Transmission & Substations Area Research Priorities · 2016-09-18 · Transmission &...

Preview:

Citation preview

© 2015 Electric Power Research Institute, Inc. All rights reserved.

Dr. Andrew Phillips

Transmission &

Substations Area

Research Priorities

2© 2015 Electric Power Research Institute, Inc. All rights reserved.

In the Event of an Emergency

In the event of an emergencyREMAIN IN PLACE unless there is animmediate danger. Listen to audiblemessages for further instructions. Incase of evacuation, proceed tonearest stairwell and exit on groundlevel. Gathering Location: DiplomatLanding directly across from hotel.Hotel is fully equipped with anautomated Fire System, whichinclude sprinkler and smoke evac.

To call the emergency line: Pick upany guest phone or house phone anddial 28888 to be connected to the 24hour security dispatch emergencyline, or dial 911

Security, Engineering and the Fire Department are automatically notified and will respond to the main fire control panel and to the location of the alarm. Update messages will be played via the Public Address (PA) System.

In the hotel, the alarm will sound two floors above and two floors below the location of the alarm. The Convention Center is a full alert alarm.

The Fire Department, Paramedics and Police have a normal response time of 5-10 minutes. The nearest hospital is 3 miles from the hotel.

3© 2015 Electric Power Research Institute, Inc. All rights reserved.

Emergency Services Contacts

Safety & Security Management

Contacts:

Frank Becker 954-602-8801

Director of Safety & Security

frank.becker@diplomatresort.com

Omar Tigoudar 954-602-8802

Safety & Security Manager

Omar.tigoudar@diplomatresort.com

Emergency & Medical Services Information:

Memorial Regional Hospital 954-987-2000

& Joe DiMaggio Children’s Hospital

3501 Johnson Street

Hollywood, Florida 33021

Aventura Hospital 305-682-7000

20900 Biscayne Blvd

Aventura, Florida 33180

Premiere Total Healthcare 954-456-0250

One Stop Medical Center

1250 East Hallandale Beach Blvd, 2nd Floor

Hallandale, Florida 33009

Fast Care 786-923-4000

Urgent Care Clinic

20601 East Dixie Hwy. Suite 340

Aventura, Florida 33180

AM/PM DOC 888-AM-PM-DOC

House Call Doctor

24 Hour a Day Emergency Medical Service

4© 2015 Electric Power Research Institute, Inc. All rights reserved.

https://crowd.cc/s/j0wQ

App Download URL:

Or use the URL to access on your desktop or laptop

https://crowd.cc/pdufall2016advisory

5© 2015 Electric Power Research Institute, Inc. All rights reserved.

Transmission and Substations Programs

P35 Overhead Transmission

• Asset Management -Decision

Bases

• Reference Books

• Design

• Lightning and Grounding

• Increased Power Flow

• Live Working

P37 Substations

• Asset Management Decision

Bases

• Reference Books

• Fleet Management

• Physical Security

P36 Underground• Asset Management Decision

Bases

• Reference Books

• Design and Construction

• Pipe Type Cables

• Extruded Cable

P162 HVDC

• New Applications of HVDC

• Electrical Effects

• Planning

6© 2015 Electric Power Research Institute, Inc. All rights reserved.

Focus: Increase Advisors Ability to Collaborate

Understand Past Influence Plan Know the Output

Understand the Value

Your Organization The Industry

Be Familiar with the Process

7© 2015 Electric Power Research Institute, Inc. All rights reserved.

In Your Packet

Last Year’s

Results

What the

Plan is

What we will

Deliver this Year

Understand Past Influence Plan Know the Output

8© 2015 Electric Power Research Institute, Inc. All rights reserved.

In Your Packet

IDB Info

Your Utility vs. Industry

What ARP your

Utility joined

Who You Task Force Reps Are

& What They Attended

Understand the Value Your Organization

9© 2015 Electric Power Research Institute, Inc. All rights reserved.

Background:

Surge arrester failure on transmission line

Cause was unknown – need to determine reason for failure

EPRI Response:

Detailed tear down inspection to determine failure mode

Value:

Knowledge on failure mode

– Determined potential issues related to population

performance

– Improved design specifications

Enhancement of EPRI research benefitting the industry

Transmission line Surge Arrester Failure Investigation-Value Received - Michael Fourman (Georgia Transmission)

Understand the Value The Industry

10© 2015 Electric Power Research Institute, Inc. All rights reserved.

Prog. Mar-15 Oct-15 Feb-16 Sept-16

P35

P36

P37

P162

Value Slides Presented in 2015 & 2016

Understand the Value The Industry

11© 2015 Electric Power Research Institute, Inc. All rights reserved.

Prog. Mar-15 Oct-15 Feb-16 Sept-16

P35

P36

P37

P162

Value Slides Presented in 2015 & 2016

Understand the Value The Industry

12© 2015 Electric Power Research Institute, Inc. All rights reserved.

Value Determination Application

ARP Tasks From

Action Plans

Rating by

Assigned Task

Force Advisors

On-line Value

Determination

Application

Stakeholder Review:

- Utility Decision Makers

- Task Force Reps

- EPRI

Understand the Value Your Organization The Industry

13© 2015 Electric Power Research Institute, Inc. All rights reserved.

In Your Packet –

Quick Reference

Guide

Be Familiar with the Process

14© 2015 Electric Power Research Institute, Inc. All rights reserved.

Be Familiar with the Process

Value Tool

15© 2015 Electric Power Research Institute, Inc. All rights reserved.

Upcoming Task Force Meetings

EPRI Campus

Charlotte, North Carolina

Task Force Week: January 30 – February 3, 2017

Overhead Transmission Program 35

• Inspection, Assessment and Asset

Management TF

• Lightning, Grounding and Insulation

Coordination

• Line Design

• Live Working

• Insulators

• Increased Transmission Capacity

Underground Transmission Program 36

• UG Taskforce

Substation Program 37

• Transformer Life Management

• Substations Equipment Asset Management

• Circuit Breakers & SF6

• Other Substation Equipment, Ratings and

Grounding

• Switching Safety and Reliability

• Protection and Control

High Voltage DC Program 162

• HVDC Taskforce

16© 2015 Electric Power Research Institute, Inc. All rights reserved.

Improved Opportunity for Guidance of R&D Effort

Guide RoadmapIdentify New Areas

for Research

17© 2015 Electric Power Research Institute, Inc. All rights reserved.

Send Text to: 22333

EPRIT

Participate in Interactive

Polls and Brainstorming

18© 2015 Electric Power Research Institute, Inc. All rights reserved.

Where does Häagen Dazs Ice-cream Originate from

Frankfurt, Germany

Copenhagen, Denmark

Zurich, Switzerland

Brooklyn, NY

Stockholm, Sweden

19© 2015 Electric Power Research Institute, Inc. All rights reserved.

What Assets do you have Responsibility for?

Overhead Lines only

Overhead & Underground Lines

Overhead, Underground Lines & Substations

Underground only

Underground Lines & Substations

Substations Only

20© 2015 Electric Power Research Institute, Inc. All rights reserved.

What Area do you Work in?

Engineering

Standards

Maintenance

Asset Management

Equipment Subject Matter Expert Group

21© 2015 Electric Power Research Institute, Inc. All rights reserved.

22© 2015 Electric Power Research Institute, Inc. All rights reserved.

Which is the Most Important Future State for T&S?

New Components and Materials

Advanced Design & Construction

Enhanced Inspection & Assessment

Improved Monitoring & Automation

More Resilient Assets

Advanced Asset Management Analytics

23© 2015 Electric Power Research Institute, Inc. All rights reserved.

Which is the Least Important Future State for T&S?

New Components and Materials

Advanced Design & Construction

Enhanced Inspection & Assessment

Improved Monitoring & Automation

More Resilient Assets

Advanced Asset Management Analytics

24© 2015 Electric Power Research Institute, Inc. All rights reserved.

Is there a Future State we should Add?

25© 2015 Electric Power Research Institute, Inc. All rights reserved.

Is there a Future State we Should Delete?

New Components and Materials

Advanced Design & Construction

Enhanced Inspection & Assessment

Improved Monitoring & Automation

More Resilient Assets

Advanced Asset Management Analytics

26© 2015 Electric Power Research Institute, Inc. All rights reserved.

Is there a Future State we Should Edit?

New Components and Materials

Advanced Design & Construction

Enhanced Inspection & Assessment

Improved Monitoring & Automation

More Resilient Assets

Advanced Asset Management Analytics

27© 2015 Electric Power Research Institute, Inc. All rights reserved.

Action Plans

Program Presentations will be Polling you for:

What is their most important

Future State?

What is the most critical

Asset Type?

What is the most important Issue?

What Issues should be added:

– Annual Research Portfolio (ARP)

– Technology Innovation (TI)

28© 2015 Electric Power Research Institute, Inc. All rights reserved.

Is there a Cross-Cutting Effort that should added to T&S?

29© 2015 Electric Power Research Institute, Inc. All rights reserved.

Is there a Cross-Cutting Technology Innovation (TI) Effort

added to T&S?

30© 2015 Electric Power Research Institute, Inc. All rights reserved.

Mark Your Calendar

Upcoming EPRI PDU Advisory Meetings in 2017

Program Meetings: February 13-15, 2017

Council Meetings: February 15-16, 2017

Hyatt Regency-Huntington Beach

21500 Pacific Coast Highway

Huntington Beach, Ca 92648

www.huntingtonbeach.hyatt.com

Group Rate: $239

Program Meetings: September 11-13, 2017

Council Meetings: September 13-14, 2017

Hyatt Regency Denver

650 Fifteenth Street

Denver, CO 80202

Hyatt Regency Denver

Group Rate: $225

31© 2015 Electric Power Research Institute, Inc. All rights reserved.

EPRI European PDU Advisors Meeting

May 17 & 18, 2017

London, England

Open to EPRI Members and Invited Utility Guests

Please join us for the first annual EPRI PDU Advisors meeting

with breakout sessions in:

Transmission & Substation

Grid Operations and Planning

Distribution

Energy Utilization

Information and Communication Technology

Cyber Security

SAVE-THE-DATE

32© 2015 Electric Power Research Institute, Inc. All rights reserved.

Mark Your Calendar

Upcoming EPRI PDU Advisory Meetings in 2017

Program Meetings: February 13-15, 2017

Council Meetings: February 15-16, 2017

Hyatt Regency-Huntington Beach

21500 Pacific Coast Highway

Huntington Beach, Ca 92648

www.huntingtonbeach.hyatt.com

Group Rate: $239

Program Meetings: September 11-13, 2017

Council Meetings: September 13-14, 2017

Hyatt Regency Denver

650 Fifteenth Street

Denver, CO 80202

Hyatt Regency Denver

Group Rate: $225

Recommended