TRACK WORKSMr. Preetam Ganguly
Infrastructure - Track Works - Page 2
Alstom Track Offering
> Concrete track> Ballast Track
MAIN LINES METROS TRAMWAYS > Direct fastening concrete
track> Sleepers concrete track> Ballast track
> Rubber wheel concrete track> Direct fixed concrete track> Sleepers concrete tracks> Depot ballast track
> Compliance with every track specifications
> Ballast Track
TW5
> Concrete Track with sleepers for LRT
TW1
> Concrete Track using APPITRACK
TW2
> Concrete track for rubber tyre metro
TW4
> Concrete track for steel wheel metro
TW3
Infrastructure - Track Works - Page 3
Some track works figures
285 124
406
92
522
1 428
-
200
400
600
800
1 000
1 200
1 400
1 600
Km
of s
ingl
e tr
acks
TW1 TW2 TW3 TW4 TW5 TOTAL
Reference solutions
Kilometers of single tracks
TW120%
TW29%
TW328%
TW46%
TW537%
5 references solutions
Concrete track with sleepers for LRT
Concrete track using APPITRACK
Concrete track for steel wheel metro
Concrete track for rubber
wheel metro
Ballast track
Infrastructure - Track Works - Page 4
Complete track works capabilities
>Strong for design & procurement support in French Office
> Recruitment of skilled people for local design office
> Minimise expatriates : Project Manager and Construction Manager
HUMAN RESOURCES SOURCING EQUIPMENTS> Local investigations on
heavy plants & tools available for renting
> Accurate availability planning of in house heavy equipments
> Local : Pre-cast concrete sleepers plant, concrete
> Regional : rail, ballast, sleepers> International : clips, turnouts
> Alstom has a local approach to every track project worldwide
Infrastructure - Track Works - Page 5
Our Key Expertise : Track EngineeringIn‐depth Expertise provides cutting‐edge as contractor
> Conceptual Eng. and global Performance• Environmental (Noise&Vibration, stray current…)• Track alignments definition and optimisation• Interfaces with other subsystems• Reliability, Availability, Maintainability, Security
performance• Safety case
> Detailed design• Technical specification• Components design and type tests• Construction drawings• Constructability of design• Survey methods
Infrastructure - Track Works - Page 6
Innovative infrastructure solutions
> R&D products and solutions are based on a proven design already implemented on existing projects
HATTHigh attenuation tram track
APPITRACK Track laying technology
High Attenuation SleeperAntivibration solution
GG8
Infrastructure - Track Works - Page 7
APPITRACK PROJECTS
Infrastructure - Track Works - Page 8
APPITRACK Modern technology for track laying
Step 1 : Slipformed concrete
Step 2 : Fasteners insertion
Step 3 : Completed slab with fasteners
Step 4 : Completed track
Step 5 : Finished track
Infrastructure - Track Works - Page 9
APPITRACK - Automatic Pin & Plate Inserter for TRACK
> Accelerates construction => up to 6 times less than the traditional method
> Preserves the environment and reduces carbon emission
> Reduces civil works, concrete volumes and dust> Reduces noise and disturbances> Ensures cost effective & high quality track
construction due to the machine’s high precision> Less painful operations and 3 to 4 times less
accident hazards
Average daily speed in linear meter : 150 lm for tram (maximum 403 lm) 400 lm for metro
> A fully mechanized installation method developped by Alstom
Infrastructure - Track Works - Page 10
-Average Appitrack output: 95 lm / day-Average Manual teams output: 21 lm / day-19km done as of today in appitrack/completed
-Average Appitrack output: 79 lm / day-Average Manual teams output: 18 lm / day-16km done in appitrack out of 33km
-Average Appitrack output: 128 lm / day-Average Manual teams output: 22 lm / up to 5 teams- 14km done in appitrack/completed
-Average Appitrack output: 130 lm / day-Average Manual teams output: 22 lm / day
APPITRACK Some project data
> JERUSALEM PROJECT – Completed
> ALGIERS PROJECT – As of 28th February 2011
> REIMS PROJECT – Completed
> CLEO PROJECT – As of 28th February 2011
> Installation program can be more aggressive to increase Appitrack usage
Infrastructure - Track Works - Page 11
APPITRACK Metro – A new solution
> Tests successfully done in Singapore (length of pumping > 400m)
> Control of concrete consistency test successfully done in Singapore for slipforming
Appitrack (optimised) versus typical project (excluding depot) - 12,2 %
> Optimised planning
> Optimised cross section (less concrete)
> No Stray Current Corrosion Control (to be estimated)
> Comparable perimeter as a new typical project
> Insertion tests done with rebars
> Successful Pumping Tests (> 400 m)
> Development of fastening systems with approved suppliers
> Free for tender in November 2010
> 30 potential projects within 4 years
Infrastructure - Track Works - Page 12
HAS (High Attenuation Sleeper) : An alternative to floating slab track
Infrastructure - Track Works - Page 13
HAS - High Attenuation Sleeper An alternative to floating slab track
Fastening system according
to customer choice
Concrete sleeper Rigid plastic hull
Holes for conductor rail support
Polyurethane seal
> Use of a rigid hull• Reduction of stiffness (no vertical friction between sleeper and hull)• Friendly maintenance (sleeper easily clipped in the hull)
> Concept of track with sleepers• Friendly construction (standard production rate without discontinuity)• Reduction of tunnels diameter (FST systems being thicker)
> Concept of track with sleepers• Attenuation higher than 20dB at 63Hz
Infrastructure - Track Works - Page 14
Advantages of HAS over FST
> Less concrete (optimisation of the cross section)
> Less manhours required for installation
> Same method than rest of the line
> No stress on the linear planning of works
> Adjustable to specific Rolling stock data
> Friendly Maintenance
HAS sleeper
Infrastructure - Track Works - Page 15
HATT : High Attenuation Tram Track
Infrastructure - Track Works - Page 16
HATT – High Attenuation Tram Track
> Preserve neighbourhood comfort• Attenuation over 10 dB• Urban insertion
> Reduce floating slab track quantity• Reduction of more than 25%
of the trackworks costs• Reduction of worksites costs• Reduction of interfaces (Civil
Works, drainage, APS)
> An existing alternative solution• Proven system: already
installed• « proven use » and « proven
design » system type • Trackworks antivibratil
systems installation • Continuous rail support • Less concrete and no tapis
Infrastructure - Track Works - Page 17
TRACK WORK REFERENCES
Infrastructure - Track Works - Page 18
Tram ReimsTram RouenTram La Rochelle LRTTram Strasbourg ElecTram Lyon Tram Montpellier ElecOrly Val Toulouse Tram Bordeaux extGrenoble Tram Paris MRT Meteor
Metro Caracas
Metro Mexico
Tram AlgiersMaroc Fes -MeknesTram Constantine
Metro Santiago
Tram L1 Orléans
Metro Lausanne
Tram Dubai
Metro Istanbul Marmaray
Milan L5 ext. Italy
Tram Firenze L2&3
Athens Suburban
Metro L2 & 3 Athens
Metro Cairo
HSL CTRL 2 - UK
Tram Sao Paulo 3rd
RailTram Brazilia
Metro Taiwan
Metro Singapore MRT ExtSingapore NEL ExtSingapore Downtown Line
Tram Buenos Aires
Bangkok MRT Blue Line
Metro Chennai/India
Tram Jerusalem
Venezuela MRT Los Teques
Track Platform - Main references
Infrastructure - Track Works - Page 19
www.alstom.com
Recommended