horizontalpaneljointdetailatmidfloorheight
Figure18:Typicalsoffitdetail
28 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand28 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand
Figure21:Sealingaluminium‘T’sockettoExoTecTopHatsection
Figure20:installingupperpaneloveraluminium‘T’socket
28 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand 2928 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand
Figure22:Verticaljointterminatingoverthehorizontaljoint
Figure23:Sealingaluminium‘T’sockettoExoTec®TopHat
30 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand
Figure24:Horizontalstructuraljointdetail
Figure25:Verticalstructuraljointdetail
30 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand 31
Figure26:ExoTecFaçadePanelandmasonrywallabutment
Figure27:Walljunctionunderconcreteslabdetail
Notes
32 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand
Notes
32 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand 33
Notes
34 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand
Product Warranty
34 ExoTec® Façade Panel — Top Hat Rainscreen Technical Specification February 2013 New Zealand
Disclaimer:TherecommendationsinJamesHardie’sliteraturearebasedongoodbuildingpractice,butarenotanexhaustivestatementofallrelevantinformationandaresubjecttoconditions(c),(d),(f)and(g)above.JamesHardiehastestedtheperformanceoftheExoTecFaçadePanelandRAB®BoardwheninstalledinaccordancewiththeExoTec®FaçadePanelandTopHatTechnicalSpecification,inaccordancewiththestandardsandverificationmethodsrequiredbythenZBCandthosetestresultsdemonstratetheproductcomplieswiththeperformancecriteriaestablishedbythenZBC.However,asthesuccessfulperformanceoftherelevantsystemdependsonnumerousfactorsoutsidethecontrolofJamesHardie(e.g.qualityofworkmanshipanddesign),JamesHardieshallnotbeliablefortherecommendationsmadeinitsliteratureandtheperformanceoftherelevantsystem,includingitssuitabilityforanypurposeorabilitytosatisfytherelevantprovisionsofthenZBC,regulationsandstandards,itistheresponsibilityofthebuildingdesignertoensurethatthedetailsandrecommendationsprovidedintherelevantJamesHardieinstallationmanualaresuitablefortheintendedprojectandthatspecificdesignisconductedwhereappropriate.
CopyrightFebruary2013.©JamesHardienewZealand.TMand®denotesatrademarkorregisteredmarkownedbyJamesHardieTechnologyLimited.
February 2013JamesHardienewZealand(“JamesHardie”)warrantsforaperiodof15yearsfromthedateofpurchasethattheExoTec®FaçadePanelandRAB®Board(the“Product”),willbefreefromdefectsduetodefectivefactoryworkmanshipormaterialsand,subjecttocompliancewiththeconditionsbelow,willberesistanttocracking,rotting,fireanddamagefromtermiteattackstotheextentsetoutinJamesHardie’srelevantpublishedliteraturecurrentatthetimeofinstallation.JamesHardiewarrantsforaperiodof15yearsfromthedateofpurchasethattheaccessoriessuppliedbyJamesHardiewillbefreefromdefectsduetodefectivefactoryworkmanshipormaterials.
nothinginthisdocumentshallexcludeormodifyanylegalrightsacustomermayhaveundertheConsumerGuaranteesActorotherwisewhichcannotbeexcludedormodifiedatlaw.
coNditioNS oF warraNty: Thewarrantyisstrictlysubjecttothefollowingconditions:
a) JamesHardiewillnotbeliableforbreachofwarrantyunlesstheclaimantprovidesproofofpurchaseandmakesawrittenclaimeitherwithin30daysafterthedefectwouldhavebecomereasonablyapparentor,ifthedefectwasreasonablyapparentpriortoinstallation,thentheclaimmustbemadepriortoinstallation.
b) Thiswarrantyisnottransferable.
c) TheProductmustbeinstalledandmaintainedstrictlyinaccordancewiththerelevantJamesHardieliteraturecurrentatthetimeofinstallationandmustbeinstalledinconjunctionwiththecomponentsorproductsspecifiedintheliterature.Further,allotherproducts,includingcoatingandjointingsystems,appliedtoorusedinconjunctionwiththeProductmustbeappliedorinstalledandmaintainedstrictlyinaccordancewiththerelevantmanufacturer’sinstructionsandgoodtradepractice.
d) TheprojectmustbedesignedandconstructedinstrictcompliancewithallrelevantprovisionsofthecurrentnewZealandBuildingCode(“nZBC”),regulationsandstandards.
e) Theclaimant’ssoleremedyforbreachofwarrantyis(atJamesHardie’soption)thatJamesHardiewilleithersupplyreplacementproduct,rectifytheaffectedproductorpayforthecostofthereplacementorrectificationoftheaffectedproduct.
f) JamesHardiewillnotbeliableforanylossesordamages(whetherdirectorindirect)includingpropertydamageorpersonalinjury,consequentialloss,economiclossorlossofprofits,arisingincontractornegligenceorhowsoeverarising.WithoutlimitingtheforegoingJamesHardiewillnotbeliableforanyclaims,damagesordefectsarisingfromorinanywayattributabletopoorworkmanship,poordesignordetailing,settlementorstructuralmovementand/ormovementofmaterialstowhichtheProductisattached,incorrectdesignofthestructure,actsofGodincludingbutnotlimitedtoearthquakes,cyclones,floodsorothersevereweatherconditionsorunusualclimaticconditions,efflorescenceorperformanceofpaint/coatingsappliedtotheProduct,normalwearandtear,growthofmould,mildew,fungi,bacteria,oranyorganismonanyProductsurfaceorProduct(whetherontheexposedorunexposedsurfaces).
g) Allwarranties,conditions,liabilitiesandobligationsotherthanthosespecifiedinthiswarrantyareexcludedtothefullestextentallowedbylaw.
h) ifmeetingaclaimunderthiswarrantyinvolvesre-coatingofProducts,theremaybeslightcolourdifferencesbetweentheoriginalandreplacementProductsduetotheeffectsofweatheringandvariationsinmaterialsovertime.
CopyrightFebruary2013.©JamesHardienewZealand.TMand®denoteatrademarkorregisteredmarkownedbyJamesHardieTechnologyLimited.