TOPIC – Arial Bold 28Date: Calibri 16 Dark Gray

NEW COAL SAMPLING LABORATORY SOD TURNING CEREMONY

05 MAY 2015

2

CONTENT

BACKGROUND OF RBCT LABORATORY

CURRENT LABORATORY LOCATION

FUTURE LABORATORY LOCATION

NEW LABORATORY DESIGN

CURRENT FACILITY

BENEFITS OF A NEW LABORATORY

CONSTRUCTION INFORMATION

BACKGROUND OF RBCT LABORATORY

RBCT laboratory was commissioned in 1976, with numerous structural additions and alterations made over the years.

The laboratory facilitates the sampling process, analysis of coal and certification of export coal, in accordance with international standards.

The laboratory plays a big marketing role in maintaining RBCT’s international reputation as a world class operation.

The current design capacity of the terminal is 91Mt per annum.

The current laboratory has been upgraded over the years, however it is limited in terms of optimising efficiencies into the future.

CURRENT LABORATORY LOCATION

FUTURE LABORATORY LOCATION

NEW LABORATORY DESIGN

NEW LABORATORY DESIGN

CURRENT FACILITY

BENEFITS OF A NEW LABORATORY

It will Increase the throughput capacity of the current laboratory from 91Mt to 120Mt per annum, facilitated by a 60% increase of the physical space.

The improvement of the new building and design will support efficient laboratory operations and workflow.

The overall efficiency will increase by 25% and it will be achieved in the following areas:• Coal Preparation• Analysis• Certification

The architectural design of the new laboratory will sustain RBCT’s world class status.

.

CONSTRUCTION INFORMATION

.

Coal Sampling Service Providers : SGS South Africa (Pty)Ltd

Construction Company : Jawet Construction CC

Consulting Engineers : LTS Consulting Industrial Engineers

Project Duration : 12 Months

Expected Completion : May 2016

Estimated Project Value : R 50 Million

.

THANK YOU